8 model contracts for dredging projects

With the deepening of legal concepts, the frequency of contract use is on the rise, and signing a contract can prompt both parties to promise and perform cooperation in a standardized way. You know, there are many ways to write a contract. The following is a sample of the dredging project contract I compiled for you, for reference only. Welcome to reading.

Dredging Project Demonstration Contract 1 Project Owner: (Party A) Project Contractor: (Party B)

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and good faith, Party A and Party B enter into this contract on the pond comprehensive project through consultation.

I. Overview of the Project

Project name:

Project location:

Project content: pond cleaning, trench digging, cofferdam (earthwork) and sporadic works.

Second, the project scope

Scope of work: confirmed by actual measurement by both parties.

Pond length: m, width:? M, construction depth:? M. Quantity of dredged earthwork: m3

Third, the term of the contract.

Project date:? Year, month, day and date? The contract period ends on:? workday

Fourth, quality standards.

(1) pond dredging: the dense silt excavated to the bottom of the pond shall prevail.

(2) Digging drainage ditch: meet the drainage standard and meet the normal drainage function of farmland near the pond.

(3) Cofferdam (earthwork): stability, seepage prevention and impact resistance are required.

(4) Sporadic works: construction according to Party A's requirements.

Verb (abbreviation of verb) contract price

1. The price of pond dredging: according to? The unit price per cubic meter multiplied by the actual total earthwork volume of dredging shall be settled according to the final approved price.

2. The price of digging drainage ditch: it shall be settled according to the final approved price. 3. Cofferdam (earthwork): The settlement shall be made according to the final approved price.

4. Sporadic projects: settled at the final approved price.

Six, the project payment

After the project is completed and accepted, the project payment will be paid in one lump sum after the project settlement is approved.

Seven, the construction site management

1. Party A shall assign special personnel to the construction site to be responsible for the project quality acceptance and completion acceptance visa. 2. Party B shall assign special personnel to the site to be responsible for the quality, safety and progress of the site.

Eight. Rights and obligations of Party A

1. Party A has the right to stop Party B's illegal operation.

2. Party B's on-site management and operation personnel must obey the command and dispatch of Party A's on-site personnel, otherwise, Party A has the right to terminate this contract and settle accounts according to 70% of the completed qualified quantities.

Nine. Rights and obligations of Party B

1. Fully perform this contract, organize and implement all construction work, and be responsible for the construction period, quality and safety of the project to Party A;

2. Solve the temporary facilities for production and living by itself, and bear all expenses arising therefrom, and obey the management and arrangement of Party A's on-site management personnel.

3, responsible for the preparation of construction plan, formulate management objectives; Organize the preparation of construction plan; To control, supervise, inspect and accept the project quality, construction period, safe production and civilized construction;

4. Carefully organize the construction to ensure that the project quality meets the agreed standards; Scientifically arrange the operation plan and invest enough manpower and machinery to ensure the construction period; Strengthen safety education, conscientiously implement safety technical specifications, strictly abide by the safety system, and implement safety measures to ensure construction safety; Strengthen site management and realize civilized construction; Bear the losses caused by quality rework, construction delay, safety accidents and various fines caused by their own responsibilities;

5. Consciously accept the management, supervision and inspection of Party A and relevant departments; Accept Party A's inspection of its equipment and usage at any time, as well as the valid certificates and certificates of operators;

6. Cooperate with Party A for completion acceptance;

7. Obey the reasonable instructions of Party A's personnel.

X. safe construction

1. Party B shall abide by the management regulations on production safety in engineering construction, carry out construction in strict accordance with safety standards and regulations, and accept the supervision and inspection carried out by industry safety inspectors according to law at any time to eliminate hidden dangers of accidents. All responsibilities and expenses arising from the construction shall be borne by Party B. 2. Party B shall conduct safety education for its personnel on the construction site and be responsible for their safety. In case of safety accidents caused by Party B, Party B shall bear corresponding responsibilities and expenses.

