Current location - Plastic Surgery and Aesthetics Network - Jewelry brand - Is there a new plan for Beilun Chai Bridge?
Is there a new plan for Beilun Chai Bridge?
Legal analysis: 1, the dock coastline is close to the development limit, and the land port boundary is optimized and adjusted.

2, revitalize land resources, the implementation of waste materials trading market resettlement and upgrading needs.

3. The adjusted area is about 65.5758 hectares.

Legal basis: publicity before approval of regulatory detailed planning in Dawan area of Chaiqiao, Beilun, Ningbo.

1. Planning Scope This planning scope is located in Greater Bay Area, Chaiqiao Street, Beilun. The planning scope extends to the connecting line of Daxie Second Bridge in the west, Daxie Second Bridge in the north, Daxie First Bridge in the south and Huangzhijiang River in the east, and the adjusted area is about 65.5758 hectares.

2. Revitalize land resources to meet the needs of resettlement, transformation and upgrading of waste materials trading market. This adjustment area (the land between Huang Zhi, Beilun, Jiangxi and Daxie No.1 Bridge and No.2 Bridge) was originally the land of Dawan Village, Chaiqiao Street, Beilun District. In order to develop this land and cooperate with the construction of Beilun Chaiqiao Lingang New Material Industrial Park, Beilun District has invested a lot of manpower and financial resources in land acquisition and demolition of Dawan Village. Due to the limitation of coastline resources and the limited demand in the hinterland of the original port, the land in the port area within the adjustment range is obviously idle and the land resources are underutilized. At the same time, the demand for industrial land and related supporting industries near Beilun Port is strong, and the mismatch of land resources is serious, which leads to a serious imbalance between input and output in this region.