The bearing capacity determines the construction method.
The bearing capacity of the original structure is the primary factor to decide which method to use to build the steel sandwich. The steel frame is light in weight, but the weight of the whole bearing plate will also increase when it is used together, so the weight of the whole structure will also increase. It is necessary to pay attention to the device selection of load-bearing plate when building steel sandwich.
Selection of industrial workshop buildings
If the steel structure floor is built as an industrial workshop, it is more suitable to choose the steel structure and steel plate composite floor. In industrial plants, most of them are consumed by large-scale mechanical equipment, and the load is heavy. It is appropriate to choose the floor of the machine that can bear the heavy load equipment.
Selection of floor slab
Bearing plates can be divided into steel-cement pressure plate composite floor, steel-concrete composite floor, steel light bearing plate composite floor and steel-steel plate composite floor. Each bearing plate has its own characteristics and needs to be selected according to actual needs.
Formulation of construction plan
Every building structure needs to make a matching construction plan. Through field measurement, data are established, and corresponding design is provided according to actual needs, thus ensuring the rationality of the whole structural building.