Model essay on work summary of professional room 1
1983 joined the work, 1996 started to engage in the hydropower construction industry, working for
Model essay on work summary of professional room 1
1983 joined the work, 1996 started to engage in the hydropower construction industry, working for xx years. Over the past xx years, I have closely focused on the company's work ideas and work centers. My comrades and I have further carried forward the fine tradition of being rigorous, pragmatic, United and dedicated, and successfully completed the annual work plan and various tasks. My professional knowledge has been strengthened and my practical experience has been accumulated. In order to improve my professional and technical level, I also participated in >: University study, I study hard, stay behind anyone, eat and live on the construction site, and learn professional and technical knowledge as soon as I have time. Being pragmatic and earnest is my working principle, and being hard-working is my working spirit. I feel that only serious and down-to-earth work will bring me the rewards I deserve. I did my duty and was praised by company leaders and colleagues. Combining theory with practice in my work, I have learned a lot of knowledge and experience in my work and life.
I participated in the planning, design, construction organization, safety management and project manager's main projects: Xinli Trade City, with a 7-storey building, a construction area of 50,000 square meters, a project cost of 25 million yuan, a frame structure and qualified project quality; Jewellery Shi Shui Power Plant, with an installed capacity of 5000kw and a project cost of 28 million yuan, has excellent project quality; Tanghe Hydropower Plant, with an installed capacity of 6000kw and a project cost of 32 million yuan, has excellent project quality; Shangwen reservoir reinforcement project, the project cost is 32.5 million yuan, and the project quality is excellent; The overall project of Pinghua Hydropower Station has an installed capacity of 400kw, a project cost of 2.3 million yuan and excellent project quality. Wait a minute.
In many years' work, I realized the hardships and difficulties of being a professional technician. The planning, design, construction organization, safety management, project manager and other projects I participated in were completed as planned, and all passed the one-time acceptance, and no major quality and safety accidents occurred. The new era requires us to work harder, do everything well and keep up with the development of the construction industry. As a person who keeps up with the times and the development of the construction industry, I will learn with an open mind, unite with my colleagues, study hard for professional knowledge, dare to adopt new technologies, constantly improve my professional and technical level, and strive for early success. In the future, I will continue to carry forward my excellent work attitude and create higher work performance.
Professional room work summary model essay 2
First, rich professional knowledge is the premise of engaging in professional and technical work.
Since joining the work, I have been guided and cared by the bureau leaders, and have been engaged in professional work related to highway survey, highway design and budget. After several years of work practice and study, I have accumulated some professional theoretical knowledge. Engaged in highway survey, highway design and budget work successively. As an engineer, we should make a good plan in our work and arrange each working procedure and production factors reasonably. Do a good job in manpower, materials, equipment, technical preparation, peripheral relations and so on required for subsequent projects in advance. Ensure that when the follow-up work is implemented, there is no hurry, no shortage of east and west, and the construction period will not be affected.
At work, personal work attitude is also very important, and the tasks assigned by the leaders must be completed as required, and cannot be delayed or perfunctory. Special circumstances can not be completed on time, should be reported in a timely manner. Convenient to solve the problem as soon as possible.
The work of technicians is also hard. During the day, they have to climb up and down the construction site to guide the construction, and at night, they have to sort out the inner pages of the day and arrange the work for the next day. This requires a hard-working spirit, and the work of the day is completed on the same day, and it will never be put off until the next day.
Technicians work in the construction line and are responsible for the quality, safety and progress in the construction process. Timely report the problems that need to be solved and improved in the construction, and put forward solutions to the leaders. In the work, we should deal with the relationship with the construction personnel and the supervision owner, and everything is based on ensuring the progress, quality and safety.
All kinds of internal page data and quantity confirmation data formed in the construction process shall be signed by the supervision engineer in time, so as not to affect the later measurement.
Two, strict standards, strict requirements, and strive to make professional and technical work to a new level.
I have always been strict with myself, combined with theoretical knowledge applied to highway construction, and achieved certain practice. The construction shall be carried out in strict accordance with the technical standards of highway engineering and the inspection and evaluation standards of engineering quality. As a qualified technical director, I have strict requirements on engineering quality, be a good assistant to the leader, dare to innovate and explore in technology, and sum up practical experience. During my years in office, I have performed my duties as a technician well.
