Power grid planning, also known as transmission system planning, is based on load forecasting and power supply planning. Power grid planning determines when and where to build what type of transmission lines and the number of lines, so as to achieve the required transmission capacity within the planning period and minimize the cost of the transmission system on the premise of meeting various technical indicators.