Safety disclosure of decoration project?
The following is the related contents of safety disclosure of decoration project brought by Zhong Da Consulting for your reference.

Before the decoration project construction, the construction unit should first check the construction site, identify the hazard sources, formulate the corresponding safety plan, and conduct safety disclosure work for the construction personnel.

In the process of construction, the construction should be carried out in strict accordance with the specifications. Do not damage the original thermal insulation facilities of the house, do not damage the stressed steel bars, do not overload the centralized stacking of goods, do not drill holes to install embedded parts on the precast concrete hollow floor, do not change the main structure of the building without authorization, do not dismantle or change the supporting facilities such as gas, heating and communication without authorization, set up safety protection facilities at the edges, holes and passages, and take fall prevention measures when workers work high above the ground.

Decoration projects involving gas pipelines must be completed by qualified construction units. Construction personnel also need to abide by laws and regulations on construction safety, labor protection, fire prevention and gas protection.

In terms of electricity consumption, we must abide by the rules and regulations, so that the temporary construction electricity system will be set up in the construction site. The installation, maintenance or removal of temporary construction power system shall be completed by electricians. Install leakage protector in temporary construction power switch box. The power cord entering the switch box shall not be connected with bolts. Temporary power lines should avoid places where inflammable and explosive articles are piled up. When the construction is suspended, the power supply should be cut off.

In terms of water use, we should do: do not store water on the waterproof ground, and ensure that the temporary water pipes are not damaged or leaked. When the construction is suspended, the water source should be cut off. Construction personnel should also dress neatly in the construction process and obey the supervision and management of the personnel of the construction unit and supervision unit.

The pollution and harm of dust, pollutants, noise and vibration to surrounding residents, residential areas and urban environment should be controlled.

Building materials shall not be piled up in evacuation parts such as main passages and fire stairs to avoid blocking emergency exits. Outdoor stacking shall comply with the regulations of the construction unit and avoid public facilities such as public passages, green spaces and septic tanks. Engineering waste should be sealed and packed and put into the designated garbage dump. Do not block or damage public facilities such as water supply and drainage pipelines and garbage lanes, and do not damage various public signs in the building. The construction site should be cleaned up before the project acceptance.

In terms of materials, the varieties, specifications and properties of materials used in decoration engineering should meet the design requirements and the current relevant national standards. It is strictly forbidden to use materials explicitly eliminated by the state. Decorative materials should be fireproof, anticorrosive and moth-proof according to the design requirements. The main materials should have product qualification certificates, and there should be corresponding performance test reports and Chinese descriptions if there are special requirements.

Decoration engineering should pay attention to the protection of finished products and semi-finished products. When using elevators to transport materials, protective measures should be taken for elevators. When handling materials, avoid damaging the ceiling, walls, handrails, corridor windows and corridor doors in the corridor. Each type of work shall not pollute or damage the semi-finished products and finished products of other types of work during construction. After the project is completed, the protective film on the surface of the material should be removed. Protection measures should be taken for public facilities such as mailbox, fire protection, power supply, TV, alarm and network. In the process of decoration construction, strict fire control management, decoration materials should be placed neatly, and the quantity should be controlled to prevent excessive accumulation. Flammable garbage should be cleaned in time to keep the construction site clean and tidy.