Overall construction scheme of vegetation concrete slope protection and greening?
What are the specific contents of the overall construction scheme of vegetation concrete slope protection and greening? The following Zhong Da consults the bidding teacher to answer your questions for your reference.

I. Overview of the Project

The slope is a rock slope (concrete slope), the slope is stable, the rock structure on the slope is well developed or slightly weathered, and the slope ratio is 1: 1 ~ 1: 0.3.

Second, the slope greening construction methods, technical measures and construction equipment

1, construction technology

The greening technology of rock slope adopts the patented technology of Three Gorges University: vegetation concrete slope protection greening technology, and has applied for four national technology patents. It has obtained three patent certificates and is widely used in Gaobazhou, Geheyan, Three Gorges, Jiangsu, Shandong, Hunan, Yunnan, Sichuan and other places with more than 300,000 square meters.

2. Selection of grass species

The mixed formula of grass seeds is: grass bermudagrass _ _%, Eragrostis curvifolia _ _%, perennial ryegrass _ _%, alfalfa _ _%, Caragana korshinskii _ _% and Lespedeza _ _%.

Bermuda grass is a perennial herb and belongs to warm season lawn. Grass has stolons and rhizomes, which have the advantages of fast propagation, strong growth potential, easy turf formation in a short time, slender leaves, low pruning resistance, strong adaptability, salt tolerance, trampling resistance and extensive maintenance and management.

Eragrostis curvata: Warm-season grass, clustered, with slender leaves, developed roots, up to 90㎝, and strong cold resistance and drought resistance.

Perennial Lolium perenne: cool-season grass, overgrown with weeds, overwintering safely at the low temperature of -30℃, with fast planting speed and strong pest resistance, which can quickly cover the slope and provide a good growth environment for other plants.

Alfalfa: It is a straight-rooted plant, with developed taproots and the characteristics of nodule growth. It can fix nitrogen in the air, resist drought, cold and barren soil, improve soil physical and chemical properties, improve soil fertility, form stolons and produce beautiful purple florets.

The mixed sowing combination is suitable for the temperature and climate in the construction area, and has strong characteristics of soil conservation, slope protection and sand fixation. Mix cold and warm seasons to ensure the slope is stable and green.

3, the construction flow chart.

4. Open the construction channel at the top of the slope to remove weeds and sundries that hinder the construction.

5, slope cleaning, the purpose of slope cleaning: First, clean up dangerous stones. The other is to level the slope to facilitate the growth and maintenance of plants.

6, hanging net anchorage. Green belt _ _ # barbed wire, net _ _ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \

7. Soil selection and treatment. Sandy loam with sand content less than _ _% is hauled with exotic soil, dried in the sun, crushed and sieved.

8. Spraying vegetation concrete. The average thickness of vegetation concrete is \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \ u \u\u\\ u \ u When spraying, the nozzle is perpendicular to the slope, and the distance from the slope is not more than _ _ _ m.

9. Drainage holes. Set simple drainage holes every _ _ m× _ _ m, and the slope has obvious water seepage, so it is necessary to drill _ _ m and install plastic drainage pipes.

10, grass seed. Grass seeds are mixed grass seeds, and cold-season grass and warm-season grass are used together.

1 1, coverage. Covered with non-woven fabric, moisturizing and sunscreen.

12, maintenance. Maintenance is mainly based on sprinkler irrigation. During the construction period, the sprinkler net is composed of black hard plastic pipes, and the rocker nozzle is installed for sprinkler irrigation to ensure the water and nutrients required by the seedlings. After completion, the maintenance will last for half a year. Permanent sprinkler irrigation system can be set up for projects with high landscape requirements.

13, construction equipment

Air compressor, hand drill, mixer, ejector, dump truck, electric welder, pulverizer and high-pressure pump.

Third, measures to ensure project quality

1, and establish a complete quality management system.

Project intends to set up engineering department and central laboratory, responsible for quality work. Each construction team has a quality inspection team, equipped with full-time quality inspectors, and each construction site also has part-time quality inspectors, forming a three-level quality management network. Carry out quality education for all employees, link the project quality with wages, and formulate reward and punishment regulations. That is, according to the construction quality of each subdivisional work, each department of the project intends to set up quality awards with clear rewards and punishments. There is no direct connection between the funds of the first-level quality control personnel and the inspected department, which improves the relative independence of quality control work.

