2005~2008 Simulation Test Paper for Civil Engineering Specialty
Cost Engineer-Construction Engineering Technology and Measurement (Installation) Simulation Test Paper 1. Multiple choice questions (***20 questions, 2 points for each question) 1. In a set of flowing water, the number of construction processes belongs to _ _. A, process parameter b, space parameter c, time parameter d, running water parameter 2, the total net area of each floor of the building directly used for production and life is called _ _. A, building area b, usable area c, structural area d, auxiliary area 3, the apparent density of ordinary concrete is _ _. A, more than 1800 kg/m3 b, less than 1800 ~ 2600 kg/m3 c, less than 1900 kg/m3 d, 1900 ~ 2500 kg/m3 4. The slump requirement for pouring reinforced concrete is _ _. A, big B, small C, equals D, regardless of 5. In a concrete mix design, it is known that the unit water consumption is 180kg, the water cement ratio is 0.7 and the sand ratio is 35%. According to the weight method, the stone consumption should be _ _. A, 687kg B, 1362kg C, 1276kg D, 733kg 6, cast-in-place reinforced concrete beams with a span of 6m, when the bottom formwork is removed, the concrete at least reaches the standard value of design strength. A, 50% B, 60% C, 75% D, 100% 7. The construction and installation project fee is composed of _ _ _. A, labor costs, material costs, machinery costs B, direct costs, indirect costs, independent costs C, direct costs, indirect costs, statutory profits D, direct costs, indirect costs, planned profits and equipment costs, taxes 8. In pile foundation engineering, if the pile is easy to sink under the action of external force, then the soil generally belongs to _ _ _ _ _ _ _ grades A, B, C, D and 49. The quantity of slurry transportation is calculated as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ The scaffold works are _ _ _ _ m2 a, 8.4 B, 16.8 C, 30 D, 15 12, one floor below the outdoor terrace of a building, eight floors above the outdoor terrace, basement construction area 1000m2, and ground construction area of 8000m2. The fixed base price of high-rise building fare increase fee should be 2549.44 yuan/100m2. Then the increase fee for high-rise buildings is _ _ _ _ _ _ _ yuan A, 2 16702.4 B, 229449.6 C, 203955.2D There is no pair of questions in the above answers 12: ABCD 13. Does the cap quota include the design pile top surface? Excluding C. In pile foundation engineering, the quota of concrete piles has been reduced, so the quota of pile caps does not include its labor D. According to the construction site, the answer to the question 13 is ABCD 14. The form of the whole house foundation without beam is the inversion of the floor without beam. The inverted enlarged stigma should be included in the calculation of A, Column B and Foundation C in _ _ _ _ _, and another set of quota D should be calculated separately, depending on the construction site. Question 14 choice answer: ABCD 15, ring beam and lintel are connected with ribbed floor. ____ A, volume calculation of the ribbed floor b, ring beam calculation of the ribbed floor c, lintel calculation of the ribbed floor d, ring beam and lintel calculation respectively. Question 15 Choose the answer: ABCD 16. Ordinary plywood doors are calculated by _ _ _ _ _ _ _. If the specifications are different, it can be converted into plywood A, plywood B, plywood C and plywood D 16. Answer: ABCD 17. If the floor and side of the cast-in-place balcony are plastered, can the plastering area be calculated and the plastering cost be ______ A? Yes or no, Party A and Party B discuss D. Question 17: ABCD 18, and none of the above answers is correct. In the anti-corrosion project, the engineering quantity should be calculated by _ _ _ _ _ _ _ _ _ A, the net area between main walls B, the axial area C, the peripheral area D of the wall and the actual pavement area. Question 18 Choose the answer: ABCD 19, plastering height of interior wall. With dado _ _ _ _ _ _ A, indoor floor to ceiling bottom B, dado bottom to ceiling bottom C, dado middle to ceiling bottom D, dado top to ceiling bottom 19. Answer: ABCD 20. In metal structure engineering, component production quotas _ _____ A is only applicable to on-site processing and production B, only applicable to production C of affiliated processing plants of enterprises, and applicable to both on-site processing and production D. Question 20 Answer: ABCD II. Multiple choice questions (3 points for each question) 1, and steel is divided into _ _. A, carbon steel b, structural steel c, manganese steel d, special steel e, alloy steel 2, according to the mechanical properties, road pavement can be divided into _ _. A, elastic pavement B, flexible pavement C, rigid pavement D, semi-rigid pavement E, elastic-plastic