1, the basic information of the lessor and lessee can be written in the forklift lease contract first. 2. Secondly, you can write forklift lease, such as the basic situation of leased equipment, lease term, settlement method, etc. 3. Finally, both parties need to sign.
Forklift lease contract template 1
Party A:
Party B: _ _ _
According to the needs of engineering construction and the contract law, in order to clarify the relationship between the rights and obligations of both parties, the mechanical lease contract is signed by both parties through consultation, and both parties must abide by it.
I. Details, uses and places of use of the leased equipment
1. Name of leased equipment:
2. Lease purpose: road engineering construction.
3. Use Project: Raofu Highway Shengli to Qianfeng Farm Highway Project.
2. Lease term: Party A leases the equipment from Party B, and the lease period starts from.
Third, the rental fee.
1. The rent is RMB yuan per month, and RMB yuan is calculated on a daily basis for less than one month.
2. The final lease term is subject to the working ticket signed by both parties.
Four. Responsibility of both parties
Party A:
1, responsible for the one-way freight of equipment.
2. Party A shall be responsible for equipment damage and mechanical accidents caused by improper command of Party A. ..
3. Party A is responsible for providing accommodation and necessary living conditions for Party B's vehicle-mounted personnel.
4. When Party B's equipment is maintained, Party A shall provide necessary maintenance fees, and the borrowed money shall be deducted from the equipment rental fee.
5. Party A shall provide Party B with necessary pre-job training before construction, and do a good job in safety production and technical disclosure.
Party B:
1. Provide equipment with good performance and skilled operators.
2. Party B's random personnel shall obey the arrangement of Party A's on-site commander, abide by Party A's on-site management rules and regulations, cooperate with Party A to correctly use the equipment to complete the construction operation, strictly implement the equipment safety operation procedures, and bear the consequences caused by illegal operation.
3. Party B's equipment shall be in good condition, and the normal working days shall be no less than 28 days per month. If the number of days is less than 28 days, the monthly rent shall be reduced by the number of days and paid by the day.
4. Party B's equipment maintenance shall be carried out during the non-construction period. If there is any fault, it should be repaired immediately, otherwise it will be handled according to the preceding paragraph.
5. Party A shall provide the main oil and bear the expenses.
Verb (short for verb) Both parties agree.
Party A shall pay the equipment rental fee in full after the completion of the construction period. When Party B fails to provide the work as agreed in the contract, Party A has the right to notify Party B in advance to terminate the contract, and the rent shall be settled according to the second paragraph of Article 3.
This contract is made in duplicate, one for each party. For matters not covered, both parties shall make supplementary provisions after consultation, and the supplementary provisions shall have the same effect as this contract.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Forklift lease contract template 2
Lessee: (hereinafter referred to as Party A)
Lessor: (hereinafter referred to as Party B)
According to the Contract Law of People's Republic of China (PRC) and relevant regulations, in order to clarify the rights and obligations of both parties to equipment leasing, Party A leases Party B's construction machinery according to the needs of the project. Through friendly negotiation, Party A and Party B sign the following agreement on machinery leasing for both parties to abide by.
First, the model:
2. Leased place of use:
Three. Lease term: years, subject to Party A's notice.
Four, mechanical equipment lease form and settlement method:
1. Party B leases machinery and equipment from Party A in the form of monthly rent, which is RMB in words: RMB/month. During the lease period, the salary of the equipment operation driver shall be paid by Party A, and the salary standard shall be subject to Party A's salary standard. ..
2. Party A shall be responsible for the freight and oil expenses generated by the machinery and equipment during the lease period;
3. Rent settlement method: In principle, Party A shall settle the rent for Party B on the 25th of each month and pay the rent of last month.
4. Party B shall be equipped with qualified drivers and hold valid local operation certificates to ensure Party A's construction needs. ..
Verb (abbreviation for verb) Rights and obligations of both parties.
1. During the lease period of machinery and equipment, Party B's mechanical driver shall obey the work arrangement of Party A. Because Party B's driver does not obey the arrangement of Party A, Party A has the right to request a replacement of the driver and terminate the contract. Drivers are fully responsible for their own safety in mechanical equipment and operation. Operate in strict accordance with the operating rules of mechanical equipment, and do not operate in violation of regulations, otherwise all safety accidents caused thereby shall be borne by Party B at its own expense;
2. Party B shall be responsible for the repair and maintenance of machinery and equipment and the corresponding expenses, with the intact rate not less than 28 days per month, and one day shall be deducted from the monthly rent for less than one day to ensure the normal construction of Party A;
3. All formalities (certificate of conformity, technical inspection certificate, etc.) must be handled for the mechanical equipment provided by Party B for Party A.. ). Party B shall be responsible for all the responsibilities such as being detained by local authorities due to incomplete procedures of machinery and equipment;
5. Party B's mechanical equipment shall be neat in appearance, with good technical performance and normal operation to meet the construction needs. When mechanical equipment breaks down and Party B cannot repair it within the specified time, it shall take measures in advance to ensure the normal construction of Party A's project;
6. The mechanical equipment managers and drivers of Party B must obey the management of Party A and strictly abide by the management system of Party A;
7. Party A has no right to sublet, auction or mortgage Party B's equipment.
Liability for breach of contract of intransitive verbs:
Both parties must strictly implement the terms of this contract. Without the consent of the other party, neither party may change or terminate the contract halfway. If either party violates the provisions of this contract, it will be responsible for compensating the other party for all losses caused thereby;
2. All disputes related to this contract shall be settled by both parties through friendly negotiation in accordance with the relevant provisions of the Contract Law and other relevant laws;
3. This contract is made in triplicate, with Party A holding two copies and Party B holding one copy, which shall come into effect as of the date of signing, and each copy has the same legal effect. After the mechanical equipment exits and is settled, the contract will automatically become invalid.
Party A (seal): Party B (seal):
Representative: representative:
Telephone:
Signing time: Signing place:
Forklift lease contract template 3
Party A: City New Materials Co., Ltd. "hereinafter referred to as Party A"
Party B: individual carrier: hereinafter referred to as Party B.
1. When building workshops 1 2 of high-performance rare earth luminescent materials factory, Party A needs to lease Party B's excavators and forklifts for earthwork excavation. Party B's existing excavators and forklifts can be used for Party A's earthwork excavation. Through negotiation, Party A agrees to lease Party B's excavators and forklifts to excavate the earthwork required by Party A, and the agreement is as follows.
Two. The specific negotiation details are as follows:
1. Party B enters the site to carry out the earthwork excavation required by the first and second workshops of Party A (the surplus part shall be borne by Party A), and the lump sum settlement shall be made, with excavator 2 10 yuan/hour, crane 270 yuan/hour and forklift 220 yuan/hour.
Three. Payment method: Party A shall confirm with Party A's on-site representative for the team excavated by Party B, and Party A shall pay within 5 days after Party B issues a legal invoice to Party A after all excavation is completed. ..
4. Party A rents Party B to excavate earthwork for Workshop 1 and Workshop 2, and Party B shall not delay it for any reason, otherwise other construction projects on site will be stopped and Party B will bear corresponding responsibilities.
Verb (abbreviation of verb) The above matters have been reached through careful consideration by both parties, and both parties shall perform this contract as agreed. This contract is made in duplicate and shall come into effect as of the date of signature.
Seal of Party A: Signature of Party B:
20_ Year Month Day
The above is what Bian Xiao shared today, and I hope it will help everyone.