The engineering department and the central laboratory work under the leadership of the chief engineer. The main scope of supervision and inspection is as follows:

(1) Whether the quality and specifications of various materials are qualified;

(2) Whether the construction technology and operation method of subdivisional work conform to the specifications;

(3) Whether the project quality meets the requirements of technical specifications, unqualified projects will not be accepted, and resolutely "start a new stove";

(4) Whether the original records are timely, accurate and complete;

(5) Regularly check whether the performance of various construction machinery is in good condition;

(6) Whether the measurement and test are correct and conform to the specifications;

(7) Whether the implementation of TQC is serious and whether effective measures are taken for weak links;

(8) Whether the construction personnel hold the work license to prevent the construction from escaping;

2. Establish a quality responsibility system

Formulate the quality responsibility system of all departments and posts, so that the responsibility lies with people. Establish the quality objectives of each sub-project for management. The builder of each subsection shall be responsible for the construction quality of the subsection; The person in charge of each construction team shall be responsible for the construction quality of each bid section in the work area where the team is located; The project managers of all departments should be responsible for all kinds of engineering quality of the whole project in charge. In this way, it is implemented layer by layer and the quality management system is straightened out.

3. Carry out quality education and technical training.

Organize the personnel engaged in this contract to learn technical specifications and do a good job in quality education. New workers must receive on-the-job training, and overstocked posts must be certified. Always publicize and clarify the importance of engineering quality, so that all employees can establish the view of "quality first, owner first, prevention first, and speak with data".

4. Establish a central laboratory.

Set up a central laboratory in the project management department. The central laboratory is equipped with instruments and equipment for routine geotechnical test, concrete test, mixture ratio and other complex tests to meet the test service of this project. The central laboratory is equipped with testing engineer who has both theory and practice and experience, and two assistants testing engineer who work under the supervision of engineers. In addition, the central laboratory also fully implements the inspection and quality control of raw materials or test pieces used in the project.

5. Establish the technical disclosure system before construction.

Before construction, please ask the design representative to make disclosure, and put forward unknown or unclear technical problems in the construction drawing, so as to facilitate future construction. Before each subdivisional work starts, the construction personnel shall be disclosed according to the construction organization plan approved by the supervision engineer, and the construction shall be carried out in strict accordance with the construction organization plan to ensure the project quality.

6, adopt the project list system.

The purpose is to strengthen the responsibility, clarify the scope, promote contact and facilitate supervision.

(1) List the person in charge of the project, the person in charge of production, technology, quality control and test, and the supervisors stationed at all levels in the joint management department and the headquarters of each construction group;

(2) List the quality standards and statistical data of main materials and processes;

7, to carry out quality appraisal activities, the implementation of quality award.

The construction team under the project management department will hold a mobile red flag competition with subsection construction as the unit, which will be assessed once a month, with quality, progress and safety as the main assessment contents, and reward the units that have won the red flag. At ordinary times, engineers and technicians should often go deep into the site to track the quality.

Check, supervise and correct in time when problems are found, and ensure the engineering quality. And according to the quality tracking inspection, do a good job of quality award evaluation basis, the implementation of high quality and good price award.

Fourth, measures to ensure the construction period

1. The bidding period of this contract is determined to be days. Time limit control is one of the contents of construction enterprise management, and it is also an important index to reflect the comprehensive management ability. We will establish a good corporate image for ourselves. While building high-quality projects, we will also complete the construction tasks on schedule and bring investment benefits to the owners as soon as possible. Therefore, we guarantee to finish the construction task on schedule the next day. To achieve this goal, we will take the following measures:

(1) Before the commencement of construction, our company will organize engineers and technicians and relevant experts to make a detailed investigation on the environmental conditions of this project, fully grasp the first-hand information of this project, comprehensively evaluate and analyze the geography, geological conditions, water and electricity, road distribution, etc. of the factory building, and make detailed plans and necessary implementation on the supply of local materials needed for this project and the way of mechanical equipment and personnel entering the construction site.

(2) Quickly put into site preparation, and strive to complete all construction preparations within 7 days.

(3) Carry out ideological mobilization throughout the company, put into the ranks of project construction with a brand-new mental outlook, and implement the construction scale, total construction period and quality requirements of the project in the hearts of every employee, so as to unite all employees.

