Current location - Plastic Surgery and Aesthetics Network - Plastic surgery and beauty - What are the precautions for template installation?
What are the precautions for template installation?

During the construction process of the formwork project, the construction quality control procedures of the formwork project are strictly followed. In addition, preventive measures are formulated for some common quality problems to nip them in the bud to ensure the construction quality of the formwork project. Strictly implement the disclosure system. Before operation, there must be an individual construction plan and a written technical disclosure to the construction team.

(1) Plywood should be of uniform specifications, with smooth and smooth panels and good waterproof performance.

(2) When entering the site, the wood should be planed and straightened to a uniform size, and stacked neatly. The lower opening of the wood should be padded flat.

(3) After the formwork is assembled with panels, the four sides are planed to ensure that the external corners of the walls, columns, and floors are straight.

(4) The base layer of the wall formwork is installed and leveled, and sponge strips are pasted. The lower end of the formwork is close to the pre-made positioning reference to ensure the correct position of the formwork and prevent grout leakage at the bottom of the formwork. Continue to install the formwork on the exterior wall. Before installation, set the template support pads and correct their straightness.

(5) The pull bolt holes of the wall formwork are straight and facing each other, and the inserted bolts must not be diagonally pulled into the hard top. The interior wall bolts should be covered with hard plastic pipes. The length of the plastic pipes should be 2~3mm less than the wall thickness.

(6) The dimensions of the door and window opening templates must be accurate. After correcting the square angles, reinforce and fix them diagonally. Stretch with wooden strips to prevent deformation.

(7) The horizontal braces and scissor braces provided for the pillars shall be arranged according to the structure and overall stability.