Current location - Plastic Surgery and Aesthetics Network - Jewelry brand - Annual work summary of engineers, professionals and technicians
Annual work summary of engineers, professionals and technicians
Annual work summary of engineers' professional and technical individuals (select 6 articles)

Time always slips away inadvertently, and our work has come to an end. During this time, I believe that everyone is facing many challenges and has gained a lot of growth. It's time to do a good job summary. What are the characteristics of a good job summary? The following is my personal annual work summary of professional skills of engineers (selected 6 articles), which is welcome for your reference and I hope it will help you.

Annual work summary of engineers' professional and technical individuals 1 20xx years have passed. In the past year, I worked as a software engineer in the development department of my unit, mainly engaged in the development of JAVA projects. In the past year, I worked hard, kept a low profile, did not seek glory, did not seek light, but only sought calmness. The achievements of this year are as follows:

I. For the project of Finance Bureau, I am independently responsible for developing three subsystems of Accounting Department:

1, accounting personnel credit inquiry system.

2. The credit information system of the agency bookkeeping institution.

3. Online filing system for accountants.

After the above three subsystems are online, it is convenient for all sectors of society to inquire about the real information of accountants, the information of legal agency bookkeeping institutions and report accountants to all units.

Second, the catering industry project, in the team development project, directly participated in the information integrated management platform project of the headquarters of Haoxianglai Catering Co., Ltd., mainly responsible for the following systems:

1, house lease contract management system.

2. SMS sending and receiving management system.

3. membership management system.

4. Basic information management system and some functional modules of personnel management system.

After the application of the system, Haoxianglai has improved the management efficiency to a certain extent in the management of house lease contracts in various stores across the country, and provided corresponding early warning information in time and effectively; Short message receiving and sending system is convenient for headquarters to transmit all kinds of information in time; The membership system better manages the membership information of all stores in the country; Personnel system reduces management workload, etc.

Three. Xx industry project

I participated in the development of some modules of the enterprise transfer management system of China Bank Xiamen Branch. The system is convenient for enterprises to quickly realize a large number of complex transfer work.

Four, land resources and real estate management bureau project

What is being responsible for and developed is the online declaration and audit system of housing monetization subsidies. This project adopts new technology, which makes the interface more elegant and beautiful, and greatly improves the effect of man-machine interaction platform.

Lack of summary: when I came to the headquarters in Xiang Hao to do the project, due to some internal reasons of the team and other external factors, the work efficiency, development progress and final software quality were affected to some extent; This is something that every member of the project team, including me, must review.

Summing up the work in the past year, although some progress and achievements have been made, there are still some shortcomings, and individual work is not perfect enough. In my future work, I will try my best to find out the shortcomings in my work so as to overcome them in my future work. Self-study and absorb new technologies, carefully study specifications and related documents, and apply new technologies to practical projects in time to further improve the technical content of the projects.

I come from Nanjing, the ancient capital, and have been working in Wuxi since I graduated from university. I have a profound background in electronics, mainly studying circuit micro-design. Now I am not only engaged in circuit micro-design, but also have a macro grasp of the whole system: I have a clear understanding of CPU structure, peripheral interface circuit, power module, power consumption analysis, matching resistance, selection of pull-up and pull-down voltage, system coding and decoding flow, etc.

I just started my internship in the company, mainly engaged in audio and video coding and decoding: I am familiar with the current multimedia industry standards, including video H.264, MPEG4-4, audio AAC, and the basic algorithm of image processing, and I also have some understanding of the open source project of streaming media server. Since mid-June, 5438+00, I have been engaged in hardware circuit design and PCB production (using Allegro software). ), the use of CAD and CAM software, and the management of ingredients, material selection and equipment.

Now I am mainly engaged in circuit design. It has been improved in circuit processing and circuit module selection, and gradually matured in circuit application software. Looking forward to progress in platform construction and underlying development.

Gradually familiar with the process of equipment procurement, equipment selection and matching. In the process of product design, I can make effective suggestions to reduce costs and improve product performance. I hope there will be further breakthroughs and greater progress in circuit design in the future.

In this year, I mainly participated in the hardware module transformation and pcb production of network camera, 4-channel video server and image acquisition board, all the devices were purchased, and some circuits were debugged and tested, but nothing else was involved.

I learned a lot from the company's corporate culture. To enter the company, first of all, we should see whether the personal development path can fit in with the company's corporate culture: I am very happy and relaxed whether it is the company's public meeting exchange or the company's salon lecture. Through more than a year's work, I realize more and more clearly that there are still many things I want to learn: the hardware circuit design is still very weak, and I still think with the thinking of my student days, whether it is management or technology.

