Is Foxconn Plastic Workshop Tired?
Tired. According to the inquiry of Foxconn Plastic Workshop, the work pressure of Foxconn Plastic Workshop is also heavy. The work content is to assist the supervisor to handle the daily work, obey the supervisor's work arrangement, and coordinate the daily production plan, such as production manpower arrangement, application materials, equipment, fixtures, delivery arrangement, etc.