(1) Taking calcareous soil as an example, a layer of lime is randomly sprinkled on the leveled sidewalk soil layer, and a shovel is manually used to dig half a shovel depth (about 10 cm). After a little turning, the soil and ash were not mixed evenly at all, and in many cases they became "stuffed" cakes with distinct layers of ash and soil.
(2) Using mechanical loosening and stirring, most of them can be more uniform. But local uneven, inconsistent thickness.
2. Cause analysis:
(1) In recent years, the construction period of key projects is getting shorter and shorter, and the construction time left by builders for sidewalks is very short. You can use the excuse of tight construction period and cutting corners. This has become a routine and a bad habit.
(2) Managers are not aware enough and become accustomed to it.
3. Harm:
(1) There is no subgrade, the thickness of its base structure is insufficient, the lime-soil mixing is uneven, and the compaction degree is difficult to reach the standard.
(2) This leads to the premature subsidence and deformation of a large number of sidewalk facilities, which brings endless troubles in the use function and is not maintained. Reduce economic and social benefits.
(3) Cultivate the bad habits of builders and reduce their quality.
4. Preventive measures:
(1) This common disease is a persistent disease in Beijing in recent years. Sanctions should be taken, such as fines according to supervision laws and regulations, or inspections at the time of project completion and acceptance, and double maintenance funds should be compensated to the management unit according to the insufficient quality of lime soil.
(2) In order to strengthen the internal management of the enterprise, we must control the quality indexes such as flatness, width, elevation, compactness and thickness of dirt roadbed and trail base according to the standard requirements.
(3) Gradually solve the lime-soil factory mixing measures.