construction contract of epoxy floor paint-construction technology of epoxy floor paint:
1. plain ground treatment:
1. the ground is based on cement or grindstone.
2. The ground should be left for more than 28 days, and the water should be 8% or less. If the ground is uneven or empty, it must be removed first.
3. Fill the floor with epoxy mortar.
4. Clean the oil on the ground.
5. keep the floor dry and clean before construction.
2. Priming coat
1. In order to keep the floor clean, then mix the main agent and curing agent.
2. Adjust the viscosity of the mixture according to the ground conditions, and then apply it within 4 hours.
3. The bottom layer only hardens in about 8 hours.
III. Intermediate coat
1. In order to keep the floor clean, then mix the main agent and curing agent.
2. Add some quartz sand to the mixture.
3. use a trowel to evenly spread the material.
4. The mixture should be completed within 3 minutes after completion.
5. do a good job of handover.
6. The hardening time of the intermediate coating exceeds 8 hours.
IV. Batch soil layer
1. Mix the main agent and hardener.
2. Use a spatula to evenly spread the material.
3. The mixture should be finished within 3 minutes.
4. The hardening time of batch soil is 8 hours or more.
5. Top coating
1. Keep the floor dry before construction.
2. stir well before using the main agent.
3. mix and mix the main agent and the hardener.
4. The mixture should be finished within 3 minutes after mixing.
5. do a good job of handover.
construction contract of epoxy floor paint-matters needing attention in the construction of epoxy floor paint
1. Substrate-A good substrate is the guarantee of good application of epoxy floor paint. We suggest that experts go to the site to guide the construction of floor painting, so as to avoid the poor effect of epoxy floor paint caused by poor primer effect.
2. Materials-All epoxy floor paint materials used in the preparation must be strictly checked. All incoming materials should be inspected to prevent the use of unqualified products.
3. Tools-High-quality rollers, spray guns, paint brushes, textured paper and other tools and auxiliary equipment must be used to avoid quality problems caused by poor tools.
4. Personnel-Each construction worker must be given on-the-job technical training. All construction personnel should be familiar with the technical indicators and construction methods of the construction process, and it is absolutely not allowed to blindly construct and operate wildly, especially it takes more than three years of work experience to apply top paint.
5. The construction temperature is ≥ ≥5°C. If you want to work at 5 C, choose a special formula. It is recommended that the humidity below 75% be under construction.
6. Ensure air circulation during construction. When using the modulation amount, it should not exceed 3 minutes.
7, do a good job of maintenance in the construction process, to avoid dust intrusion, affect the paint surface effect.
8. After the construction, it must be kept for at least 7 days before it can be put into use. In particular, there is no infiltration of water or various solutions during curing.
9. It is forbidden to mix with other pigments.
1. It must be added to the curing agent in strict proportion.
11. Keep the surface of the object to be cleaned, and the water content of the coated object must be less than 7%.
12. Keep the painting environment clean, and construction in dusty environment is not allowed.
The above are some contents about the construction contract of epoxy floor paint compiled by Xiaobian for you today, hoping to bring some help to you. The construction process of epoxy floor paint is actually very simple, just follow the steps introduced in Xiaobian above step by step, and friends who need it can try it themselves. Thank you for reading.