In recent years, we have done a lot of work for the society and the highway industry. In order to adapt the professional technical level and professional technical working ability to the development of highway, we need to continue to learn professional technical knowledge, sum up experience, enrich our professional theoretical level and practical construction ability, push professional technical posts to a new level, and do our part for the development of highway construction.
Professional room work summary model essay 3
A school year has passed since I first stepped onto the platform and became a teacher. Looking back on this school year's teaching work, I have grown a lot and benefited a lot. As a young new teacher who has just set foot on the job, I couldn't help feeling a little uneasy at first. Fortunately, school leaders and many teachers have given me a lot of care and help, and I have worked harder. This school year, all my work has been carried out in an orderly way, and all the teaching tasks and teaching objectives of the school have been successfully completed. At the same time, after a year of practice, I have gained a lot of valuable work experience. The following is a summary of my work this academic year.
I. Teaching work
1, education and teaching must be guided by new ideas. Fully prepare lessons, thoroughly understand the curriculum standards and teaching materials, strive to highlight key points, break through difficulties and eliminate doubts in each class, and prepare one lesson according to the school-based training plan for new teachers. Seriously participate in collective lesson preparation, strive for perfection, participate in lectures and evaluation activities, learn from the old-timers and teachers with an open mind, learn from each other's strengths and constantly improve the teaching level.
2. Seriously study the theory of the new curriculum standard, learn every teaching mode, and constantly imitate and innovate, thus forming your own lecture style. Considering that the seventh grade is new to geography class, I don't know much about geography knowledge, so I adopt autonomous learning mode, and some contents can be flexibly changed by exploring innovative teaching mode, and expanded on the basis of textbook knowledge content. Write a summary every week and make a plan for next week.
3. Do a good job in regular geography classroom teaching. Prepare lessons carefully and try to teach every lesson well; According to the arrangement of the content, the lecture time should not exceed half an hour, and ten minutes of classroom practice is guaranteed in each class. In terms of homework arrangement, students spend more than 20 minutes on weekends, and their homework focuses on basic knowledge points. Arrange some innovative topics or interesting geographical topics appropriately to expand students' thinking. Finally, correct students' homework in time, find out the existing problems, make comments and consolidate students' basic knowledge.
4. As for students' extracurricular reading, it is recommended that students read geographical classics, mainly chinese national geography series, The Home of Humanity written by Long Fang, and The Mystery of Geography, which are all about geography, telling the general situation of world geography, China geography, ethnic customs and so on. The mystery of geography lies in broadening students' horizons, cultivating students' ability of exploration and thinking, and increasing students' interest in geographical scientific phenomena.
5. Draw up a review plan, make a review outline, carefully organize the review, and do a good job in supporting exercises. Adhere to the requirements of weekly and monthly exams to improve students' ability to do problems. The weekly exam is once every two weeks, and the topic arrangement is the content of learning. The difficulty ratio is 3: 5: 2, so that all knowledge points can be tested and appropriate creative thinking topics can be found. Usually, you can also trigger some topic materials and send them to students for practice in your spare time. After each unit exam, make a comprehensive quality analysis for each student and each class. Pay attention to the problems existing in teaching and students' learning and solve them in time.
6. To guide the top students in geography and science, lay a solid foundation, give full guidance to some difficult problems or knowledge points, and strengthen extracurricular reading, often organize them to talk, and keep abreast of their learning progress and status; For students with learning difficulties, it is estimated that this branch will be held after the seventh grade exam, to observe the situation of students with learning difficulties, to give individual counseling, to trigger some knowledge points or topics that they find difficult, to carry out special training and to decompose them one by one. In order to catch up with the progress of other students. We can't ignore any student.
Professional room work summary model essay 4
Since I joined the work, I have actively participated in the construction management, loving my post and being dedicated. I was named a technician in September of 20xx. After several years of construction production management, I have studied hard and explored constantly, and accumulated rich experience in construction engineering technology and economy and construction enterprise management, and achieved certain results. Looking back on our work in recent years, we can briefly summarize it as follows:
First, join the construction industry and build quality projects.
Since joining the work in September, 20xx has been engaged in construction management, learning with an open mind, and the professional and technical level has been continuously improved. In recent years, I have participated in and presided over three projects, all of which are qualified.
