This topic studies the prevention and treatment of high fill subgrade settlement. High fill embankment should be filled in strict accordance with the design slope, and both sides of the embankment must be sufficient, and the width shall not be subsidized; Overfill width on both sides of embankment is generally controlled at 30 ~ 50 cm, and compacted layer by layer, and then cut slope and shape.