During construction, the grease layer should be completely replaced after drying. The first putty drying time is15-25min, and the concave and convex parts should be filled with putty. The greasy layer can be polished with 100-360 priest cloth, and the abrasive cloth becomes fine from coarse to fine, which reduces or reduces the yarn marks at the grass-roots level and improves the fineness of the putty layer, which is helpful to ensure the decorative effect of the building system. The greasy layer needs a second shave to make up for the first time. The role of greasy is to level the wall and achieve the purpose of leveling. You can't scrape it too thick, but the putty layer is easy to crack. At the same time, pay attention to the edge treatment of uneven yin and yang, and strive to be horizontal and vertical. The second drying time of putty is 15-25 times that of dry joint.
According to the actual situation of wall flatness, the wall must be greasy. This process is very important and should be cautious when the wall is smooth and the angle of yin and yang is straight. Meet the technical requirements of texture coating construction. The primer roller is constructed with alkali-resistant primer produced by our company. But when you brush, you should take turns to brush, so that the precise part can roll back to its original position, completely covering the wall, and it will not bloom or turn green. According to the special situation of the project, the finished product is required to be protected by plastic film, adhesive tape and colored cloth to prevent paint pollution. The main color sealing shall be carried out after the above-mentioned projects are completed and meet the requirements of the main color sealing project. The main paint is decorated with the texture paint produced by our company, and the texture paint is formed at one time. The scraping process is very important. Be careful when choosing construction experts who have many years of experience in the construction of textured coatings. The big wall should be scraped flat, and there should be no traces of iron plate.
After completing the above process, the whole work must be sorted out, and it is also very important to clean the whole building beautifully and neatly, so as to achieve the design quality goal. Scaffolding must be too close to the wall during construction, about 30 cm. There may be seam marks in the application area between the upper and lower scaffolding, which will affect the decoration effect. During construction, the temperature should be higher than 5, and construction cannot be carried out when the wind force is greater than 4. Rain and snow weather should be avoided within 24 hours after the main coating is sprayed. After the main coating is completed, the tools should be washed with water immediately. During construction, it is forbidden to add water to dilute materials. The line of yin and yang should be scraped flat and clear. The second project can be carried out after the first drying, but the second scraping is more detailed than the first one. After the first two processes are completed and before drying, uniform force should be used when shaping with special tools, and special attention should be paid to obtaining the beauty of the pattern surface.