2). Clean the road dust and obstacles;
3) Appropriate fillers can be used to repair deep pits or small holes (gaps) on the pavement;
4). Clean up the oil stain or dirt on the pavement with an appropriate cleaning agent, then rinse it with water, and start construction after it is completely dry;
5) Before construction, the road surface must be dry. Wet roads can be dried by hot compressed air machines, especially in winter. The road surface must be heated and the resin coagulation must be accelerated.
6). Within the construction scope, use kraft paper tape or adhesive tape to seal the edges, and then measure the area of the construction scope, so as to calculate the construction dosage of resin;
7). The optimum construction temperature of pavement is between 15-35℃.
8). The new asphalt pavement should be opened to traffic for at least 6 weeks before the construction of colored anti-skid pavement. (Manual construction method)
1, after pavement construction.
2, set the road cleaning marking.
3. Draw a baseline according to the requirements of design drawings.
4, pay-off positioning
5, after the supervision engineer to check the construction.
6. Surface treatment and cleaning
7, around the tape.
8. Apply epoxy adhesive evenly on the road surface to be colored with special tools;
9, according to the design requirements and color selection of non-slip aggregate;
10, recycling excess colored aggregate.