Plan ahead
The designer will quickly work out the material schedule for you according to the architectural drawings and curtain wall engineering scheme. With this plan, everything is under control.
cooperative business operation
The project management department will work closely with the production department to carefully arrange the processing plan according to the construction progress and the actual situation on site to ensure that all products arrive on time.
♂? Installation step
Pay-off, fixing skeleton joint, fixing skeleton, installing aluminum plate, processing and inspection of closed structure are all very important and indispensable.
Material selection
The quality, color and pattern of aluminum plate should meet the design requirements, and there must be a product certificate.
Bone treatment
If steel keel is used as curtain wall skeleton, attention should be paid to its specification and shape meeting the design requirements, and rust removal and rust prevention should be carried out to ensure safety and reliability.
Aluminum plate installation
If there are no special requirements in design, we recommend using core-pulling aluminum rivets. Pay attention to the rubber ring in the middle, and the rivet spacing should be controlled between100-150 mm.