3. All safety protection measures of this project shall be undertaken by Party B. The safety protection articles used by Party B at the construction site shall be solved by itself.

4. In case of heavy casualties and other safety accidents, Party B shall immediately report to relevant departments and Party A in accordance with relevant regulations, and handle them according to relevant national laws and administrative regulations.

XI。 insurance

1. Before construction, Party B shall take out corresponding insurance for all personnel and construction equipment on the construction site and pay the insurance premium.

2. When the insured accident occurs, Party B has the responsibility to take necessary measures to prevent or reduce losses.

Twelve. facility management

Party B shall properly keep and reasonably use the materials and equipment on site. Party A shall not be responsible for the loss or damage caused by improper storage, and all economic losses caused by the delay in the construction period shall be borne by Party B..

Thirteen. change in the work

1. During the construction period, Party B shall not change the original project requirements. The expenses arising from Party B's unauthorized changes shall be borne by Party B, and the delayed construction period shall not be postponed.

2. If there is any engineering change, both parties shall sign an engineering change order after consultation.

Fourteen Project quality

Fifteen. responsibility for breach of contract

In case of any of the following circumstances, Party B shall be liable for breach of contract:

(1) If Party B delays the completion of the project due to its own reasons, it shall pay RMB to Party A? 1000 yuan/day as liquidated damages;

(2) If the quality of the project fails to meet the quality standards agreed in this contract, Party B shall be responsible for rectification until it is qualified, and the construction period will not be postponed.

Sixteen, both parties in the performance of the contract dispute, can mediate; If mediation fails, both parties agree to bring a lawsuit to the people's court where Party A is located. ..

17. This contract shall come into effect after being signed and sealed by both parties. This contract will be terminated after both parties have fulfilled the contract and settled the money.

18. This contract is made in duplicate, with each party holding one copy.

Nineteen. additional

Representative of Party A (official seal)

Date: Representative of Party B (official seal) Date:

Model contract for dredging project 2 I. Project name: _ _ _ _ _ _ _ _

Second, the project site _ _ _ _ _ _ _

Three. Project content: _ _ _ _ _ _ _ _ (including the main earthwork of the river and the ancillary works to complete the main earthwork)

The work includes dam construction, dam demolition, flood control embankment and drainage embankment filling.

Four, engineering standards:

1. River standard: bottom width _ _ _ _ _ _ meters, bottom elevation _ _ _ _ _ _ meters, and slope ratio. According to the river construction specification, the maximum error of the center line is about 20cm, the error of the river bottom elevation is not greater than +3.0 cm-20 cm, and the average value is not higher than the design elevation; Bottom width; 30cm, with an average value not less than the design bottom width; The local slope and overall slope shall not be greater than the design value (1: n), and the rest shall be implemented according to relevant technical specifications and standards.

2. Other requirements:

Five, civilized construction and engineering safety:

Party B shall seriously carry out civilized construction and do a good job in safety, and Party B shall be responsible for the economic compensation and safety accidents that do occur due to Party B's responsibility during construction.

Six, the construction time:

This project started in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Seven. Contract price and payment method:

The tentative construction earthwork volume of this project is _ _ _ _ _ _ _ m3, the comprehensive unit price is _ _ _ _ _ _ yuan /m3, and the tentative contract price is _ _ _ _ _ _ _ _ _ _ _ (in figures _ _ _ _ _ _ _ _). _ _ _ _ _ _ _ yuan). Payment by installment is:. The final settlement of the project shall be subject to the quantities approved by the supervisor.

Eight. Responsibilities of both parties:

Party A's responsibilities:

1. Before starting work, Party A shall define the relevant tasks and requirements of the project construction according to relevant documents and specifications.

2. Party A shall organize examination and approval in time after receiving the commencement application or commencement report submitted by Party B..

3. Party A shall provide relevant items for Party B to organize the construction according to the contents of the bidding documents or consensus.

