How to ensure the construction quality
1 scientific management, establish and improve various management systems: formulating post responsibility system and various rules and regulations is the primary task and important part of enterprise management.

2. Raise awareness and strengthen the management of front-line workers: to improve the level of construction management, we must take the lead in thinking, that is, we must first raise management awareness.

3. Organize the construction, and strive to do a good job in project quality and safety management: when directing various projects, the project manager must do a good job in project quality and safety management, and organize multiple units at a construction site.

4. Grasp the information of the construction market and strengthen the project cost control: With the rapid development of modern scientific management methods, the project manager must fully understand and understand the new materials and trends in the construction market at home and abroad. First, based on the construction drawing, quantitative analysis and a lot of market research are carried out to prevent unqualified products from entering the market.

5. Take measures to protect construction machinery: the control of machinery includes the control of the cost of construction machinery, equipment and tools. According to different process characteristics and technical requirements, choose the appropriate mechanical equipment.

6. Strengthen the control of the construction process and improve the project quality: Excellent project quality is directly produced in the construction process, and the builder and quality engineer of the project department must inspect and supervise the construction operation process of the operation team, including the operation methods and techniques.

Based on:

1.*** Same-sex basis.

It refers to the basic conditions that are applicable to the construction stage, related to quality management and have universal and universal guiding significance.

Mainly includes: engineering construction contract; Design documents; Design disclosure and records of the blue prints.the design, design modification and technical change, etc. Issued by the relevant departments of the state and government

Promulgate laws and normative documents related to quality management, such as "Construction Law", "Bidding Law" and "Regulations on Quality Management".

2. Professional technical regulations.

Refers to the special technical regulations formulated for different industries and different quality control objects.

Extended data:

Engineering quality management is a long-term and meticulous process, which runs through the whole process and every link of construction and needs a strong sense of responsibility and a good sense of innovation. The problem that the repair mouth of extended circumferential seam UT flows into the next process without nondestructive testing. If this problem is not found and handled in time, it will cause the risk of large-scale rework and material waste, and become a serious quality hazard.

Through analysis and research, effective rectification measures are determined, the location of defects is accurately repaired, and appropriate repair equipment and technology are selected to meet the repair conditions. At the same time, in the process of repair welding, process monitoring should be strengthened, and defects should be completely eliminated by means of preheating before welding and interlayer temperature control.

By taking effective rectification measures, the quality awareness, construction organization, construction technology, construction technology and personnel deployment of construction personnel are comprehensively strengthened, which not only prevents quality hidden dangers from affecting the subsequent assembly work and the progress of the whole project, but also takes measures such as strengthening quality awareness, strengthening process quality management and strengthening communication to avoid similar hidden dangers in subsequent construction.