Prepare tools
Prepare the necessary tools.
Installing bottom basin
Assemble all parts of the bottom basin, adjust the level of the bottom basin, and ensure that there is no water in the basin and the bottom of the basin. The hose can expand and contract with the distance to firmly connect the basin bottom with the floor drain.
Positioning and punching
Use pencil and level to determine the drilling position of aluminum against the wall, and use impact drill to drill holes.
Installing aluminum material
Knock rubber particles into the hole and lock the aluminum strip on the wall with screws.
Install movable door
Install the hardware of movable door, and install the hinge at the reserved hole of fixed door. After installation, adjust the position of the lotus leaf shaft core until the door feels best.
Fixed glass
Clamp the glass in the drilling hole of the bottom basin and lock it, then fix it with screws.
Install pipe jacking
Find the corresponding position above the fixed glass, drill holes, install (straight/oblique) fixed seats and connect the pipe jacking. Fix it on the top of the glass with an elbow sleeve.
Installing shelf
Install the shelf in an accurate position, tighten the laminated nut and fix the laminated glass to keep it vertical and horizontal. Pay attention to waterproof under the aluminum material that fixes the glass.
waterproof
According to the requirements, install water absorbing strips or water blocking strips on the side or under the glass. Seal the joints between aluminum and walls, glass and bottom basin with silicone gel.
Debugging and fastening
Check whether all components are comfortable and smooth to use, and adjust them in time when problems are found. After adjustment, tighten the corresponding screws to make the whole shower room more firm.
Dressing plant
Clip the decorative aluminum strip into the wall-hung aluminum to ensure its neat and generous appearance. Finally, the whole shower room needs to be wiped clean with a rag.