What equipment do you need to run a small transformer factory? Please tell us.
Main equipment: winding machine, setting machine, oven, paint dipping pool (vacuum), cutting machine, welding machine, forklift (lifting) and local cattle.
Main instruments: load test (resistance box), electric bridge, shaking table, multimeter, three-phase electrical parameter tester, thermometer and decibel meter.
Main personnel: technology, winding, assembly, finance and procurement.