5 personal work summaries of maintenance workers
Summary is a comprehensive and systematic summary of a period of study, work or its completion. Through it, we can correctly understand the advantages and disadvantages of previous study and work. Let's write a summary for ourselves. How should I write a summary? The following is a summary of the personal work of the maintenance worker I compiled for you, hoping to help you!

Maintenance worker's personal work summary 1

Time flies and 20 years are coming to an end. First of all, I would like to thank the company for affirming my work and promoting me to be the property manager. During this year, under the correct guidance of the group company and project leaders, and with the close cooperation and unity of all departments, all tasks assigned by the company leaders were successfully completed, ensuring the safe operation of all equipment in the park. We have made some achievements and contributed to the completion of the company's quality objectives. In order to sum up experience and push the work in 20__ years to a new level, the year-end summary of property maintenance workers in 20__ years is as follows:

First, complete the daily work

1 and 20 * * years, about _ _ _ _ items of zero maintenance work were completed, including public * * * areas, owner maintenance and merchant maintenance. Get praise and recognition from owners and businesses.

2. Strengthen on-site management, supervise the construction of residential decoration units in accordance with the rules and regulations of the management office, without affecting the city appearance and safety management of the residential area, and construct the central air-conditioning and fire-fighting pipes of shops in accordance with technical specifications to ensure the normal operation of the central air-conditioning system and fire-fighting system.

In March and _ _ month, the post responsibilities and workflow were revised, and on this basis, the work records and equipment operation records were improved, and the post responsibilities were implemented.

4. Copy the water and electricity meter every month, and collect monthly water and electricity billing and management fees in cooperation with finance.

5, _ _ building fire escape reconstruction. The original ring lights and electronic ballasts cost about _ _ yuan, and the energy-saving lamps after transformation cost about _ _ yuan, and the number of transformation is about _ _.

6, _ _ building corridor lighting renovation. The cost of the original _ _ integrated exhaust lamp is about _ _ yuan, and the cost of the energy-saving lamp after transformation is about _ _ yuan, and the number of transformation is _ _.

7, _ _ negative layer pump noise treatment. The vibration and noise in the use of domestic water pump house make many owners in Building A complain that the noise of water pump seriously affects their quality of life. This problem has been solved through the transformation of the environmental protection bureau and the construction unit.

8. During the thunderstorm, timely dredge the garbage in the open ditch pipeline in residential areas, and do a good job in flood drainage and flood control.

Second, the building renovation

According to the company's deployment, with the consent of the group company, the engineering department successfully completed all the construction tasks assigned by the company, saving costs for the company.

1, _ Building Safety Management Department, Engineering Department office decoration.

2. Pour cement on the pavement at the entrance of the underground garage.

3. Laying barrier-free access at the entrance of the sightseeing elevator hall.

4. The green belt in front of the shops in the building has been paved with blue bricks.

Third, the maintenance of equipment and facilities.

At present, the overall situation of community equipment maintenance is still there. All equipment is maintained according to the equipment maintenance instructions, and daily inspection is carried out, and it is in good working condition at present.

1. Complete the operation, maintenance and cleaning of the equipment in the core power distribution room of the building in strict accordance with the requirements of the operation and maintenance specifications of the power distribution system and with reference to the annual work plan. At the same time, the bus duct in the distribution pipeline shaft of each floor should be maintained regularly.

2. Update of elevator inspection method. In view of the frequent elevator accidents, this paper analyzes and summarizes the phenomena not found in the inspection by the engineering department, and improves and perfects the original inspection method. Strengthen the inspection of elevator comfort, stability and noise, and observe the operation of car roof and pit. Supervise the maintenance unit to improve the maintenance level and eliminate hidden dangers.

3. Maintenance of central air conditioning equipment, monthly cleaning of ceiling cooling tower and chilled water pipeline. Investigate _ _ coil fans in _ _ stores every month, and repair _ _ coil air ducts with different problems. In, derusting and painting were carried out on the cooling water pipes in the machine room and ceiling, which improved the safe operation performance of the equipment and ensured the normal supply of refrigeration in summer.

4. The generator should be maintained once a month. During maintenance, it should be turned on for _ _ minutes to ensure rapid power generation in case of power failure.

5. Check the domestic water pump house _ times every day to ensure the safe operation of the equipment and create a good living environment for the owner.