In the construction of 43#44# residential building of Yanshan University in 20xx, I was responsible for the construction technology management. Before the construction of partial projects, I made detailed technical disclosure, so that operators could understand the characteristics of construction tasks, construction technology, labor organization, technical organization, safety measures, consumption control, specification requirements, quality standards and other contents, as well as the special requirements of special complex projects or new structures, new materials and new technologies. Strictly control the quality of raw materials, components and equipment entering the site. All raw materials, components and equipment entering the site must produce the certification documents provided by the supply department, and the raw materials, components and equipment required to be rechecked in the specification can only be used after passing the inspection. Check the operation quality and intermediate product quality item by item according to the quality standards, and on the basis of quality inspection, check and record the concealed works, sub-projects and completed projects to ensure the engineering quality. Do a good job in the management of engineering and technical files. Engineering technical archives are the original technical and economic data that the protagonist can obtain, the achievement of technical and engineering quality management, and the necessary basis for the use, management and maintenance of the construction unit. Therefore, the engineering technical files should be filled in truthfully and carefully with the construction process to avoid making up afterwards.
According to the characteristics of the project and the local conditions at that time, formulate the construction plan, determine the reasonable construction sequence, project organization method and important partial construction methods, formulate and implement the technical measures plan, overcome the weak links in construction, installation and production in a planned and step-by-step manner, tap the internal potential, ensure the completion of the construction task, ensure safety, save raw materials, reduce costs, improve quality, shorten the construction period and develop productivity.
My colleagues and I get up early and get greedy for the dark, often working overtime, trying to grab the construction period. During the construction, I personally check every working procedure, correct the problems in time when found, nip the quality hidden dangers in the bud, make the project change reasonable, and closely cooperate with the supervision of Party A.. The project was finally rated as a municipal project, which created good economic benefits and social reputation for our company.
Second, improve their own quality and tackle key problems through science and technology.
When I first entered the construction industry, I had little knowledge. On the one hand, I tried to work in the front line of construction and production to improve my practical business skills. In addition, I also participated in the study of industrial and civil architecture major in Jiaozuo Institute of Technology, and actively participated in various technical trainings to improve my theoretical level. Let your business mature. In a large number of construction and production practice activities, I also actively participated in the scientific and technological research activities of total quality management. Among them, two quality management research teams, namely, the research on solar hot water pipe laying technology in 20xx and the safety production in construction, both won the Hebei Science and Technology Quality Achievement Award.
Looking back on my work over the past few years, I have studied hard and studied my business, and I have made some achievements, but there are still many shortcomings. In my future work, I will redouble my efforts to improve my comprehensive quality and professional and technical level to meet the challenges of knowledge economy and market competition after enterprise restructuring.
Professional room work summary model essay 5
I applied to Tianjin Huacheng Real Estate Development Co., Ltd. in 20xx, and have been engaged in construction engineering technology since then. At work, I can integrate theory with practice, study professional knowledge assiduously, and constantly learn new professional knowledge and construction technology, which greatly improves my management level. In my work, I complete the project with a sincere heart and a responsible attitude towards the project quality, and there must be no project quality problems, so as not to harm the interests of the country and the people.
In August of 20xx, I participated in wuqing district Cuiheng Li Nan Residential Quarter Project, carefully studied the drawings, actively cooperated with all parties, constructed in strict accordance with the drawings, and actively communicated with Party A and the supervisor, so that the project passed the first acceptance, which was well received by Party A and the supervisor and recognized by the relocated households.
During the construction of Building 9-XX, a residential building in Longwan City, wuqing district, in 20xx, I studied the drawings with everyone, thoroughly studied every working procedure and every sub-item, asked the doyen for possible problems, and discussed with them, so as to be aware of them and plan ahead. In view of the large workload and short effective construction period of this project, I have studied and discussed the arrangement of construction personnel and the configuration of mechanical equipment with you. The three links of material approach are carefully planned and arranged, and the construction period is reversed to determine the engineering quality of each subdivisional work. I feel great pressure to finish the first project. Eat and live in the construction site every day, and organize the construction with advanced construction technology. On the premise of ensuring quality, through scientific management and the efforts of all staff, the project was successfully completed, achieving our work goal of ensuring quality and time limit, and completed ahead of schedule. The completion acceptance of the project conforms to the relevant national acceptance specifications and design requirements, and no safety and quality accidents have occurred.
