1. Pre-preparation: Prepare the tools and materials needed to install the cabinet baffle in advance.
2, elastic thread: this process requires two people, starting from both ends of the cabinet bottom, first straighten the thread, and then prepare the elastic thread. Elastic line is also to facilitate the determination of installation horizontal line and ensure the horizontal and vertical position of baffle installation.
3. Punching: punch holes in the horizontal position where the line has been laid. The diameter distance of the hole is about10mm, and the depth is 30mm. ..
4. Solid wood wedge: coat the adjusted glue adhesive on the wedge, and then smooth the wedge with the wall.
5. Manufacture of the baffle at the angle of Yin and Yang: The size of the mold for manufacturing the baffle should conform to the size.
6. Corner treatment: At the intersection of the corner and the baffle, cut both sides of the baffle into an oblique angle of 45 degrees, so that the decorative effect will be better.