(1), speed
Ying Da geothermal regeneration technology-fast (4-6m/min, 1.5-2km/night)
traditional construction-slow (construction speed is slow and greatly influenced by climate)
(2), quality
Ying Da geothermal regeneration technology-
2. realize thermal bonding between layers, eliminate weak joints and interfaces, and enhance the shear strength and road disease resistance between layers;
3. Without breaking the aggregate and changing the original pavement gradation, the pavement gradation can be adjusted and optimized according to the road use demand.
Traditional construction-generally
1. There are weak interfaces and weak joints, and rainwater is easy to seep down, causing water damage;
2. The pavement has low shear strength and poor overall mechanical performance.
(3) Cost
Ying Da's in-place recycling technology-low (1% original value of the original pavement asphalt mixture can be recycled, only a small amount of new materials need to be added to reduce the material cost. )
traditional construction-high (need to add a lot of new asphalt mixture; The cutter loss in milling and planing construction is large. )
(4), traffic interference
Ying Da geothermal regeneration technology-small
1. The construction only occupies one lane, and other lanes can pass normally;
2. assembly line operation, fast construction and rapid traffic opening;
3. construction by sections, with small working surface and little traffic interference.
traditional construction-big
1. The traffic interference is big, and the construction brings traffic congestion;
2. After milling and planing, the pavement cannot be paved in time, forming a "washboard road", which is harmful to driving safety.
(5), environmental protection
Ying Da geothermal recycling technology-
1. 1% original value of the original pavement materials can be recycled;
2. No dust and noise;
3. No waste discharge;
4. Compared with the traditional process, the carbon emission is reduced by more than 9%.
traditional construction-
1. A lot of waste, noise, dust, etc. are generated;
2. The original pavement materials can't be recycled, so a lot of new materials need to be added, and the transportation of new materials and muck will cause environmental pollution and traffic congestion; 3. The construction process is full of carbon emissions.