(1) municipal traffic engineering. Road engineering construction is 42.937 kilometers (including main roads, secondary roads and branch roads), with a road area of1.21.9 million square meters, supporting the construction of traffic engineering, road lighting and slow traffic.
(2) municipal infrastructure supporting projects. Boiler room1; The total length of communication pipeline is about 43775 m: there are 1 sanitation garbage transfer station, 1 sanitation station and 6 public toilets; 4800 m flood dike of main canal of Qinghe water diversion project; Class I fire station 1 seat (covering an area of about 41100m2).
(3) Greening landscape engineering. Construction of three theme parks, namely Aviation Theme Park, Chuangzhi Park and Sports Park, as well as community parks and street green spaces, with a total area of 1007300m2.
(4) Public service facilities. We will build a 1 comprehensive transportation hub with a building area of 46000m2, an international hospital (300 beds) with a building area of 37000m2, and a pioneering building with a building area of 43860m2.
(5) Demolition and resettlement housing project. Villagers involved in demolition 1 138, and the supporting construction of resettlement houses is 259560m2.
(6) Smart City Project. Including network infrastructure, cloud computing center construction, intelligent transportation system, intelligent energy system, intelligent government system, intelligent environmental protection system, intelligent city management system, intelligent security system and intelligent medical system.
Legal basis: Regulations on Railway Safety Management
Article 8 The survey, design, construction and supervision of railway construction projects and the procurement of building materials and equipment shall be subject to tender according to law.
Article 9 Units engaged in survey, design, construction and supervision of railway construction projects shall obtain corresponding qualifications according to law and engage in railway construction activities within the scope permitted by their qualification grades.
Article 10 Railway construction units shall select survey, design, construction and supervision units with corresponding qualification levels to carry out engineering construction, supervise and inspect the quality and safety of construction projects, and make inspection records for future reference.
Article 11 The survey, design, construction and supervision of railway construction projects shall abide by the provisions of laws and administrative regulations on the quality and safety management of construction projects, and implement national standards, industry standards and technical specifications.
The survey, design and construction units of railway construction projects are responsible for the survey, design and construction quality according to law, and the supervision units are responsible for the construction quality according to law.
High-speed railways and railway construction projects with complex geological structures shall implement engineering geological investigation and supervision systems.
Article 12 The safety facilities of a railway construction project shall be designed, constructed and put into use simultaneously with the main project. Investment in safety facilities should be included in the budget estimate of construction projects.