The local gap between the bottom of the template and the base can be filled with cement mortar to prevent slurry leakage. And should support accurate and firm, joint tight level off, there can be no separation, staggered joints and inequality. The joint shall not leak slurry.
The contact surface between formwork and concrete shall be coated with release agent. Before concrete pouring, the formwork shall be thoroughly inspected. During construction, the plane and elevation of the formwork shall be checked regularly with a level gauge. Do not meet the requirements, be adjusted and strictly controlled. Unqualified templates should be reworked, and concrete can only be poured after all the inspections are qualified.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd