Because the clean workshop requires higher environment and standards than ordinary workshops, and it also involves building construction and related purification equipment, the cost will be relatively high, ranging from hundreds of thousands to hundreds of thousands or millions of yuan. In the actual construction process, after the ceiling and wallboard are installed, the film must be torn, cleaned and glued at the same time.
Introduction of dust-free workshop:
1, the cleanliness of clean workshop and the continuous stability of pollution control are the core standards for testing the quality of clean room. According to the regional environment, purification degree and other factors, the standards generally adopt international standards and domestic industry standards. In addition to the prevailing standards, some well-known purification engineering companies also have their own purification indicators higher than international standards, and their purification ability and environmental adaptability far exceed international brands.
2. Generally, industrial aluminum materials (stainless steel square pass and plastic-sprayed square pass) are used as the frame, the fan filter screen unit FFU supplies air, anti-static curtains are hung around, and the top is covered with a blind plate to form a closed joint area, and the internal purification level can reach100-65438+100000; It is especially suitable for areas with high cleanliness requirements in the workshop, such as high-precision product assembly areas in assembly line operation areas.
Refer to the above content: Baidu Encyclopedia-Clean Workshop