2, be careful not to let the material be affected with damp. In summer, the air humidity is high, and some materials that are easy to absorb moisture, such as wood boards, plates, gypsum boards, etc., are easily affected by moisture if they are not handled properly during transportation or storage. Moldy spots will appear on wet boards. Because of the large shrinkage coefficient of the board, the wooden keel and wood products made of wet board are gradually dried in the air, and after the water in the material volatilizes, it is easy to crack and deform, which will also have an impact on other materials. For example, gypsum board ceiling with plate as keel, because the board _ stool shrinks? Ren? Hey? Nine? What is the benzene absorption rate? タ? At a loss Hey, easy dad, persimmon jun? To prevent the material from getting wet, please put it in a ventilated and dry place indoors, away from windows and water sources. If the home has a good ventilation environment and a place to put materials, you can easily buy the materials you will use. Materials piled up in warehouses are generally damp, and ventilation and drying at home can ensure the quality of materials to a great extent.
3. Pay attention to the treatment of decorative base. Paint is pasted on tiles, floor tiles, and the bottom of decorative surface should not be too dry before wall treatment. The general treatment method is to splash water to fully absorb water, and then use cement mortar or gypsum powder as the base to ensure firm paste.
4. Pay attention to leave room for expansion of the wooden floor. When paving the solid wood floor again, we should grasp the discretion and leave a certain expansion coefficient for the solid wood floor. Too large or too small a floor gap will affect the paving effect.
5. Pay attention to the later maintenance. After the completion of the completed cement floor, 107 rubber floor or cement roof, water should be maintained every day for three to five days to prevent cracking.
6. Pay attention to the rational use of chemical products. Before construction, you should read the instructions of chemical products used, such as glue, adhesive, paint, etc. And the construction must be carried out at the temperature and environment mentioned in the manual to ensure the stability of the quality of chemical products.