Pieces.

4. Party A shall pay on time according to the payment method stipulated in this contract.

5. Party A shall timely coordinate the contradictions in the construction process.

Party B's responsibilities:

1. Party B guarantees that according to the contents of the contract (including the tender documents and written documents agreed by both parties),

Complete the project task on schedule with good quality, and press if it is overdue; RMB _ _ _ _ _ _ _ _ _ _ Yuan/day will be deducted as a fine.

2. Party B must go through all construction-related procedures according to regulations before the commencement of construction, including: paying a deposit of _ _ _ _ _ _ _ _ yuan before signing this contract; Provide Party A with the construction plan; Commencement report, etc. Otherwise, Party B shall not start work. If Party B fails to go through the above procedures within three days, Party A will disqualify Party B from winning the bid.

3. During the project construction, if Party B terminates the project construction without justifiable reasons, Party A will not settle the cost of the constructed part, and will deduct the performance bond. The consequences arising therefrom shall be borne by Party B. ..

4. Party B shall actively coordinate and handle contradictions.

Nine. Others:

X. Matters not covered in this contract shall be settled by both parties through consultation.

XI。 This contract shall come into effect after being signed by the legal representatives or entrusted agents of both parties and stamped with the official seals of the unit respectively.

12. This contract is made in sextuplicate, including two originals and four copies, with each party holding one original and two copies.

Party A (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

Legal representative (signature or entrusted agent): _ _ _ _ _ _

Dredging Project Demonstration Contract 3 Party A:

Party B:

I. Project name:

Second, the project site selection:

3. Project content: (including the main earthwork construction of the river channel and the auxiliary work of completing the main earthwork, including dam building, dam demolition, flood control embankment and embankment filling with drainage, etc.). ).

Four, engineering standards:

1. River standard: bottom width x meters, bottom elevation x meters, slope ratio x, according to river construction specifications, the maximum error of X center line is about 20XcmX, the error of river bottom elevation is not more than +3.0 cm-X-20 cm, and the average value of X is not higher than the design elevation. The bottom width is 30Xcm, and the average value is not less than the design bottom width; The local slope ratio is X 1: n (1 5%), and the overall slope of x is not steeper than the design value (1: n). Other aspects shall be implemented in accordance with relevant technical specifications and standards.

2. Other requirements:

Verb (abbreviation of verb) civilized construction and engineering safety: Party B shall seriously carry out civilized construction and do a good job in safety, and Party B shall be responsible for X economic compensation and safety accidents that do occur due to Party B's responsibility during construction.

Construction time of intransitive verbs: This project will be completed from XX to XX, XX, with a construction period of X days.

Seven. Contract price and payment method: the tentative total amount of earthwork of Project X is Xm3, the comprehensive unit price is X Yuan /Xm3, and the tentative total contract price is X Yuan (in figures: X Yuan). X is the installment plan. At the end of the project, the calculation of X shall be subject to the quantities approved by the supervisor.

Eight. Responsibilities of both parties:

Party A's responsibilities:

1. Before starting work, Party A shall define the relevant tasks and requirements of the project construction according to relevant documents and specifications.

2. Party A shall organize examination and approval in time after receiving the commencement application or commencement report submitted by Party B..

3. Party A shall provide X copies of relevant documents compiled by Party B according to the contents of the tender documents or consensus.

4. Party A shall pay on time according to the payment method stipulated in this contract.

5. Party A shall timely coordinate the contradictions in the construction process.

Party B's responsibilities:

1. Party B guarantees that according to the contract contents (including the bidding documents and written documents agreed by both parties), X will complete the project tasks with good quality on schedule, and will be fined RMB/day if it fails to do so.

2. Before starting construction, Party B must go through all the formalities related to construction according to the regulations, including: before signing the contract, X shall pay a duplicate deposit of X yuan; Provide Party A with the construction plan; Commencement report, etc. Otherwise, Party B shall not start work. If Party B fails to go through the above procedures within three days, Party A will disqualify Party B from winning the bid.