Advantages: serious and responsible, good at thinking, always looking at and solving problems from the perspective of product designers. No matter what it is, I should do the work at hand first, and then do other things. Although some problems sometimes occur in the R&D process, we will find the summary and back up the document in time to avoid similar mistakes in the future. For example, when designing the motherboard, we used TC32 16 package. Actually, the packaging of TC32 16 is the same as that of C 1206. It was no problem to make TC32 16 package at that time, but we didn't pay attention to it. Although it was a small problem, it was not found in time, which led to the redo of the board.

Summary of the annual work of engineers' professional and technical individuals 3 I. Main work and completion of this year

According to the company's work arrangement, this year I mainly completed the supervision of the delivery of Longkaikou Power Station, the expansion of xx security converter station, the expansion of xx substation and the deicing of ground wire of xx converter station. Under the correct leadership of leaders at all levels of the company and with the active cooperation of all departments, I led my team to complete this year's supervision task safely, with high quality and high efficiency, and the achievements were unanimously affirmed by the construction unit and the company leaders.

Second, the highlights and shortcomings in the work

The experience summarized in the work mainly includes the following leaders' reports: First, based on design documents, national electric power construction regulations, construction contracts and supervision contracts, do a good job of two management, four control and one coordination. The second is to learn from experienced colleagues, study hard, think hard and work hard. Third, unite your own team and build a harmonious team. Fourth, boldly explore new technologies and new processes and optimize the construction scheme. Fifth, strengthen the rules and regulations of China Southern Power Grid and the company, actively promote and apply the requirements of integrated management of infrastructure projects, and carry out quality control according to the established WHS points. Seventh, standardize the supervision diary of our team and strengthen the management of engineering image data.

Among them, I think it is most important to unite our own team and build a harmonious team. As the saying goes, everyone paddles to open a big boat, and one fence has three piles, showing the strength of the team. The experience and practice in the past few years have proved that only by relying on the collective wisdom can we overcome all difficulties and show the company's image to the outside world until we finally win. The role of internet information technology in engineering. Sixth, positive consistency.

Third, the problems encountered in the work and the handling situation

At work, I often encounter some problems and troubles, but I never avoid them. First of all, I want to think calmly and understand the ideas and methods to solve the problem. I should give full play to the wisdom of the masses for difficult problems. Brainstorm and learn from others. For some problems that really can't be solved within their own ability and authority, report to the relevant leaders for instructions in time to avoid the expansion of difficulties and contradictions and strive for time to solve the problems. So over the past year, the team I led has been able to successfully complete the tasks assigned by the company. Thank you again for your concern and support. Without your care and support, it is hard to imagine.

Four. Opinions and suggestions on the company

I hope our company is as full of vigor and vitality as the rising sun in the morning. Of course, I also hope that our life is full of sunshine. In view of this, I suggest that the company:

First, actively expand business, increase revenue and reduce expenditure, improve work efficiency and optimize human resource structure.

Two, increase the cost of staff education, cultivate a group of high-quality supervision talents, and adopt some incentive policies to encourage the advanced and spur the backward. Create a positive learning atmosphere.

Third, wage reform should be carried out to improve the treatment of outstanding employees with good performance, good dedication and dedication.

Personal Work Summary of Construction and Installation Engineer Annual Work Summary of Supervision Engineer Responsibility Letter of Chief Supervision Engineer of Supervision Unit

Personal Annual Work Summary of Engineer's Professional Technology 4 Whether as an ordinary engineering technician or as the technical director of an engineering project, I feel that to do a good job in a project, we should not only strictly abide by the national construction norms and regulations, but also integrate theory with practice, study and apply flexibly, constantly sum up construction and management experience, and constantly improve and innovate in technology. I came into contact with many chimneys in my work and realized that only by constantly innovating technology and constantly updating equipment can we create greater economic and social benefits.

For example, in the slipform of prilling tower and chimney, we use a small tonnage jack (rated lifting capacity is 3.5t) to lift the slipform platform. Later, after argumentation and technical and economic analysis and comparison, we decided to adopt the large-tonnage jack of xxx chimney (rated lifting capacity of 6.0t), which has the following advantages compared with the small-tonnage jack: it can save half of the support rods; The gap length of the support rod is longer, and the safety of the sliding mode is more guaranteed; And the reinforcement workload of the support rod is reduced. In xxx and xxx years, the xxx chimney of xxx project and the chimney of xxx heating project were all constructed with large tonnage jacks, and its technical and economic benefits were very obvious.

In addition, we also reformed the sliding mode measurement technology. In the past, it was very troublesome to measure the deviation with a laser centering instrument in the center of the granulation tower or chimney xxx, and to measure the platform torsion with a theodolite outside. Later, we also arranged xxx laser centering instrument on the symmetrical radius of the chimney relative to the center. According to the measured data, we can directly calculate the offset and torsion of the platform. The accuracy is improved and the workload is reduced.

