1.2022 decoration material purchase and sale contract template 1

Party A: Party B: According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, the two parties have reached the following agreement on the supply of decorative materials on the basis of equality, voluntariness, fairness and good faith:

Article 1 Quality standards: Party B guarantees that the products provided meet the national standards, industry standards and Party A's quality requirements for products, and Party B shall provide the product certificate and other supporting documents with the goods.

Article 2 Time and place of supply: Party B is responsible for transporting the goods to the agreed place, bearing the corresponding transportation and loading and unloading expenses, and bearing the risk responsibilities before the goods are delivered to Party A. ..

Article 3 Installation: The installation method is (Party B's installation/Party A's own installation); Where Party B is selected for installation, the installation standards are Tianjin Decoration Engineering Quality Acceptance Standard and Tianjin Advanced Building Decoration Engineering Quality Acceptance Standard, and the installation expenses shall be borne by Party B, and Party A shall provide necessary installation conditions for Party B. ..

Article 4 Method and time of payment: Both parties agree to pay the price through negotiation. After Party B delivers the goods to Party A and passes the inspection, Party A shall pay the payment by invoice, and Party A shall settle the payment within 90 days after receiving the payment.

Article 5 Liability for breach of contract:

(1) Party B's liability for breach of contract:

1. such as large core board, sound insulation cotton, putty powder, latex paint, etc. If it does not meet the national mandatory standards or the quality standards agreed in this contract, Party B shall unconditionally exchange goods, return goods or compensate Party A for the losses thus incurred; For other quality problems, the warranty period is one year, and Party B is responsible for free maintenance;

2. If Party B delays the delivery, it shall pay a penalty of _ _ _% of the delayed part price to Party A every day; If the delivery is overdue for more than 30 days, Party A has the right to terminate the contract in addition to paying liquidated damages, and the deposit, advance payment or price received by Party B shall be fully returned, but Party A has the right to require Party B to double the deposit without collecting liquidated damages.

(II) Party A's liability for breach of contract:

1. If Party A delays the delivery, it shall pay Party B a penalty of _ _ _% of the delayed price every day;

2. If Party A unilaterally terminates the contract without justifiable reasons, it shall compensate for the losses caused to Party B, and has no right to demand the return of the paid deposit.

Article 6 Dispute Resolution: In case of any dispute arising from this contract, both parties shall settle it through consultation, or apply to the market organizer or consumer association for mediation, or complain to the administrative organ; If negotiation, mediation or appeal cannot be settled, a lawsuit shall be brought to the people's court, or arbitration shall be applied in accordance with the arbitration clause or arbitration agreement reached separately.

Article 7 Other agreed matters: _ _ _ _ _ _ _ _ _ _ _. Article 9 If Party B's responsibilities are unreasonably relieved or exempted from the alteration or supplement of this contract, this contract shall still prevail.

Party A (seal):

Entrusted agent:

Tel: Signing time:

Party B (seal):

Entrusted agent:

Tel: Signing place:

2.2022 Template 2 of Purchase and Sale Contract for Decorative Materials

Supplier (Party A): Signing place of the contract: Demander (Party B): Signing time: year month day.

This contract is signed by _ _ _ _ _ _ _ _ Technology Co., Ltd. (hereinafter referred to as Party A) and _ _ _ _ _ _ _ Company (hereinafter referred to as Party B), and the following agreement is reached on Party B's purchase of _ _ _ _ _ _ _ _ from Party A:

I. Product procurement:

Party B agrees to buy products from Party A..

Second, the product quality:

The quality of the products provided by Party A to Party B must meet the quality specifications of Party A and be accepted by Party B. Party B shall issue a product acceptance certificate to Party A within 10 days after receiving the products. If Party B fails to issue a qualified certificate or unqualified statement within the time limit, the product shall be deemed as qualified.

Third, the quantity:

_ _ _ _ _ _ _ _ units.

Fourth, the product price:

The price for Party B to purchase _ _ _ _ _ _ _ _ _ _ from Party A is _ _ _ _ _ _ yuan per set. Party B shall not use _ _ _ _ _ _ _ for external retail. The above price includes after-sales service fee and freight.

Verb (abbreviation of verb) payment:

After receiving all the goods from Party A, Party B shall pay _ _ _ _ _ _% of the total payment to Party A by telegraphic transfer and issue an invoice, and pay% of the total payment after all the products are installed. Payee: _ _ _ _ Technology Co., Ltd.

Bank of deposit: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Account number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

6. Delivery time: before _ _ _ _ _ _.

Seven. Place of delivery:

Eight, packaging:

Party A must provide effective packaging suitable for product transportation and storage requirements.

Party A must mark all necessary marks on the outer packing.

Nine, after-sales service:

1. The after-sales service period of Party A is _ _ _ _ _ _ years.

2. When selling the scanner, Party A shall clearly explain to the user that it is the after-sales service provider and provide relevant information such as telephone number.

