Our hospital has made excellent achievements in the construction of hardware facilities and software facilities. After the relocation, our hospital now covers an area of 49,024 square meters, with a building area of 40,453.60 square meters and a business building area of 34,730 square meters. Prepare 450 beds.
The two clinics are located at the east and west ends of the central axis of the new county. The new inpatient building is a high-standard, high-starting, humanized and hotel-style modern building, which absorbs the advanced concept of contemporary ward building design, adopts double corridor structure inside, and the wards are arranged around the corridor to meet the lighting requirements to the maximum extent. The ward is equipped with central air conditioning, central suction, central oxygen supply and central call; Equipped with a separate bathroom, providing 24-hour hot water; There is a modern laminar flow operating room.