3. During the project construction, if Party B terminates the project construction without justifiable reasons, Party A will not settle the fees paid by X to the construction department, and impose a fine on the performance bond. The consequences arising therefrom shall be borne by Party B. ..

4. Party B shall actively coordinate and handle contradictions.

Nine. Others:

X. Matters not covered in this contract shall be settled by both parties through consultation.

XI。 This contract shall come into effect after being signed by the legal representatives or entrusted agents of both parties and stamped with the official seals of the unit respectively.

12. This contract is made in sextuplicate, including two originals and four copies, with each party holding one original and two copies.

Party A and Party B (official seal): Party B (official seal):

Legal representative (signature): (or entrusted agent) Legal representative (signature): (or entrusted agent)

XX year XX month XX day XX year XX month XX day

Dredging Project Demonstration Contract 4 Party A: Changjiang Management Office of Jiangdu District, Yangzhou City (hereinafter referred to as Party A) Party B: Yangzhou Yu Sheng Water Conservancy Construction Engineering Co., Ltd. (hereinafter referred to as Party B)

According to the Construction Law of People's Republic of China (PRC), the Law of People's Republic of China (PRC) on Safety in Production and other relevant laws, regulations and rules, both parties have defined their respective legal rights, obligations and economic responsibilities in the construction, and according to the specific conditions of this project, both parties voluntarily sign the following contract terms on matters related to the construction of this project based on the principle of equality and mutual benefit through consensus.

I. Project Overview and Contracting Method

1. Project name: Tongjiang Gate Channel Dredging Project.

2. Project location: the inland river connected with the Yangtze River south of Tongjiang Gate of Changjiang Management Office in Jiangdu District. 3. Project contracting method: contracting for work and materials.

4. Project Overview: The project is located in the south of Tongjiangmen, Sima Town, Jiangdu District, and is connected with the Yangtze River. Due to the long-term uncleanness of some sections of this river, a large amount of river silt has accumulated, which has affected the navigation of ships in the channel. In order to ensure the normal navigation of ships, it is necessary to clean up the silt in this reach.

Second, the project content

Clean up the silt in the river that affects the navigation of ships in the channel, and the engineering quantity is about 6000 cubic meters.

Third, the project cost

The project cost is: (¥). This project is a lump sum price, and the cost overrun will not be compensated.

Fourth, the project cycle

Project commencement date: year month day? Project completion date: year month day?

Verb (abbreviation of verb) quality requirements

Engineering quality standards:

Terms of payment for intransitive verbs

After the project is completed and accepted, Party A shall pay Party B 100% of the total project cost? .

Seven. Responsibility of both parties

1. Party A is responsible for providing the use and design requirements of the whole project; Provide the electrical location for site use; Provide material transportation channels and necessary material stacking places. 2. Party B: Provide Party A with the project quotation.

Eight. any other business

Party A and Party B agree to reach the following agreement:

1. If the construction cannot be carried out due to special circumstances or force majeure, the construction period can be postponed; All losses caused by breach of contract shall be borne by the breaching party.

2. If Party A or Party B breaches the contract and fails to implement the contract, they may appeal to the superior competent department or arbitration institution.

3. Party B shall carry out safe construction in strict accordance with national laws and industry regulations on construction safety. If the construction project causes personal and property damage within the reasonable service period due to Party B's reasons, Party B shall be liable for damages.

4. Other matters not covered shall be settled by both parties through negotiation.

5. This contract is made in duplicate, which shall come into effect after being signed by both parties, and each party holds two copies, with the same legal effect. After the project payment is settled, this contract will automatically become invalid.