pavement 3, the mechanical properties of building materials are mainly _ _. A, strength b, elasticity c, plasticity d, machinability e and interaction with water 4. The construction procedure of a construction project is _ _. A, underground first, then above ground, b, enclosure first, then main body, c, civil engineering first, then equipment, d, structure first, then decoration, e, branch pipe first, then trunk, 5. The factors related to post-tensioned prestressed construction are _ _. A, anchorage b, fixture c, hole design d, pedestal e and hole grouting 6. The construction area includes _ _______ A, traffic area B, usable area C, auxiliary area D, structural area E and net area 7. With the height of 2.2 as the boundary, the calculated building area is _ _ _ _ _ _ _ A, the warehouse B and the equipment pipeline floor C. The earthwork quota of bulldozers should be different _ _ _ _ _ _ Calculate the engineering quantity A, what brand of bulldozer B, the loose degree of soil C, the bulldozer power D, the distance of bulldozer 9, the engineering quantity difference of dynamic compaction of foundation _ _ _ _ _ Calculate the tamping time. The following statement is correct: the quota of precast reinforced concrete piles with water interception is applicable to the water interception pile project with the height exceeding 500mm above the top elevation of the cap. B the quota of precast reinforced concrete piles for water interception is applicable to the water interception pile project with the height exceeding 500mm above the top elevation of the pile cap. C. The cut-off quota of bored piles is the same as the quota 1 1, and the division of related foundations and walls. The correct statement is _ _ _ _ _ _ _ A. When the foundation and the wall are made of different materials, they are located within 300 mm of the ground in the design room; B. When the foundation and the wall are made of different materials, they are located within 300 mm of the design indoor floor; C when the materials of foundation and wall are different, it exceeds the design indoor floor by 300 mm When the dividing line of different materials is D, and the foundation and wall are made of different materials, when the designed indoor floor is more than 300mm, the designed indoor floor is 12, and the sectional works without deducting the hole area within 0.3m2 include ______ A, cast-in-place concrete wall B, cast-in-place concrete slab C, precast concrete column D, precast concrete slab E and masonry wall 13. The following statement is correct _ _ _ _ _ A. Prestressed steel bars and non-prestressed steel bars must be strictly distinguished and adjusted separately. B. The actual amount of reinforcement calculated according to the drawings is the adjustment amount. C. The name and specification of steel bars must be strictly distinguished for steel bar adjustment. The adjustment amount of reinforcement is equal to its actual amount 14, and the division between concrete and reinforced concrete foundation and wall (column) body. The correct statement is _ _ _ _ _ A.A. Subject to the provisions of the construction drawing. B. The enlarged top surface of the foundation is the boundary C, the boundary D of the wall (column) foot, 0.000 E, and the outdoor terrace 15. Pay attention to the ribbed floor. The incorrect statements are _____ A, ribbed floor is ribbed structure B, flat floor is ribbed floor C, flat floor is ribbed floor D without ribs, and if there are two lintels and one ring beam in the slab, the slab is also ribbed floor 16. Anti-corrosion engineering should be divided into different _ _ _ _ _ calculated quantities A, anti-corrosion material type B, anti-corrosion material specification C, anti-corrosion material size D, anti-corrosion material thickness 17, interior wall plastering area, and the area to be deducted are _ _____ A, door and window opening B, empty ring C, skirting board D, and opening area within 0.3m2, e and 0.3m2. The correct statement is _ _ _ _ A. The plastering area of exterior wall decoration is the same as that of ordinary exterior wall. B the plastering area of exterior wall decoration is different from that of ordinary exterior wall. C. the plastering area of exterior wall decoration is calculated according to the actual plastering area. D the plastering area of external wall decoration is not calculated according to the actual plastering area 19. When calculating the number of ceiling joists, what should not be deducted is the area a occupied by _ _ _ _ _ _ _ _, the partition wall b, the inspection port c, the pipe d, the column 20, and the contents of subgrade (groove) shaping engineering, including _ _ _ _ _ _ _ _ _ _, the leveling site b, the average thickness of manual excavation 10cm, the low filling c, and the roller rolling d.