Building structure
Phoenix Bridge in Xuancheng City is located in the middle section of Zhang Die Road in the east of Xuancheng City, in the middle reaches of Wanxi River, and crosses Wanxi River from east to west. It is a reclining double-basket arch bridge, also known as half-through tied arch bridge (commonly known as basket bridge), with a total length of 373.26 meters and a span of 80 meters, in which the main bridge is 35 meters wide and observation decks are built on both sides of the main bridge. The observation deck is an arc landscape platform, with a length of 80 meters and a width of 7.5 meters.
Historical background
According to historical records, Phoenix Bridge was built in Sui and Tang Dynasties (around 590 AD). Li Bai, a poet in the Tang Dynasty, once said in a poem, "Two waters and one mirror, two bridges and a rainbow." It depicts the original Phoenix Bridge. The original Phoenix Bridge was once the top ten scenic spots in ancient Xuancheng. It has a history of 1000 years and has been repaired many times in history. 1937, bombed by Japanese planes.
After the founding of New China, Xuancheng Municipal People's Government has repeatedly repaired Jichuan Bridge, one of the "Double Bridges". At the beginning of 1984, the county people's government decided to rebuild the Phoenix Bridge. In September, 1985, the new bridge was declared completed. Its structural type is truss arch bridge with a span of 60m and a bridge width of 12. 0 meters (in which the roadway is 8 meters wide), and the elevation of bridge head is 15. 94 meters. Bridge railings and bridge lights are fully equipped, and it was officially renamed as "Phoenix Bridge". Stone tablets are embedded in the east and west ends of the bridge, engraved with the words "Phoenix Bridge" and the date of establishment of Xuancheng County People's Government. 1985 national day, the county people's government held a grand opening ceremony of Phoenix Bridge. The heads of Xuancheng prefectural party committee and administrative office also cut the ribbon for the bridge. After more than 20 years of use, the load-bearing structure of Fenghuang Bridge has been damaged due to the long construction period, low design standards and the passage of heavy vehicles in recent years, which can no longer meet the requirements of safe use and urban development, and has been listed as a dangerous bridge management by the municipal management department. With the completion of the reconstruction project of overlapping obstacle road, on April 1 day, 2006, the municipal government decided to build a new bridge on the old bridge site according to the cross section of overlapping road. On April 8, 2006, traffic control was carried out on the section of Fenghuang Bridge, and the bridge was demolished by blasting. May 2006 17 at 3: 30 pm.
The reconstruction project of Phoenix Bridge started in July 2006 10, and was completed and opened to traffic in June 2007 10. Now the newly-built Phoenix Bridge has become a new beautiful scenery in Xuancheng.
For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.