Current location - Plastic Surgery and Aesthetics Network - Plastic surgery and medical aesthetics - Measures for the management of cold recycling site construction?
Measures for the management of cold recycling site construction?
According to our company's construction experience, each project has formulated the construction management method, and the guiding ideology is to abide by the contract, ensure the construction period and quality, reasonably control the project cost, construct with high quality, high efficiency, civilization, safety and environmental protection, adhere to technological innovation, and popularize and apply new technological achievements. In the preparation process, based on specialization, mechanization and standardized construction, key processes and special parts are highlighted, combined with the construction period and engineering practice, overall planning is made, and the site layout is reasonable, the scheme is feasible and the construction organization is scientific, laying the foundation for the high-quality, efficient and safe completion of various projects.

1. Staffing According to the quantities and engineering characteristics of different projects, we are required to select capable project leaders, hire all kinds of business technicians who know technology, business and management, select capable construction teams, establish effective construction organizations, and complete the construction tasks of various projects with good quality and quantity. The training of the construction team is mainly aimed at the contract terms and professional knowledge of professional and technical personnel (technology, contract, budget, measurement, test, materials, equipment, finance, etc.). ); Understand, understand and master the regulations and norms of this major; Have a basic understanding of terms and norms related to this major, so as to improve the management level. For skilled workers, it is mainly to improve the level of construction operation. Operators should learn the technical principles, technical standards, "should know" and "should know" matters, technical operation and safety operation procedures of this type of work by studying the relevant provisions of technical specifications and operating procedures. Special attention should be paid to the pre-training of jobs with insufficient skills and jobs that are difficult to master.

Second, mechanical equipment based on the construction tasks and effective time limit for a project, and equipment varieties, specifications, models and quantities that are suitable for the characteristics of this project are equipped with comprehensive high standards. The required equipment sources are self-owned and leased, and the self-owned equipment is uniformly maintained; Determine the source, capacity and unit price of the leased equipment and sign the lease agreement. Train mechanical equipment operators in time to familiarize them with the structure, performance and maintenance procedures of this machine, and achieve "three understandings and four understandings", that is, to understand the principle, performance, use, operation, maintenance, inspection and troubleshooting. At the same time, establish the post responsibility system of mechanical equipment operators and technical disclosure of mechanical equipment safety. (

Third, the construction plan (a), the preparatory work before the construction preparation should be done in time, so that the regeneration construction will not be interrupted, and the potential weak areas of the pavement will be avoided. 1) and road condition survey (1) are used for additional deflection measurement of this section of test road. In order to know the strength of the original pavement in more detail, the measuring points should be densified and the deflection should be measured every 10m. (2) Excavate the original pavement to determine the structural form and material composition of the old road. 2) Before construction, remove all sundries, clods and dust on the original pavement to ensure the cleanliness of the pavement. 3) Pre-shape the old road to ensure that the thickness of the finished road surface is uniform (within the horizontal width and vertical range) after shaping by the grader.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd