1, large hopper → electromagnetic feeder (vibrating feeder), model ZD-3→ vertical shaft sand maker, model PCL-900→ vibrating screen, model ZYK- 1860→ sand powder separator, model SF-600.
2. Large hopper → electromagnetic feeder (vibrating feeder), model ZD-3→ vertical shaft sand maker, model PCL-900→ roller crusher model 2PGS800Y→ vibrating screen, model ZYK- 1860→ sand powder separator, model SF-600.
Scheme 2: Using limestone as raw material, 80-100t of fine sand can be produced per hour.
Hopper → linear vibrating feeder, model GZD-300X900→ jaw crusher, model PE-500X700→ impact crusher, model PF- 12 10→ vibrating screen (four floors), model 4YK- 1548.
Ps: Final sand production is 0-5,5 5- 10/0,10-20,20-40 (mm).
Scheme 3: Production per hour 120 tons.
1, large hopper → linear vibrating feeder, model GZD-380X960→ jaw crusher, model PE-600X900→ impact crusher, model PF- 12 14→ vibrating screen (four floors), model 4YK-65438.
2. Large hopper → linear vibrating feeder, model GZD-380X960→ jaw crusher, model PE-600X900→ spring cone crusher, model PYB- 1200→ vibrating screen (four layers), model 4YK- 1548.
Ps: The second scheme is suitable for granite.
Scheme 4: Production per hour 180-220 tons.
1, hopper → vibrating feeder, model zsw490x1/kloc-0 → jaw crusher, model PE-750X 1060→ vibrating feeder, model GD- 1000-3→ compound cone crusher. GD- 1000-3 → High-efficiency molding sand maker, DWSI- 1250 → vibrating screen, 3YK-2 160.
Ps: The final sand production is 0- 10, 10-20, 20-30, 30-40(mm) 1. The structural layout is reasonable, and there are two inspection ports on both sides of the crushing chamber, which is convenient for inspection and maintenance.
2, stable operation, low working noise, high efficiency and energy saving, and high crushing efficiency;
3, dry and wet materials can be ground and finely blocked;
4. The impact liner and the impact block are made of wear-resistant materials, with long service life;
5, the airflow in the vortex cavity is self-circulating, and the dust pollution is small;
6, a variety of installation methods, mobile installation;
7. The finished product has small particle size, good particle shape and little iron pollution. 1, bearing
The bearing of the crusher bears all the load of the machine, so good lubrication has a great relationship with the bearing life and directly affects the machine.
Service life and running rate, so the injected lubricating oil must be clean and well sealed. The main oil injection place of this machine (1
) Rotating bearing (2) Roller bearing (3) All gears (4) Movable bearing and sliding plane.
2. Newly installed tires are easy to loosen, so they must be checked frequently.
3. Pay attention to whether all parts of the machine work normally.
4, pay attention to check the wear degree of parts, pay attention to replace worn parts at any time.
5. Place the underframe plane of the movable device, and dust and other things should be discharged to avoid that the movable bearing cannot be on the underframe when the machine encounters materials that are not easy to break.
During the movement, it caused a serious accident.
6, bearing oil temperature rise, should immediately stop to check the reason to eliminate.
7. If there is any impact sound during operation, immediately stop rotating the gear for inspection, and eliminate 1. The equipment shall be installed on a horizontal concrete foundation and fixed with anchor bolts.
2. When installing, pay attention to the verticality between the main body and the level meter.
3. After installation, check whether the bolts of each part are loose and whether the main engine door is fastened. If so, please fasten it.
4. Configure the power cord and control switch according to the power of the equipment.
5, after inspection, can be empty load test run, normal test run.