Ground part
Remove the original terrazzo floor and dry lay 1m× 1m anti-skid floor tiles.
Wall part
Demolition of the original decorative board wall, wall decoration design according to the sound absorption board.
platform
Demolition of the original old podium, the use of advanced composite floors, or laying carpets.
Rostrum background wall
Redesign the renovation plan. The left and right sides of the rostrum are designed with a tuning room and a leadership lounge or an actor's entrance and exit room.
Window part
Remove the old aluminum alloy windows and replace them with new plastic steel doors and windows and external protective nets (stainless steel materials).
Curtain part
Adopt double-layer shading curtain, inner shading curtain and outer light-transmitting curtain.
Modeling T-shape
The top is completely removed, and the design scheme of the top of the modern multifunctional conference room is redesigned, including the lighting part.