How to clean the floor of Maoming parking lot?
1. During the maintenance period, no personnel or equipment are allowed to enter the epoxy floor, and measures such as rainproof and waterproof are taken. The maintenance period is usually at least 7 days, and it can only be put into use after the maintenance period.

2. Generally, after 7 days (the temperature is 20 degrees), the epoxy floor structure is completely stable and achieves ideal physical and chemical properties.

3. The epoxy floor needs to be kept clean and hygienic. It is suggested that when entering the floor, you should change into soft-soled shoes (such as rubber shoes). If there are dust particles and broken particles of hard objects, they should be cleaned in time to prevent hard and sharp objects from rubbing the floor directly, so as to avoid sliding the floor after rolling. When people come in from the outside, they should not bring in dust. Different forklifts should be used for internal and external occasions.

4, hard heavy objects must be put down gently, to avoid overweight machines, objects directly hit the floor paint, to avoid sharp objects scratch.

5. Remove oil stains and chemicals in time: Remove oil stains and chemicals spilled or dripped on it in time, otherwise it will make the ground slippery and easy to cause injuries, and at the same time, it will cause corrosion for a long time, which will affect the appearance and service life. When the dirt is serious, use a neutral detergent, clean it with a rag, then clean it with water and dry it fully.

6. General floor cleaning and maintenance methods can be used for cleaning and maintenance, and soft mops and rags can be used for daily cleaning.

7, the newly completed epoxy floor should avoid other decoration work, so the construction of epoxy floor should be arranged after the completion of all decoration projects.

Generally speaking, the epoxy floor can only bear the temperature of 70℃ at most. Therefore, for areas that often need electric welding or oxygen cutting, steel plates or other high-temperature resistant isolation pads should be laid on the ground.