6. Maintenance of weak current equipment, comprehensively clean up the weak current tube wells in the building, and cooperate with telecom, China Mobile, China Unicom and other companies to install, repair and maintain the equipment.

Summary of personal work of maintenance workers II

Time flies, and before you know it, the year will be over. Looking back, I gained a lot this year. Thanks to their conscientious teaching, I can't grow up without them! The following is a summary of my work:

I. Goals to be achieved in 20__

When I first became a full-time employee, I set a goal to standardize my maintenance process. This year, we should be able to complete all plastic surgery, door replacement and minor accidents independently, and also master the maintenance technology of major accidents as soon as possible. At the same time, we should also get rid of carelessness, improve the quality of maintenance, put an end to repair rate, and do a good job in every car. This is not only responsible for customers, but also for ourselves; At the same time, we should learn as soon as possible, learn as much technology as possible, and strive for independent maintenance. Now it seems that the original goal has been achieved, and it can be repaired by itself after coming to the car, and both the maintenance process and the maintenance quality have been greatly improved; No longer the original rookie!

Own problems and advantages:

I also have some shortcomings in my usual work, and I am a little careless. Although my talent is not as good as being treated, I am not afraid of being dirty and tired, and I am willing to learn. Otherwise, what is waiting for me is being "eliminated"!

Second, new goals for next year.

1, further standardize your own maintenance process, improve your own maintenance quality, and try to put an end to maintenance;

2. Grasp the maintenance of major accidents as soon as possible. Key points, skilled use and maintenance as soon as possible;

3. Participate in more training, strengthen your skills and learn more new maintenance techniques;

4. Improve your maintenance efficiency as much as possible and maintain the most vehicles in a limited time;

A new year, a new atmosphere, adjust the mentality, grow in training, and hone in work. Meet the new challenges after 20 years!

Summary of personal work of maintenance workers 3

Maintenance currently has 26 employees, mainly responsible for the operation, maintenance and technical transformation of 590 sets of equipment in four sections: air separation, gasification, purification and synthesis. During the 20__ year maintenance, the following work has been mainly done:

First, maintain the equipment to ensure the stable operation of production.

Equipment management focuses on daily maintenance. Only when the daily maintenance is in place, implemented to people and detailed, can accidents be avoided, and it will not become a "firefighter" who goes to put out the fire wherever it catches fire.

1, strengthen inspection, twice a day. The second thing to do when going to work in the morning and afternoon is to go to the site for inspection. Without going through the formalities, sign the record book, and the management will conduct random checks from time to time. During the inspection, it was found that the vibration of the ammonia water pump was too large, and the bearing was replaced by reversing maintenance, which ensured the normal operation of the equipment.

2. Lubrication management, seriously implement the "five settings" and "three-stage filtration", such as lubricating filter bearings and belt bearings with lithium-based grease regularly to reduce equipment wear and prolong equipment operation time. Establish equipment lubrication ledger, and pay attention to the consumption of lubricating oil.

3. Sealing management, including leakage of dynamic and static equipment. Whether it is flanges, mechanical seals, welded joints, etc. Early treatment shall be found in time, such as flange leakage of 2# expander of air separation unit, and timely treatment shall be carried out. Gasification 1# additive pump body is broken, and repair welding is carried out.

4. The management of special equipment, including the maintenance of electric hoists, traveling cranes and tricycles, shall be the responsibility of special personnel, and other personnel shall not use them, otherwise penalties will be imposed. Cooperate with boiler inspection office and Anhuan to complete the calibration, sealing and listing of expired safety valves.

5. Equipment failure is a direct threat to production. After receiving the notice, we asked to rush to the scene to eliminate it in time to ensure stable production.

Second, the outsourcing rectification project was completed as scheduled.

In addition to daily equipment maintenance, overhaul also undertakes on-site rectification and technical transformation in production, integration, safety and environmental protection, instrumentation, electricity and technical transformation, so as to clear the way for further stable production and safe production. Such as: air separation ladder rectification, bar mill platform railing rectification, laying of all fire manhole covers in battery limit, completion of 60 sets of heating welding and installation of gasification trestle in spare time, water heating and pressure test recovery in each section, installation of filter at the inlet of gasification slag pool pump, installation of valves and pipelines in gasification grey water pipeline, ammonia wastewater evaporation by using Oriental energy, installation of valves in pipelines, instrument heating pipes, motor and electrical disassembly inspection, etc. Although the workload is heavy, we will do our best.

