Concentrate grade+tailings grade = raw ore grade (100%)
Concentrate grade * concentrate output+tailings grade * tailings output = raw ore grade * raw ore output.
It can be concluded that: raw ore rate/concentrate rate (beneficiation ratio) = (concentrate grade-tailings grade)/(raw ore grade-tailings grade).