Other precautions during the construction process of formwork engineering?

What are the specific contents of other precautions during the construction process of the formwork project? Zhongda Consulting will answer them for you below.

During the construction process of the formwork project, the construction quality control procedures of the formwork project are strictly followed. In addition, preventive measures are formulated for some common quality problems to nip them in the bud to ensure the construction quality of the formwork project. Strictly implement the disclosure system. Before operation, there must be an individual construction plan and a written technical disclosure to the construction team.

(1) Use 36V low-voltage power supply to erect wires on the template and use power tools.

(2) When working at height, various accessories should be placed in tool boxes or tool bags and are strictly prohibited from being placed on formwork or scaffolding.

(3) During the dismantling construction, there should be people above and below to support and fix it at all times to prevent overturning and running when it is dismantled. The moving parts should be firmly fixed. It is strictly forbidden to stack or throw them on the scaffolding.

(4) Measures to prevent lightning strikes

(5) When installing wall column formwork, support and fix it at any time to prevent overturning.

(6) When installing the pre-assembled formwork, it is necessary to put it in place, correct it, install connecting parts, and add temporary supports to stabilize it.

(7) Remove the load-bearing formwork and install temporary supports to prevent sudden collapse of the whole piece.

(8) When installing the entire column formwork, column steel bars must not be used as temporary supports.

(9) When hoisting the formwork, the formwork must be in place and firmly connected before unhooking. And strictly abide by relevant safety regulations for the use of hoisting machinery.

(10) When dismantling the formwork, be directed by a dedicated person and take practical and reliable safety measures, and mark the operating area below. Non-operators are strictly prohibited from entering the operating area. Operators must wear safety belts and are not allowed to stand on the crossbars of the formwork. The removed formwork should be lifted together and tied tightly at multiple points. Do not drop it and throw it away. During the interval between formwork removal, securely fix the movable formwork, tie rods, supports, etc. to prevent sudden falling or collapse and injury to people.

(11) Before removing the formwork and lifting, recheck whether the wall demolition bolts are completely removed, and then make sure that there are no omissions and the formwork and the wall have completely fallen off before lifting.

(12) Construction is prohibited due to rain, snow, level 5 winds and other weather conditions.

(13) There should be no wires, gas welding pipelines, etc. when placing the formwork.

(14) It is strictly prohibited to use a large bar or heavy hammer when dismantling the formwork. After the formwork is dismantled, the concrete slag should be cleaned promptly. A dedicated person will be responsible for proofreading the geometric dimensions of the formwork, and repair any excessive deviations in a timely manner.