1. What's the difference between a semi-package and a full package?
The buyers of 1. materials are different.
Semi-package decoration means that the builder is responsible for the design and construction of the decoration project and the procurement of auxiliary decoration materials, and the owner undertakes the procurement and transportation of the main decoration materials, so that he can have enough initiative in the quality control of materials. The specific items to be purchased can be determined by both parties through consultation before renovation, in case they cannot be purchased in time. The contractor shall be responsible for the all-inclusive decoration, and the owner shall be responsible for all the expenses of the whole construction and raw material purchase.
2. The participants in the decoration style are different.
The repair of semi-packaging requires the owner and the construction party to discuss the decoration style in advance. Before the partial construction of the house, both parties shall prepare complete decoration drawings to facilitate the purchase of objects. In the process of decoration, the builder can also adjust the interior decoration style in time according to the specific color and shape of the items purchased by the owner. Generally speaking, the whole decoration process can be changed at will. All-inclusive decoration is carried out according to the decoration drawings designed by the construction party. After being approved by the owner, the decoration is carried out in strict accordance with the design drawings, and the probability of changing it again is relatively small.
3, the duration is different
In the actual operation process, it is very easy for people to choose the purchased items repeatedly when they are not satisfied. The purchased materials do not meet the building standards, and the materials are not transported in time, sometimes delaying the construction period. On the other hand, all-inclusive decoration, because the construction team has rich decoration experience and relevant channels for collecting raw materials, has less difficulty in purchasing and transporting materials, so it can generally be completed on schedule, and some may be completed ahead of schedule.
Second, how to choose the difference between half-package and all-package?
1, all-inclusive: check the contract.
Choose this way, friends must close the contract, not only to review the rationality of various expenses, but also to mark the brand, model and color of the main materials they need, and beware of the decoration team stealing columns. At the same time, in addition to signing a unified renovation contract, you can also sign a supplementary contract with the company, and then clarify the rights. The specific version can be downloaded online. In addition, we must grasp the acceptance and payment links of key nodes. If possible, we must attend every acceptance and payment.
2, half a package: you need to beware of wrangling.
In the specific operation, the responsibilities of the landlord and the decoration team need to be clearly defined in advance. For example, if you buy the floor yourself and the decoration team is responsible for the installation, you must make it clear in advance, and then add the purchase fee, camphor wood block and moisture-proof pad who will be responsible. In addition, the materials purchased by both parties must be checked and accepted by the other party when entering the site, and the construction will be carried out after approval.
After understanding the contents of the above article, we will know the difference between semi-package and all-package and the advantages of the difference between semi-package and all-package Want to know more about home improvement, please continue to pay attention.