In 20xx, during the construction of Yongjingyuan project in wuqing district, I served as the deputy project manager. I made full use of my previous work experience in construction, formulated strict safety responsibility system and management measures, attached importance to project quality and construction safety at the same time, strictly managed and meticulously constructed, and actively cooperated with Party A, supervision and other parties to communicate. * * * Together with them, I solved the problems in the construction and completed the project on time with good quality and quantity. The project passed the first acceptance and was commended by the company leaders.
Through hard work, I was promoted to project manager in the construction of Shi Sheng Xinyuan Project in 20xx, with a total construction area of 2 163 1 m2. Before construction, I will study the drawings with all technicians, refine the nodes, find out the construction difficulties and design defects, communicate with designers and Party A in time, organize carefully, actively participate in the construction, live and eat at the construction site all the time, find problems and make positive rectification.
Since I joined the work, I have made full use of the professional knowledge I have learned, the experience I have summed up from previous work, and insisted on integrating theory with practice. While testing my theoretical knowledge, I have accumulated more and more practical experience. I gradually grew from a grass-roots training to a manager who can independently undertake the project. At the same time, I am also clearly aware of my own shortcomings, and there is still much room for improvement in my study and work. I will continue to maintain a proud, modest and cautious attitude, study hard, keep forging ahead, manage the projects I undertake more strictly, abide by the requirements of construction specifications and design drawings, put work first, put the interests of the country and people first, seek truth from facts, strive for perfection, be conscientious and do my job well.
Professional room work summary model essay 6
Through the company's organization and control, the factory has carried out the teaching and training, and then organized the second teaching and training in the work area. In March of xxxx, I entered the relay cover class in the electrical maintenance work area and conducted teaching and training in the team. In recent years, under the sponsorship of master colleagues and leaders, I have done some professional skills.
During xxxx: I participated in the field practice with my master for the first time, and participated in the spring maintenance of 1 10kv Gaoya substation and1/0kV Xindian substation; Participate in the installation and commissioning of the newly-built 1 10kv anding substation. Advanced gis indoor primary equipment is adopted in Anding Substation 1 10kv, and the whole substation is unattended. Participated in the technical transformation project of 1 10kv new substation, and realized the computerized transformation of the shield; Participate in the transformation of 35kv Neiguan Substation, Ningyuan Substation and Yangpo Substation.
During this period, I continued to participate in the work of eliminating defects in other substations. In my work, I gradually became familiar with the mode of equipment and work regulations, and the relevant provisions in the Safety Work Regulations of Electric Power Industry. In this year's work, I have a systematic and preliminary understanding of substation and relay protection. I will use common objects and professional objects, and do a good job of maintenance and support, correctly select measuring instruments and meters, do a good job of maintenance and support, correctly implement power safety work regulations and relay protection related regulations, set various relays according to the fixed value nursing list, and correctly implement the steps of cross-line connection and continuous switching in relay protection and automatic device setting nursing list.
The period of xxxx was SARS: I participated in the addition of #2 main transformer, 41100 kV line shields, 100 kV line shields, bus differential devices, low-cycle load shedding devices, 35kv and 100 kV line shields together with the work area director, work area leaders and company leaders. In the project acceptance stage, I met with heavy rain and flood. Under the leadership of the company, my construction workers risked their lives to carry out emergency rescue work, so that the power equipment was intact, and I was also praised by the company. Participated in the installation and debugging of integrated automatic control equipment in newly-built 1 10kv Tao Yang substation.
Participated in the elimination of defects in various substations; In this year, the knowledge of relay protection has been further mastered, and simple relay protection setting value calculation and ratio calculation can be carried out, secondary circuit diagrams such as control signals, measurements, relay protection and automatic devices can be understood, circuit wiring can be skillfully checked according to the diagram to judge the correctness of its circuit connection, the correctness and completeness of relay protection device inspection declaration can be verified, anti-accident steps of relay protection and automatic devices can be correctly executed, and circuit defects can be punished.
