1, Director of Planning and Design Department:
Job description:
Be fully responsible for the technical and management work of the planning and design department, and be responsible for the work plan, capital plan and contract management of the design department; Responsible for design changes and technical support in engineering construction, supervise the implementation process and effect of this department, and make overall coordination with other relevant departments.
Job responsibilities:
A. Be fully responsible for the work of the design department, and be responsible for planning, organizing, coordinating and supervising;
B, responsible for the department's tasks, formulate task objectives, implementation principles and departmental assessment system;
C, responsible for the work plan, capital plan and contract management of the design department;
D, organize the preliminary investigation of the operation project, participate in the project planning and positioning, and complete the overall project planning;
E, responsible for supervising the implementation process of this department's work, and coordinating with other relevant departments in general.
F, assist in planning the project plan, coordinate and guide the project, and clarify the information indicators of specific projects to ensure that the project conforms to the architectural design plan;
G, organize project design bidding and contract negotiation;
H, research, understand and track the development trend of similar buildings at home and abroad in planning and design, and provide research reports regularly.
2. Architect of Design Department: (More than 5 years working experience)
Job description:
Mainly undertake the design and engineering cooperation work assigned by the company's superior manager, complete the file arrangement of the project in charge and submit it to the planning and design department Commissioner for the record; Manage, implement, coordinate and supervise all the work of the project; According to the time requirement of the project, mobilize the assistant designer to check and draw all the design drawings of the project; Responsible for good coordination and communication with companies or departments related to the project to help the smooth implementation of the project.
Job responsibilities:
A, undertake the design tasks assigned by the company's superior manager, organize and plan the design members, carry out as required, implement and supervise the completion, and complete the data arrangement of the managed projects.
B, responsible for the organization, management, implementation, coordination and supervision of projects assigned by superiors;
C, responsible for coordinating and communicating with companies or departments related to the project to help the smooth implementation of the project;
D, according to the time requirements of the project, complete the review and plotting of all design drawings of the project, as well as the selection and confirmation of materials used in the project;
E, carefully read through the architectural drawings of the project, and put forward problems and objections related to interior design to relevant departments (R&D Department, etc.) in time. ) and cooperate with relevant departments (R&D department, etc.). ) timely modification and solution, in order to facilitate the smooth progress of the project;
F. Fill in the "Design Change Form" in time according to the changes in the progress of the project, draw the change drawings in time, and organize the signing and recognition of design changes;
G. Complete the "Project Work Schedule" on a regular basis and submit it to the department leaders, supplement and repair it in time according to the progress of the project, establish the electronic document of the above form and back it up on the company server, so that the superior leaders can check the progress, progress and changes of the project in time;
H, according to the company's standard design requirements, organize the preparation and review of design drawings, material samples, construction drawings, as-built drawings and materials (legal documents), submit them to the department head for review, and submit them to the Planning and Design Department Commissioner for the record;
First, assist the management department to do a good job in the pre-budget (final) calculation of project funds, keep abreast of the operation of funds during the project, and feed back to the management department in time to effectively control costs;
J, assist the bidding procurement department to optimize the material selection, effectively control the project cost, cooperate with the establishment and improvement of the main material exhibition center, procurement channels and the establishment of long-term partners and qualified products list;
K, design guidance, drawing architectural design drawings and renderings
M. Organize or participate in product development and implementation of related projects;
N, complete the debriefing report on a regular basis, and evaluate the project assistant designer of this department. Design responsibility
1. Under the leadership of the technical department and the production department manager (general manager), complete the drawing design task to ensure the design quality and effect of the drawings.
2. Be responsible for establishing and perfecting various rules and regulations and management procedures of this department.
3. Be responsible for the development of new valve products, track the production process of valves, formulate and improve technical standards, and put forward suggestions for product improvement and new product development.
4. Responsible for implementing the product design scheme, writing relevant technical documents and solving the design problems in product production. Record all kinds of work elements in time and prepare complete drawings and product documents.
5. Modify and improve the design according to the requirements of users or departments, and finally determine the product design; Cooperate with R&D department to complete trial production and deal with design problems.
6. Be responsible for the drawing design of GB, API and EN standard globe valves, gate valves and check valves, and be responsible for the accuracy and completeness of the drawings.
7. Assist the quality and sales department to solve customer technical problems, improve customer service, and solve technical problems in contract performance and after-sales maintenance.
8. Assist the Marketing Department to complete the external quotation; Collect product standards and standard updates.
9. Responsible for mechanical drawing design of valve products, including product assembly drawing, parts drawing, mold drawing and packaging material drawing. , complete the product structure design, and formulate the corresponding production technology and process.
10. Assist technical department to complete product certification, such as API and TS.
1 1. Do a good job in production technical guidance, process improvement, analysis and solution of quality problems.
12. Follow up the design of products, master the performance and quality, and be responsible for the problems.
13. Be responsible for the selection, configuration and technical guidance of valve products to ensure the smooth completion of the project.