(4) Respect for science, respect for experiments, quality first and strict requirements. Strengthen the quality consciousness of construction personnel. Everything shall be constructed according to "technical planning" and relevant "construction specifications", mass TQC group activities shall be actively carried out, and quality management system and quality assurance system shall be established and improved to ensure speed and progress by quality.

(5) Strengthen the project plan management, make detailed construction progress plans for each sub-item, and express the compilation basis, engineering characteristics, construction methods, technological processes, arrangement of materials, equipment and labor, construction quality and safety assurance measures in words and charts. And satisfy the engineers. Each sub-item work goes smoothly and methodically as planned.

Verb (abbreviation of verb) measures to ensure safety in production

1. Carry out safety education for all employees, conscientiously study and implement national, provincial and municipal safety laws and regulations, provisions on the protection of workers' labor rights and interests, and norms for safe and civilized construction, enhance the legal concept of workers' safety, adhere to the policy of safety first and prevention first, and do a good job in safety construction. Specific measures are as follows:

(1) institutional superior guarantee.

Set up the greening project department, responsible for the safety production and security work of this project, with the project manager as the team leader (the first responsible person), responsible for the safety production and security work of this project, and each team has full-time security officers (the team leader is the first responsible person), responsible for daily production and life safety. The safety management system composed of project managers, engineers and quality and safety management personnel is a top-down responsibility system step by step to ensure safe production.

(2) guarantee from the system

The project department shall organize the safety team of the construction team and the safety officer to improve and perfect various rules and regulations according to the national safety laws and regulations. Establish an accident registration and reporting system. Once an accident occurs, it should be dealt with immediately and reported for registration step by step to prevent the occurrence of major accidents and ensure safe production. According to different types of work, formulate specific rules for the implementation of safety production work teams, conscientiously implement them in production, implement the system of waiting for certificates, educate and train employees on safety production and labor protection before taking up their posts, and enhance their awareness of safety production and labor protection.

(3) Logistics support

Do a good job in the staff canteen, implement a special inspection system for purchased food, prevent the purchase of spoiled toxic food, and put an end to food poisoning accidents. Do a good job in personal hygiene and environmental sanitation, beautify the environment, purify the air, create a beautiful production and living environment, prevent the spread and spread of infectious diseases, ensure attendance and ensure production safety.

(4) from the management guarantee

According to the company's safety production reward and punishment system, combined with the actual situation of this project, the safety production reward and punishment rules are formulated. Reward the construction teams, teams and individuals who have made remarkable achievements in observing national policies, laws and decrees, observing labor discipline, carrying out construction in accordance with safety regulations and construction technical specifications, maintaining production and living order and maintaining social order; Otherwise, it will be punished to ensure the orderly production and life and ensure the safety of production.

Six, civilized construction measures

1, set up eye-catching signs, slogans, and put up construction at the construction site, and make a notification; Blackboard, do a good job in the propaganda of safe production and civilized construction.

2, unified layout, the scene in an orderly way, unified command, to ensure smooth roads.

3. Clean up the site after work, and set up fixed toilets on site to ensure a clean and civilized environment.

4, led by the office to carry out various labor competitions, so that employees can establish a good atmosphere of loving their jobs and enhancing their sense of ownership.

Seven, environmental protection measures

1, enhance environmental awareness, strengthen environmental protection, avoid unnecessary damage to the surrounding environment during construction, and clean and restore the construction site after the project is completed to ensure a beautiful environment.

2, sewage and garbage treatment, sewage set toilet pool and non toilet pool, cement mortar protective layer around the pool, to avoid leakage, the top cover, regular cleaning. Sewage tanks are often sprayed with chemicals to disinfect and clean up sediments. Sewage must be purified before it can be discharged. Garbage is placed in a centralized way, and regularly sent to local designated places for storage or buried in pits.

VIII. Personnel and Organization

1. Set up the greening project department, with project manager 1 person, engineer 1 person and 2 quality and safety managers.

2. Name of concrete worker _ _ _

3, steel workers _ _ _

4. Name of pneumatic driller _ _ _

5. Electrician's name _ _ _

6. Welder's name _ _ _

7. Name of mechanical operator _ _ _

8. Name of ordinary worker _ _ _

* * * Name _ _