Three stages: preparation stage-construction stage-completion acceptance stage;
Four areas: filling area-leveling area-rolling area-inspection area;
Eight procedures: construction preparation-basement treatment-layered filling-paving and leveling-sprinkling water (airing)-rolling and tamping-inspection and visa-pavement shaping (slope renovation).