Although we have made some achievements in sliding mode technology, there is still a long way to go from the advanced level of sliding mode in the world, which requires us to constantly improve our technology and sum up our experience. As far as chimneys and prilling towers built by our company are concerned, there are mainly the following problems:

1. At present, we have not involved the sliding mode of hyperbolic towers and frames, only the sliding mode of circular structures.

2. Vertical transportation is backward. The traditional method is to use the floor derrick plus luffing rod or luffing rod to cooperate with the lifting derrick. This method is backward. We can improve this by setting a jack-up tower outside the cylinder, which can not only meet the vertical transportation of steel bars and concrete, but also save the cost of several winches. Judging from the long-term benefits, the latter is definitely more obvious than the former.

3. The steel platform made by the traditional method can only be used once, which not only wastes steel, but also increases the workload of disassembling the platform. On the premise of ensuring the safe use of the platform, we change the welding connection form of the platform components into bolt connection, which can be reused many times;

4. Regarding slip-form rectification and torsion rectification, it is assumed that xxx automatic control device is located outside the lifting frame.

For a person who has been engaged in technical management for a long time, his technical level and construction ability are beyond doubt, but he feels lacking in management. Of course, this is not only related to whether he is willing to study, but also related to the fine division of labor among the majors in our enterprise. Therefore, if enterprises want to cultivate more compound talents, they must strengthen the management concept of technicians and their ability to adapt to the market economy. This is what I personally understand best.

In a word, as an engineering technician, in addition to strictly following the construction drawings, national codes, regulations and construction plans, we should constantly sum up experience, draw lessons, boldly carry out technical reform and innovation, constantly optimize the design and construction plan of construction xxx, and strive to raise our professional level and business ability to a new level.

The annual work summary of engineers' professional and technical individuals passed quickly, and xxx year is drawing to a close in an instant. Recalling that busy and substantial xxx, I can't help feeling a lot. In the past year, through my continuous efforts, I have made some progress in my technical level and communication skills, but there is definitely room for improvement. This is a precious experience in my life, which left me with good memories.

I am lucky to be a member of zxx. Looking back on my struggle, I have gained a lot. I remember when I first came here, I didn't understand the company's management system, business process and work direction. Through studying in Jiangmen, I integrated into this new big family. This is due to the company's reasonable system and well-trained newcomers. Later work made me realize that zxx is a united family, a harmonious family and a family with a sense of belonging. The heart is here and the home is here. Everyone here has an ideal, a goal, a direction of life, and devoted himself to the dream of sweat irrigation. At work, we are good colleagues, and we discuss technical issues and business processes together; In life, we are good friends. We talk about life ideals, life chop suey and various social occasions together.

Since I entered the company, I have designed and developed WEBGIS project, which has overcome various technical problems existing in WEBGIS project, such as beautiful interface design, database communication, SOCKET communication and so on. Going to Mianyang on business to deploy my own software is my most fulfilling thing. When deploying WEBGIS project, I found that the site environment is complex and changeable. First, WCF can't connect to the database, and mapping xxx map can't be called. At that time, I often stayed up late to solve these problems, and God rewarded me. With my efforts, WEBGIS can finally run smoothly. I also gained a lot from my business trip, which not only improved my communication ability with customers, but also improved my technical ability. After completing the WEBGIS project, I quickly plunged into the Yichang SMS return visit project. Maintain SMS gateway, develop SMS sending interface and xxx interface. This project makes me feel that it is not easy to write a software that can run well, and the customer needs are changeable. I hope that one day the software can be truly intelligent.

In the past work, under the careful care and guidance of leaders and colleagues, through our unremitting efforts, we have made some progress in all aspects, but these are far from enough. As the saying goes, "He who has no long-term worries will have near worries." I understand that there is still a lot to learn and a lot of room for improvement. In the future, we will continue to push ourselves, strive to improve our own quality, overcome our own shortcomings, and work in the following directions:

1, learning is endless, the times are developing with each passing day, and the knowledge of various disciplines is changing with each passing day. I will continue to strengthen my study, learn from theory, learn from professional knowledge, learn from my colleagues around me, and gradually improve my theoretical level and professional ability, and use them to guide practice.

2. "Specializing in diligence and being idle in waste". In the future work, I will continue to learn business knowledge, constantly improve my service skills through reading more books, studying more and practicing more, overcome my impatience when I was young, be down-to-earth, improve my work initiative, and be not afraid of many things and small things. I will improve myself in practice bit by bit.

3. Constantly exercise your courage and perseverance, improve your ability to solve practical problems, and slowly overcome impatience in the process of work. Treat every job positively, enthusiastically and meticulously, constantly improve their cultural literacy, and strive to become an excellent staff member.

