Step 1: First, clean up the ground sanitation and rectify the uneven ground.
Step 2: spread a damp-proof mat on the clean and flat ground.
Step 3: move the floor to the floor mat, which is more convenient to spread, and then start assembling locks along the wall. When the first board is unfolded, the second board must be connected with the first board. The specific operation is to pick up a board, first put the long face into the groove of the front panel, and then push the side face of the board into the groove of the next floor by hand. If there is a gap, you can tap it with a special tool on the hammer pad.
Step 4: If the customer service needs to ask for a grounding plug or something. We need to measure and cut. Be sure to grasp the size and scale when cutting.
Step 5: All floors are paved and the skirting line is fixed. The baseboard is used to connect the gap between the floor and the wall, so that there is no gap between them.
Step 6: Stick the button glass directly under the door, and the gap between the button glass and the bottom of the door is between 3 mm and 7 mm.. Then press the buckle with a heavy object to make it stick firmly.
Step 7: Finally, put all the tools away and clean them.