Name of Party A's unit:? Yangzhou Jiangdu District Yangtze River Management Office (official seal)? Legal Representative: Authorized Agent:

Name of Party B's unit:

Yangzhou Yu Sheng Water Conservancy Construction Engineering Co., Ltd.? Legal Representative: Authorized Agent:

Year? Month? sun

(official seal)

Dredging Project Demonstration Contract 5 Party A:

Party B:

Due to the construction needs of the project department, Party B voluntarily undertakes part of the dredging works in this bid section through on-site reconnaissance and friendly negotiation between both parties. In order to ensure the timely and high-quality completion of all the contents stipulated in the contract and clarify the responsibilities and obligations assumed by both parties, this contract is hereby signed for compliance.

1. Project name: huixian city Shimen Reservoir reinforcement project 1 contract.

Second, the price:? Yuan/m (including tax and electricity)

Three. Acceptance method: the sand egg layer and working face width required by the project construction shall prevail.

Four. Stacking requirements: the location shall be designated by Party A. ..

Verb (abbreviation of verb) engineering quantity: based on the actual engineering quantity measurement.

Payment by intransitive verbs: When Party B completes the mobilization of machinery and equipment within three days after the signing of the contract, and the project progress reaches 70%, Party A shall pay Party B 300,000 yuan within 30 days after the completion of the project, that is, 80% of the total project price, and the remaining 20% of the project price shall be paid according to the measurement allocation of the construction unit.

7. Project duration: from 20xx years? God-20xx years? Month? Days, the construction period is * * * days 3 VIII. Contract content:

(1) Party A's responsibilities:

1. Party A must provide a sludge storage site.

2. Party A must provide technical disclosure of construction drawings in time.

3. Party A is responsible for providing technical guidance to Party B, and performing the duties of guidance, inspection and assessment on Party B's quality, progress, safe production and civilized construction during the project implementation.

4. Party A must organize personnel for acceptance and settlement in time. The project payment must be paid in time as agreed.

(II) Party B's responsibilities:

1. Party B shall provide sufficient personnel and machinery to meet the needs of construction progress, strictly implement the construction period requirements of Party A, and complete the contract work on time.

2. Party B must have full-time production and safety management personnel to manage production and safety; Responsible for the education of laws and regulations, safety production education and technical training of subordinates, do a good job in environmental protection and civilized construction, and bear the responsibility and extra expenses for violating the above. In case of personal injury or major equipment accident due to Party B's own reasons, Party B shall bear all responsibilities and handling expenses except compensation from the insurance company.

3. Party B must obey the management and business plan of Party A.. Violation of regulations or disobedience to Party A's personnel management will be punished according to the seriousness of the case.

4. Party B shall not do anything that damages the interests and reputation of Party A; The project shall not be subcontracted in any form; If this happens, Party B shall be responsible for all the consequences.

5. Party B must handle work-related injury insurance for construction personnel, and submit a copy of ID card of towing personnel to the company office for accident insurance. X. Settlement of disputes?

1. All disputes related to the Company arising from the performance of this Contract shall be settled by both parties through consultation; If negotiation fails, it shall be handed over to the judicial department for handling. 2. Matters not covered in this contract shall be supplemented by both parties through consultation, and the supplementary terms shall have the same legal effect as this contract.

3. Matters not mentioned above shall be handled in accordance with national laws and relevant regulations.

XI。 This contract shall come into effect after being signed by both parties. Both parties must abide by this contract. If one party breaches the contract, it shall compensate the other party for 200,000 yuan. After the project is completed and accepted, both parties fulfill their obligations under the contract and the contract is terminated.

Twelve, due to serious natural disasters and force majeure factors, the construction period can be postponed.

Thirteen. This contract was signed in huixian city on, in duplicate, one for Party A and one for Party B, all of which have the same effect.

