When was Guang Zhouta built? Who is the designer?
Guang Zhouta Building Materials: Construction site: Chigang Tower, Haizhu District, Guangzhou, opposite Zhujiang New Town. Commencement date: 165438+20051October 25th. Completion date: The main tower is expected to be capped on September 27th, 2009. Coverage area:175460m2. Building area: 168. The total height is 600 meters (originally 6 10 meters, but later it was reduced to 10 meters due to aviation safety requirements). Floor: 37-story structure: reinforced concrete structure Investment unit: Guangzhou TV Station, Guangzhou Construction Investment Company Design unit: arupqualification, British designer: Dutch designer mark hemel Construction unit: Baosteel Company English name: Canton Tower.