Current location - Plastic Surgery and Aesthetics Network - Wedding planning company - On-site safety assessment method?
On-site safety assessment method?
In order to strengthen the safety and civilized construction management of the project construction site, urge the construction unit to improve its own safety and civilized construction management level, and ensure that the project construction site meets the requirements of the Municipal Construction Committee for affordable housing projects, these Measures are formulated. Conduct on-site safety appraisal and inspection once a month in accordance with the requirements of safety civilization appraisal in these Measures. At the same time, according to the inspection results and the management of on-site safe and civilized construction, the specification requirements are implemented, and the timely rectification units are encouraged in time. Units that fail to rectify seriously or rectify badly will be punished. The maximum reward amount is 3000 yuan, and the maximum penalty amount is 3000 yuan. Appraisal time: weekly joint inspection, scoring by construction units and supervision units, appraisal inspection at the end of the month to determine the unit ranking. (1) Minimum standard for safe and civilized construction: 1. The construction site must be closed: (1. 1) The height of the construction fence shall not be lower than 1.8m, with firm structure and beautiful appearance; (1.2) The construction fence at the gate or frontage should be built with mortar, and billboards should be hung on the frontage fence; (1.3) The entrance and exit of the site shall be equipped with gates and double transverse doors, which can be opened flexibly and the height shall not be lower than1.8m; The door head of each bid section is installed in place. (1.4) There shall be no construction waste, water and building materials outside the fence. 2. All kinds of mechanical equipment, temporary facilities, building materials and roads on the construction site must be arranged in strict accordance with the layout plan of the construction site at each stage. 3. The construction site must be smooth, and it is forbidden to park all kinds of non-construction vehicles; The roads in the site shall be managed by designated personnel, and the construction unit shall clean the designated roads every day to keep them clean and tidy. 4. The fence and baffle are one meter away from the road, and greening is carried out between the baffle and the road. 5. The materials piled up on the construction site must be square, and the bulk materials should be stacked in files and marked. 6. The fixed machinery and equipment on the construction site should be cleaned and maintained in time, and must be protected by scaffolding. Operating instruction cards and equipment signs must be hung next to the equipment. 7. The materials on the working face of the construction site should be neatly stacked, so that "the work is finished, the materials are exhausted and the feet are clear". 8. Safety net: When the construction reaches the second floor, a safety net must be hung. The safety net should be neat, and the bottom of the net should not be less than 5 meters away from the surface of the object below. 9. Slogan banners: Slogan banners are unified and eye-catching, and non-compliant banners must be replaced. 10. Strengthen the management of water and electricity in the construction site, making it an impermanent running water and a constant light. 1 1. All kinds of temporary facilities on the construction site must be firmly structured, spacious and bright, and well ventilated; On-site offices, warehouses, dormitories, kitchens and toilets must have hardened floors, and the indoor clear height shall not be less than 2.6m.. The on-site office is neat and orderly, and all management systems are complete. At least the following contents shall be hung on the wall of the site office: (1 1. 1) post responsibility system; (1 1.2) network plan; (1 1.3) construction layout; (1 1.4) project quality, safety and civilized construction guarantee system; (1 1.5) The workload actually completes the progress chart month by month; (1 1.6) weather barometer for engineering construction. 12. All kinds of bags (boxes) in the warehouse on the construction site should be stacked and packed, and small pieces and bulk materials should be stored on shelves; The wall should be hung with the material management system and the responsibilities of the material clerk. 13. The staff dormitory on the construction site has no floor, and the daily necessities such as indoor beds and staff clothes are neatly arranged; 14 site kitchen: the stove must be tiled, and the screen door, screen window and gauze skirt are complete; Outdoor domestic garbage enters the pool, and the sewage pool is sealed with a cover. 15. The toilet on site shall be managed by special personnel, and the management system and responsible person shall be clearly defined; The surrounding area shall be cleaned in time, and there shall be no water and dirt on the ground, and the fly killing measures shall be effective. 16. The construction site should do a good job in fire control and public security, set up security agencies, formulate on-site safety system and guard system, strengthen public security management, and prevent public security incidents; Formulate fire-fighting measures, complete fire-fighting equipment, and designate special personnel to be responsible for management.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd