What are the advantages of geothermal regeneration technology in Ying Da compared with traditional construction technology?
in terms of speed, quality, cost, traffic interference and environmental protection.

(1), speed

Ying Da geothermal regeneration technology-fast (4-6m/min, 1.5-2km/night)

traditional construction-slow (construction speed is slow and greatly influenced by climate)

(2), quality

Ying Da geothermal regeneration technology-

2. realize thermal bonding between layers, eliminate weak joints and interfaces, and enhance the shear strength and road disease resistance between layers;

3. Without breaking the aggregate and changing the original pavement gradation, the pavement gradation can be adjusted and optimized according to the road use demand.

Traditional construction-generally

1. There are weak interfaces and weak joints, and rainwater is easy to seep down, causing water damage;

2. The pavement has low shear strength and poor overall mechanical performance.

(3) Cost

Ying Da's in-place recycling technology-low (1% original value of the original pavement asphalt mixture can be recycled, only a small amount of new materials need to be added to reduce the material cost. )

traditional construction-high (need to add a lot of new asphalt mixture; The cutter loss in milling and planing construction is large. )

(4), traffic interference

Ying Da geothermal regeneration technology-small

1. The construction only occupies one lane, and other lanes can pass normally;

2. assembly line operation, fast construction and rapid traffic opening;

3. construction by sections, with small working surface and little traffic interference.

traditional construction-big

1. The traffic interference is big, and the construction brings traffic congestion;

2. After milling and planing, the pavement cannot be paved in time, forming a "washboard road", which is harmful to driving safety.

(5), environmental protection

Ying Da geothermal recycling technology-

1. 1% original value of the original pavement materials can be recycled;

2. No dust and noise;

3. No waste discharge;

4. Compared with the traditional process, the carbon emission is reduced by more than 9%.

traditional construction-

1. A lot of waste, noise, dust, etc. are generated;

2. The original pavement materials can't be recycled, so a lot of new materials need to be added, and the transportation of new materials and muck will cause environmental pollution and traffic congestion; 3. The construction process is full of carbon emissions.