4. Actively cooperate with Liu Weibing at work, and quickly and effectively complete the tasks assigned by superiors.

5. Do a good job in xxxPGIS project.

As a software engineer, learning is very important! Keep studying! Mastering a subject is far from as difficult and profound as imagined, but it takes more time. Learn in many ways, dabble extensively, and strive to consolidate your ability. Want to be an excellent software engineer, not only the knowledge of software, but also the knowledge of finance, economy, taxation and management. Keep a low profile and save for a rainy day. This year is a bumper harvest, and strive for a bumper harvest next year.

Summary of the annual work of engineers' professional and technical individuals 6 is another year to bid farewell to the old and welcome the new. Unconsciously, I have been in Baosheng Company for more than half a year. Through more than half a year's work and study, with the strong training and support of the company's leaders, my professional knowledge and personal quality have made great progress, and I have also made certain achievements in my work. Looking back and summarizing my work in 20xx, I make the following summary:

First, be familiar with the company's rules and regulations.

I joined the company on March 18, 20xx. In order to integrate into the company team faster and better and lay a good foundation for future work, I stepped up my understanding of the company's rules and regulations and employee manuals and became familiar with the company's corporate culture. In my future work, I will continue to be strict with myself according to the company's rules and regulations.

Second, the work situation

Actively cooperate with the real estate market research planned by the operation department, step on typical real estate, better and more comprehensively understand the key points of real estate-related links, so as to make reasonable adjustments in the project and improve people's overall satisfaction and purchase desire for real estate. Actively participate in the training activities organized by the company, enrich knowledge and improve the overall business level.

In May, I went to Heyuan Project to study and assist in the fourth phase of landscape engineering. The fourth phase of the garden project includes a first-floor sidewalk and a third-floor garden, with a total construction area of about 1.35 million ㎡, including fish ponds, swimming pools, water treatment circulating equipment, landscaping, stadiums and other major parts. Landscape greening project is indispensable for garden-style new living quarters, which is of great significance. It is an essential factor for residents to improve their quality of life. The landscape of the location must be completed before the official opening of the sales center, auto show center, jewelry center and model house to avoid leaving a bad impression on the owners. Therefore, the workload and pressure in the early stage of construction, especially the three-story garden project, are large, and it is difficult to carry out effective construction on a large scale. However, with the guidance of leaders and the assistance of colleagues, it was completed on time and with good quality.

This year's study has enriched my professional and life knowledge. Real estate companies pay more attention to management. It is very important to coordinate the relationship between the construction parties and handle the contradictions between them. For example, in the process of building a hanging garden, the installation of glass curtain walls and railings, the transfer or stacking of steel bars, fittings and tools in the main structure require a large area, as well as a large amount of materials from the garden builders themselves. All these need to be balanced, forward-looking, consider all aspects vertically and horizontally, and choose the best scheme, so we can't lose sight of one thing and lose sight of another, otherwise it will affect the construction of other working faces and always delay the construction period.

In terms of quality control, the principles of material control in advance, construction technology control and post-acceptance control are required, so as to ensure the quality of raw materials, check the quality, quantity and specifications of materials entering the site, and check whether the materials present meet the design requirements and contract requirements. The control of construction technology mainly lies in daily quality inspection and quality tracking, as the leader said: Although you have explained the following manual, you should always track it, so as to do your work well.

Third, the existing shortcomings and improvement measures

Looking back on my work in the company for nearly a year, many things are still unsatisfactory. To sum up, the shortcomings mainly include the following points:

1. Discontinuity between plan and record

At work, sometimes the plan is undecided, the purpose of the work is unclear, and the construction sequence collides with the car, which often leads to inefficiency. In the future work, I will insist on making a good work plan for the next day one day in advance, so as to achieve twice the result with half the effort. At the same time, it is necessary to continuously record when

Day construction, avoid blank construction records, so that you can refer to the work of the day.

2. Lack of foresight

We failed to have a good foresight for the problems that are easy to occur in the construction process. Later, we will continue to learn to improve foresight and pre-control the parts that are prone to problems, so as to minimize or avoid problems when encountering problems and deal with them in an orderly manner.

3. Narrow knowledge

As a civil engineer of Party A, my professional knowledge is narrow and I don't know enough about other real estate knowledge. In the future work process, I will strengthen the study of other majors, understand the news of other real estate departments, improve my subjective initiative, and strive to become a qualified civil engineer.

Four. Work plan for next year

At work, I am more familiar with the company's rules and regulations, understand the company's process operation, and obey the leadership's work arrangement;

In terms of self-appreciation, it is planned to pass the professional title English A certificate in March, pass the second-level constructor's legal and regulatory examination in June, and obtain the second-level constructor's certificate, and pass the junior economist's examination 165438+ in June. In the new year and new challenges, I will work harder, study harder, and constantly improve my professional knowledge. Under the leadership of the manager, I will work together with my colleagues to create greater benefits for the company.

My report is over, thank you.

;