During xxxx: I participated in the acceptance of 330kv substation, which is the first substation with 330kv voltage level in our company, giving me the opportunity to know and learn more electrical knowledge with high voltage level; Participate in the installation and debugging of gis indoor primary equipment and its secondary equipment in 1 10kv Gaoya substation; In this year, the skills of relay protection have been greatly controlled.
Xxxx years: participated in the battery replacement of old DC system in Gaoya Substation, Tongwei Substation and 1 10kv Substation; Participate in the installation and debugging of 1 10kv Weiyuan substation and Gaoya substation with low cycle load shedding; Participated in the addition of 1 10kv Tao Yang Substation 1 10kv line, installation, debugging and commissioning of bus coupler shielding device. In this work, under the guidance of my master, I learned to independently complete what the project leader should control.
Summary Mode of Professional Office Work Chapter VII
Before you know it, a semester will be over. Looking back on this semester's work, it is basically smooth. What I have gained will be used in my work next semester. I will seriously think about my problems and try to solve them. In this semester, I can keep my original good working attitude, constantly improve and make progress, and learn from experienced teachers with an open mind. In order to maintain a good working attitude and let me continue to work with a better outlook in the next school year, I will make a comprehensive summary of my work this semester. My work is summarized as follows:
First, the ideological aspect.
This semester, I corrected myself ideologically by using the educational activities of teachers' morality and style; Learn computer technology and teaching skills from action; Pay attention to the image in life and be a teacher. Over the past semester, I have actively participated in political studies, worked hard to improve my ideological awareness, obeyed the school's work arrangements, and cooperated with leaders and teachers in obscurity to do all the work inside and outside the school, which was affirmed by leaders and colleagues. These will definitely make me more confident and motivated to do everything well in my future work.
Second, the work.
The main work of this semester mainly includes three aspects: first, teaching information technology courses in Class 4, Grade 9; Second, receiving, sorting out and using the distance education resources of the school, repairing and maintaining the equipment; Third, print the relevant documents of the school, input and count all kinds of data.
In order to do a good job in the management of the computer room, better complete the teaching tasks and serve the teaching, this semester we will continue to look for and train students with good comprehensive quality as team leaders, and carry out specific division of labor to promote together, so that all classes and groups can cooperate with each other in class, abide by the rules and regulations of the computer room, operate correctly according to the requirements of teachers, and develop good study habits and hygiene habits.
In the aspect of distance education management, in addition to receiving, sorting and burning distance education resources in time, we should also cooperate with the Academic Affairs Office to provide supporting services for teachers to use resources, such as debugging multimedia classroom equipment, maintaining receiving equipment, browsing and sorting resources, etc. At the same time, make records carefully.
In terms of equipment maintenance, I overhauled and maintained the school's microcomputer this semester, trying to make it work normally and create a good learning environment for students.
Third, business.
As an information technology teacher, you should have a more advanced vision than others and keep abreast of the latest scientific and technological information. To this end, I usually consult experienced teachers with an open mind, often browse the new curriculum teaching and information technology textbooks online, and learn more, better and newer knowledge. At the same time, I actively participate in teaching and research activities, strive for more opportunities to listen to lectures, learn from others' strengths, understand the art of teaching, and strive to make myself an equal with a scientific research teacher.
Although the workload is relatively heavy, in order to improve the teaching level and professional level, on the basis of collecting a large number of excellent designs and excellent structures of others and consulting experienced teachers, I used my limited time to set up a school website and personal teaching blog, which is conducive to the exchange of learning between peers, to the exchange between students and me, and to the trend and study guidance of students. In addition to teaching, I also pay attention to accumulation and summary, and I was rated as an excellent teacher this semester.
Fourth, the attendance rate
While doing a good job in education and teaching, I strictly abide by the rules and regulations of the school. It's not too late to handle the relationship between school work and private life.
If you don't leave early, you will sometimes work overtime, which also exercises yourself. I am serious and responsible for the work of the school. No matter which job is assigned by the school, I will cooperate with my colleagues and try my best to do it well.
"The more I love my career, the more I feel that I am not responsible for my career." In the future teaching work, I will continue to develop on the basis of maintaining the original fine style. I will carry forward my advantages, correct my shortcomings, foster strengths and avoid weaknesses, and strive for greater achievements.