3. Party A provides _ _ _ _ _ _ _ _ _ _ _ _ services to users during the service period. (Warranty scope: non-human damage)

X. confidentiality:

Both parties shall keep confidential the contents of this contract and the information of the other party obtained from the performance of this contract, and shall not disclose this contract and the information of the disclosing party to a third party without the permission of the disclosing party.

XI。 Information exchange:

During the execution of this contract, both parties shall actively negotiate and communicate the contract matters in time to promote the smooth progress of the contract, and both parties shall designate the following persons as the contact persons of this contract:

Party A: Party B:

Tel: Tel:

Twelve. Handling of breach of contract:

1. Matters not covered in this contract shall be settled by both parties through friendly negotiation.

2. All disputes arising from the execution of this agreement or related to this contract shall be settled through friendly negotiation. If negotiation fails, it shall be submitted to Beijing Arbitration Commission for settlement. The arbitration result is final and binding on both parties.

Thirteen. This contract shall come into effect as of the date of signature and seal by both parties.

14. This contract is written in Chinese and governed by the laws of China. This contract is made in quadruplicate, with each party holding two copies.

Party A: Technology Co., Ltd. Party B:

Representative: representative:

Year, month, year, month, year

3.2022 Decoration material purchase and sale contract template 3

Demander: (hereinafter referred to as Party A) Supplier: (hereinafter referred to as Party B)

According to the Contract Law of People's Republic of China (PRC), Party A and Party B have reached the following agreement on Party A's purchase of Party B's materials through friendly negotiation on the principle of equality and mutual benefit:

I. Responsibilities of both parties

(I) Party A's responsibilities

1. Party A shall pay Party B at the specified time and manner.

2. Party A shall accept the materials as required and organize unloading.

(II) Party B's responsibilities

1. If the varieties and specifications of the supplied materials do not conform to the provisions of this contract, Party B shall be responsible for the return and replacement. If the delivery time is delayed due to the above reasons, Party B shall pay Party A a penalty of 5% of the total delivery value for each day of delay.

2. If Party B fails to deliver the goods according to the quantity stipulated in the contract, Party B shall pay Party A 5% of the total value of the undelivered part as liquidated damages.

3. If Party B fails to deliver the goods within the time stipulated in the contract, Party B shall pay 5% of the total value of delayed delivery to Party A as liquidated damages for each day of delay.

4. Party B must guarantee the quality of the materials provided to Party A. ..

Second, the mode of payment.

The total amount of materials is 36,065,438+000.00 yuan. Party A shall pay Party B an advance payment of 65,438+065,438+00000.00 Yuan, and the remaining materials shall be paid by Party B in one lump sum after Party B receives them and transports them to the designated place ... and raise an objection within 10 days at the latest after the arrival of the goods. Otherwise, it is deemed that the products provided meet the contract requirements.

Three. Matters not covered in this contract shall be settled by both parties through consultation. In case of any dispute or failure in negotiation, either party may bring a lawsuit to the people's court where Party A is located.

Four. This contract is made in duplicate, one for Party A and Party B respectively. Each copy has the same legal effect and shall come into effect as of the date of signature and seal by both parties.

Party A (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4.2022 Template 4 of Purchase and Sale Contract for Decoration Materials

Party A: Party B:

Through friendly negotiation between Party A and Party B, both parties sign this contract on the principle of equality, mutual benefit and unanimity through consultation to keep their promises.

I. Product name, model, quantity, unit price and amount

Quality standards: the products meet the relevant national standards and industry standards.

3. Product packaging standard: according to Party A's conventional packaging standard.

Four. Place and cost of delivery: Party A is responsible for delivering the goods to Party B's warehouse and bearing the transportation expenses.

Verb (abbreviation of verb) Mode of transportation: automobile transportation.

Settlement method of intransitive verbs: Party B shall pay 30% of the payment to Party A as deposit, and the balance shall be paid off upon delivery.

Seven. Delivery cycle: Party A shall deliver the goods to Party B's Dongguan factory within 10 days after receiving the deposit from Party B. ..

Eight. Ways to resolve contract disputes: both parties negotiate or submit to arbitration.

Nine. Other agreed matters: Party A sends the goods to Party B's warehouse according to Party B's requirements. In order to ensure that the products arrive at Party B on time with good quality and quantity, please carefully inspect the goods when Party B receives the goods or entrusts a third party to receive the goods (Party B must issue a power of attorney to Party A). If there is no doubt, please sign and affix the official seal on the delivery note, and then give it to the carrier and Party A. If there is any question, please indicate it on the delivery note and sign it by the deliveryman.

X. Other matters not covered shall be settled by both parties through consultation.

XI。 This contract is made in duplicate, each party holds one copy, and the faxed copy has the same legal effect, which shall come into effect after being signed by both parties.

