Basis: 1. Dig the main column position around the foundation rockery to the depth of hard bottom.
2. Drive a pile with a height of 50*50 every 2 meters in the foundation dug by the dig-hole pile, and use 4 16# steel bars internally.
3. In the position of foundation rockery, the reinforced concrete foundation surface with a thickness of 20CM is laid on the pile, and the 16# threaded steel bar is laid with a 20CM grid and two layers of steel bars.
Internal structure of rockery: 1. Main skeleton The main skeleton uses 4*4 angle steel as the main column every 2.5 meters.
2. The auxiliary skeleton is welded by the main skeleton with 4×4 and 3×3 angle irons every1.2m. ..
Peripheral 1. The steel mesh is welded into a grid with 6# steel bars every 20CM on the skeleton to make it rock-like.
2. The main skeleton and steel mesh are treated with antirust paint.
3. Tie steel wire mesh and wrap 0.5*5 steel wire mesh on the shape of steel bar.
3. Hang hemp knife ash, and apply a layer of cement hemp knife ash on the steel wire mesh with a thickness of about 10 mm.
4. After solidification, put a layer of cement mortar on the outside of the sculpture and carve it into a rock-like shape. The thickness is about 3-5 cm.
5. Coloring Use special pigments to spray Party A's ideal color effect.
Mailin simulation art landscape engineering construction team faked.