Third, the top priority of planned parking and maintenance.

A lot of work has been done to do a good job in planned parking and maintenance. For example: 10, the company intends to stop.

1. Prepare for the project, communicate with the process, determine the items that must be shut down for maintenance, and finally determine 56 items, including 9 key items, 7 instruments, and 6 renovation items, such as gas-gas heat exchanger tube bundle leakage elimination, gray water heater tube bundle cleaning, water cooler, etc. Cleaning the first and second coolers of the condenser and supercharger; Air compressor guide vanes are changed into actuators; The filler of the pipeline mixer is changed to blades; Silo reconstruction, etc.

2. Implement personnel, set up the person in charge of the maintenance project team, prepare the platform for tools and materials, submit the scheme in time, and prefabricate it in advance, such as purifying the vent separator, reforming the 1# silo, and installing the instrument code detector.

3. Hold a special meeting to mobilize everyone, boost morale and ensure the smooth and safe completion of maintenance.

4. Check the maintenance process at different levels, and strictly handle the maintenance working ticket. With the progress of overhaul, more than 20 overhaul items have been arranged, such as: adding water seal cylinder to grey water, reserving 9 items for blind death of No.3 gasifier, erecting high flash tower and true flash tower, replacing the valve of syngas pressure gauge, venting to torch, adding valves and pipelines, and purifying guide shower. Although the workload is heavy and the task is heavy, with everyone's efforts and overtime work, we have completed every planned downtime and achieved the expected maintenance requirements. I plan to park twice this year.

Fourth, comprehensive aspects.

1, strict management of labor discipline, one penalty at a time.

2, business study every day a problem often unremitting, theoretical skills exam once a month.

3. Convey the spirit of the meeting and sign it.

4. Safety management is always talked about, and there has not been a safety maintenance accident so far.

Fifth, there are shortcomings.

1, continue to strengthen labor discipline management.

2. Strengthen the implementation of working tickets.

3. Increase spare parts reserve.

This year is spent in the busy, in line with "stable production, equipment must be stable first;" With the idea that the output is high or not, the output rate of single equipment should be improved, all our maintenance personnel are trying to push the existing equipment work of the branch to a new level.

Summary of personal work of maintenance workers 4

Twenty years have passed. During this year, I deeply realized the sweat and happiness of my work. I dedicated my youth to the cause of machine maintenance that I love. This year's work has ended and gained a lot. Let me write a little about the first half of the year and set new goals for the second half.

First, ideological understanding.

During this year, as a mechanic, I was strict with myself ideologically. I loved my job. I was strict with myself and pushed myself. I tried to think that this young man could bear hardships, was not too dirty and tired, and worked hard. He never dragged his feet when he started working. I can actively participate in various activities organized by the company. Over the past year, I have successfully completed all the work arranged. I believe that in my future work, I will overcome my own shortcomings and make greater progress through my own efforts with the care of my leaders and the help of my colleagues. Next year, I will work harder, study harder and practice harder.

Second, maintenance work.

In terms of maintenance work, this year's task is very heavy, and there are several golden weeks. For the normal operation of ropeway equipment, the company has arranged a lot of overtime, but in any case, in order to improve my maintenance level, I insist, I believe that the more work, the better my maintenance technology. At ordinary times, we also strive for every maintenance opportunity at work. I ask old comrades for maintenance experience, and I usually chat with them to learn. This year's work is over, and next year's work is also the beginning of tension. These are mostly jobs that need to be done seriously. We should learn from the work and understand and accumulate work experience every time.

Third, the system.

While doing all the work well, strictly abide by the company's rules and regulations. Be strict with yourself. Handle the relationship between business and personal affairs, be careful about the interpersonal relationship of colleagues and avoid blushing with colleagues again. Next year, I will be more diligent, work harder, as always, abide by the company system, learn the new system introduced by the company, study professional knowledge harder, and make my business level by going up one flight of stairs.

