The first phase of the ore wharf adopts high-piled beam-slab structure, with a total length of 808 meters, including 735 meters of berthing coastline, and the bottom elevation of berthing water area at the front of the wharf is -25 meters. The wharf yard area has an effective length of 148 1 m, an effective width of 399 m and an area of 580,000 square meters. * * * Set up 6 storage points with a storage capacity of 5 million tons.
At present, the loading and unloading system of Phase I terminal is equipped with six bridge-type ship unloaders, with a single-click unloading capacity of 2,500 tons/hour; Two unloading lines are arranged from the dock to the storage yard, and the maximum transportation capacity of each line is 7500 tons/hour. Five belt conveyor lines are arranged in the field; Equipped with one stacker-reclaimer, two reclaimers and two stacker-reclaimers, which can run four reclaimer lines at the same time. There are two car loading lines with a loading capacity of 2,500 tons/hour. Two train loading lines and a belt conveyor line lead to fine steel base.
The 5-65438+ million-ton bulk cargo terminal was put into operation on August 8, 2007, which is located in the northwest of the ore terminal. The total length of the wharf is 525m, the water depth is 14m, the designed annual throughput is 3.5 million tons, the yard area is 260,000m2, and the loading and unloading system is equipped with eight 40-38m gantry cranes.