Current location - Plastic Surgery and Aesthetics Network - Jewelry brand - Has the highway from Ninghua Chengguan to Hucun been rebuilt?
Has the highway from Ninghua Chengguan to Hucun been rebuilt?
have

The report has been submitted by the Municipal Communications Department and approved by the Provincial Development and Reform Commission.

The approval opinions are as follows: 1. In the highway project from Ninghua Chengguan to Hucun to Luojiaping, the section from Ninghua Chengguan to Hucun belongs to X796 line of county road, and the branch line from Hucun to Luojiaping belongs to rural road. Ninghua county is an old revolutionary base area. Hucun is the location of Tiane Cave Scenic Area in Ninghua and the former site of the Red Army Hospital. Hucun Luoguping is one of the assembly areas of the Red Army's Long March. Therefore, the construction of Ninghua Chengguan-Hucun-Luojiaping Highway is of great significance for improving the tourism traffic environment, promoting the development of tourism resources and promoting the county economic development in Ninghua.

2. It is agreed that this project is designed according to the secondary highway standard promulgated by the Ministry of Communications. Considering the small traffic volume of this section of highway, in order to make full use of the old road, it is agreed in principle that the design speed is 40 km/h, the subgrade width is 8.5 meters, and the all-cement concrete pavement is adopted. Bridge and culvert are the same width as subgrade; Other technical indicators shall be implemented according to the Technical Standards for Highway Engineering issued by the current Ministry.

3. Agree in principle with the main line scheme recommended in the report, that is, the starting point of Ninghua Chengguan-Hucun Highway is located near Ninghua Chengguan Repair Factory (intersecting with Provincial Highway 205), passing through Dongshan Bridge, Mayuanting, Chenkeng, Shangshang, Shiqianqiao and Wu Fang, and ending at the former site of Hucun Red Army Hospital, with a length of about 27.4 kilometers; The branch line from Hucun to Luoguping starts from Wu Fang and ends at Luoguping, with a total length of about 4.7 kilometers. Two segments * * * are about 32. 1 km.

Four. The total investment of this project is 93.63 million yuan. Among the sources of funds, except for the state subsidies included in the red tourist trunk road construction plan, the rest are solved by local self-financing.

Verb (abbreviation of verb) agrees that the construction period of this project should be controlled in 24 months.