1, small area local spray drying: within one day;
2. Large area local spray drying: one day;
3. Spray drying of the whole vehicle: at least two days.
It is also necessary to divide the belt without sheet metal repair. If sheet metal repair is needed, it will take a little longer.
This is mainly to ensure quality.