Fourth, safety work

Safety is the key point. Whether it is work or life, life safety and mechanical safety need our constant attention. This year, there have also been some individual safety accidents at work, and some have been slightly stumbling. These small problems prove that there is still some negligence, insufficient attention to the progress of road sections, and insufficient safety awareness to consider road sections. In the future work, it is necessary to make up for the thoughtless and thoughtless security risks. In the first half of next year, we should seriously study safety regulations, safety production and safety precautions, and pay attention to safety. Only in this way can the maintenance of the ropeway be successfully completed, and there will be no equipment safety accidents and life safety accidents, and some hidden dangers will be eliminated. Even in life, we should not relax our personal safety.

To sum up the above points, there are still many shortcomings. We should study harder in next year's work and finish the work for 20__ years better.

Summary of personal work of maintenance workers 5

In the busy work, 20 years passed quickly. In a year's time, with the care and help of leaders and colleagues, I have given full play to my work skills, and my work and business level have made great progress through my continuous efforts. Continuously improve working methods and improve work efficiency. Summarize the past and learn good work experience. Below I will make a summary of all the work in 20__ years.

1, working conditions.

Our main job is to cooperate with maintenance, emergency rescue, spare parts collection, or clean up the garbage, scrap steel and old spare parts left over from on-site production and maintenance. Can complete the tasks assigned by the leader, check spare parts quickly and safely, and clean up. Sometimes equipment maintenance can cooperate with maintenance work with heart. When the equipment maintenance is busy, most of them are fighting at work for more than 0/4 hours a day. Because the car use plan is not standardized and the demand is tight, they have to run back and forth in the workshop hundreds of times every day, sometimes it takes a long time to fix it, and they can't rest after working overtime. In addition, my car is noisy, the cab temperature is high and the heat dissipation is poor, so the whole person is like taking a bath. Moreover, under the working environment of narrow road surface and poor road conditions in our workshop, we all have no complaints, can treat them correctly, work hard and complete various tasks seriously.

2. Safety.

At work, we can consciously and strictly demand ourselves, consciously abide by labor discipline and safety operation rules, seriously study traffic regulations, and strictly abide by traffic regulations and factory rules and regulations. Earnestly complete their own work, so as to achieve the safety production policy of sounding the alarm, putting safety first and putting prevention first. It plays a preventive role. There were no illegal accidents and no duty throughout the year. Under the condition of ensuring driving safety, we have achieved: study hard and constantly improve safety quality. As a driver, I try to make the motor sound, concentrate, turn the steering wheel and pay attention to safety. Although the driver's job is monotonous, he needs a strong sense of responsibility and cannot be careless when driving. He should concentrate on driving a good car, always want to be safe, prevent accidents everywhere and be safe.

3. Respect discipline.

Strictly abide by the rules and regulations formulated by the company, do not fight, steal, do anything that will damage the corporate image, respect leaders, unite colleagues and work hard. Concentrate on work, do not violate labor discipline and factory rules and regulations, take the factory as the master and safeguard the interests of enterprises.

4. Main problems and next steps.

I. Main issues

1, lack of serious work, lack of initiative, and little understanding of unsafe factors in the workshop.

2. Due to the poor road conditions, narrow roads and many intersections in our workshop, there are overspeed behaviors caused by unsafe factors.

3, vehicle maintenance, maintenance, repair and other work is not in place.

Second, the next step.

1. In the new year, we have to deal with the production of two engines, which is twice as busy as this year. Then we must do our job well, do not overspeed, overload and other illegal acts, ensure safe production, and strengthen the maintenance, inspection, repair and maintenance of vehicles. Only good maintenance can ensure safe driving. It brings favorable conditions for the needs of production and maintenance.

In the new year, we should study the traffic laws and regulations harder and strengthen our self-safety awareness. We should correct our shortcomings, unite as one, do our own work well, strive to better complete the tasks assigned to us, and strive for a higher level of military work.

The personal work of the maintenance worker summarizes 5 related articles:

★ The personal work summary of the maintenance worker is 5 articles 202 1

★ Summary report of personal work of maintenance worker

★ See personal work summary of maintenance personnel.

★ 2020 maintenance worker's personal year-end summary model essay 5.

Taken the annual work summary of 5 articles, 2020 equipment maintenance man.

★ Maintenance worker's annual work summary model essay 5 2020

★ Summary of personal work of repairman

★ Personal year-end summary of maintenance workers in 2020 with 5 essays.

★ Annual Work Summary of Maintenance Electrician in 2020 5

★ Five personal work summaries of equipment maintenance