Party A:

Party B:

Signature of representative:

Signature of representative:

5.2022 Template 5 of Purchase and Sale Contract for Decorative Materials

Party A (customer): Party B:

In order to better serve customers and promote Shangdi Decoration's leading concept of "love your family for life", Party A and Party B, through consultation, entrust Party B to purchase main materials and reach the following agreement:

I. Procurement of main materials and products:

When Party A purchases the main materials in the early stage, Party B will recommend and select the main materials that meet the design style and requirements according to Party A's room requirements, and calculate the exact required quantity.

Second, the procurement of major materials and product details:

After Party A selects the main material products, Party B shall fill in the quotation sheet (budget) of the main material according to the product details finally determined by Party A, and check with Party A the name, model, specification, color, price and other items of the related main material. After Party A checks, it shall sign for confirmation. The later product distribution is based on this "main material (budget) quotation sheet". See annex 1 for the quotation sheet (budget) of main materials.

Three. Payment, commission and payment method for purchasing main materials:

(1) Total quotation of main materials (in figures) ¥ (in words) See Annex 1 for the quotation of main materials.

(2) Payment method: this payment will be settled in two installments, and 80% of the total payment will be paid within three days from the date of signing the contract. After the product installation is completed, Party A will pay the remaining 20%.

Iv. Procurement of main materials and product supply:

After Party A pays the full amount of the contract, Party B guarantees that the main materials it provides meet the relevant national standards.

Verb (abbreviation of verb) Acceptance method of purchasing main materials: goods acceptance (choose one of the two methods and sign in the corresponding position).

(a) Party A shall send its own personnel for inspection; Inspector: Contact: Signature of Party A:

(b) Party A entrusts Party B with inspection. Inspector: Signature of Party A:

Special statement: Considering various factors, it is suggested that Party A choose (a) for acceptance to avoid unnecessary disputes!

Six, procurement advocate material acceptance rules:

(1) After the goods arrive at Party A's construction site, Party A or Party A's entrusting party and supplier shall jointly inspect the goods. If the supplier's products fail to meet the national quality standards after inspection by both parties, Party B shall coordinate the unconditional return of the supplier and have the obligation to assist Party A in investigating the manufacturer's product quality responsibility.

(2) After acceptance, Party A and Party A's customers shall sign the relevant documents of the supplier for confirmation. If Party A or the person in charge of Party A cannot arrive at the site for receipt due to personal reasons, it shall be deemed that Party B has delivered the products as required by Party A (that is, Party A has no objection to the design, model, quantity and quality of the corresponding products).

(3) Some materials need to be made in the factory and installed on site. After the installation is completed, Party A shall accept it.

(4) After signing the main material purchase agreement, Party B shall organize the main materials to arrive on time according to the construction progress. When the existing materials arrive, Party A or Party A's customers shall check with Party B in time to facilitate Party B's construction. (If Party A cannot be present, Party A's customers will inspect the goods, subject to the corresponding power of attorney)

Seven, purchase advocate material return, replenishment:

(1) When replenishment is needed during construction, Party B shall notify Party A to make replenishment in Party B's financial office three days in advance. If Party A fails to make up the payment to Party B's finance in time, Party B may notify Party A to make up the payment with the balance of other products. If the balance of the purchasing money paid by Party A for the main materials in Party B's finance is insufficient, Party B has the right to unilaterally terminate the purchasing behavior and continue to provide purchasing services for Party A after the balance is replenished. If the resulting project cannot be completed as scheduled, it shall be deemed that Party A agrees to postpone the construction period.

(2) Refund or reduction of customized products and special products (doors, window covers, cabinets, wardrobe cabinets, wardrobe doors, wallpapers, stones, etc.) after signing the main material procurement agreement. ) should be paid in full.

(3) After the goods arrive at the construction site, if they are returned due to Party A's reasons, Party A shall pay Party B the round-trip freight, loss and return expenses of the materials. If the project has been constructed, Party A shall pay Party B the construction fee, material fee, demolition fee, etc.

(4) If the main material supplier does not provide free transportation and handling, the corresponding expenses shall be borne by Party A. ..

(5) Due to force majeure, the main materials selected for this project are out of stock in Chengdu market, and Party A needs to negotiate with Party B to purchase materials of the same grade.

(6) The production and installation cycle of main materials is not within the agreed time limit for a project, and the specific installation time can be found in the purchase order of each product.

(7) Party A and Party B shall sign in writing the related matters of entrusted procurement of main materials for confirmation.

Eight. Settlement of purchasing main materials products: after the return and replenishment of main materials ordered by Party A are completed, it is necessary to check the actual details of main materials with Party B based on the delivery, return and replenishment vouchers given by various suppliers, and settle the accounts according to the actual amount generated by the purchase, and refund more and make up less (those who enjoy Party B's preferential activities will be settled together after the final payment of the project is paid).

Validity period: This agreement shall come into effect as of the date of signing, and shall be automatically terminated after settlement by both parties!

X this agreement is made in duplicate, one for each party.

Signature of Party A (responsible person):

Signature of Party B (responsible person):

Date of signature: year month day.