Party A: (official seal) Party B: (official seal)

Legal person or authorized agent: legal person or authorized agent:

Model Contract of Dredging Project Employer 6: _ _ _ _ _ _ _ _ _ _ _ _; Contractor: _ _ _ _ _ _ _ _ _ _ _ _ _

Based on the principle of equality and mutual benefit, the following agreement is reached on the field road project of Puji Town Land Consolidation Project:

1. Responsibility of the Employer: Before the contractor enters the site, clear the obstacles in the construction area and provide the contractor with temporary leveling points and the location and buried depth of underground pipelines within the project scope.

2. Contractor's responsibility: c25 concrete is poured on the existing subgrade, with a width of 4m and a thickness of 16cm, and the project meets the standard of Class IV highway.

3. Construction method requirements:

1. Equipped with mixing equipment and vibrators, vibrators, channel steel, polishers, generators and pulp pumps required for construction.

2. The concrete mixture ratio should meet the standards.

3. The vibrating beam and vibrator must be operated according to the standard, and it is forbidden to be idle and cope with the construction.

4. The pulp pump and grinder need to polish the concrete pavement for 3-4 times. It is forbidden to polish and polish the dried cement on the concrete pavement.

5. Finish the brushing treatment after pulp lifting.

6. Within 72 hours after concrete pouring, it is necessary to cut the seam, and cut the seam every 5 meters horizontally, with a seam length of 5cm.

7. If the above requirements are not met, the Employer has the right to refuse to pay the project payment.

Four. According to the actual engineering quantity and on-site visa settlement.

The contractor plans to start work on March 26th.

6. The contractor shall carry out the construction in accordance with the technical specifications for earthwork construction and the construction procedures and requirements provided by the Employer.

Seven. When the engineering structure exceeds the provisions of Article 3, the Employer shall grant the on-site visa as the basis for future settlement.

Eight. Pay 80% of the corresponding project cost for every 65,438+0,000 square meters of project quantity; Pay 80% of the total project payment at the end of the project, and pay all the project payment after the project is accepted. Responsibilities of both parties: The Employer must ensure that the obstacles within the project scope are removed on time and shall not delay the contractor's construction progress.

This agreement is made in triplicate. Matters not covered shall be agreed separately.

Employer: _ _ _ _ _ _ (signature) Contractor: _ _ _ _ _ _ _ (signature)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model contract of dredging project owner 7:

Contractor:

Based on the principle of equality and mutual benefit, the following agreement is reached on the field road project of Puji Town Land Consolidation Project:

1. Responsibility of the Employer: Before the contractor enters the site, clear the obstacles in the construction area and provide the contractor with temporary leveling points and the location and buried depth of underground pipelines within the project scope.

2. Contractor's responsibility: c25 concrete is poured on the existing subgrade, with a width of 4m and a thickness of 16cm, and the project meets the standard of Class IV highway.

Third, the construction method requirements:

1, equipped with mixing equipment and vibrators, vibrators, channel steel, polishers, generators and pulp pumps required for construction.

2, concrete mixture ratio requirements meet the standards.

3, vibrating beam, vibrator must be in accordance with the standard operation, it is forbidden to appear not to use and cope with the construction.

4. The pulp pump and polishing machine should polish the concrete pavement for 3-4 times. It is forbidden to polish and polish dry cement on the concrete pavement.

5. Finish the brushing treatment after pulp lifting.

6, in the concrete pouring must be carried out within 72 hours, every one meter slit, slit requirements to cm,

7. If the above requirements are not met, the Employer has the right to refuse to pay the project payment.

Four, according to the actual engineering quantity and on-site visa settlement.

5. The contractor plans to enter the site to start construction.

Six, the contractor shall carry out the construction in accordance with the technical specifications for earthwork construction, and in accordance with the construction procedures and construction requirements provided by the employer.

Seven, the engineering structure beyond the provisions of article third, the employer shall give on-site visa, as the basis for future settlement.

Eight, each project completed 10000 square meters of quantities, pay 80% of the corresponding project funds; Pay 80% of the total project payment at the end of the project, and pay all the project payment after the project is accepted. Responsibilities of both parties: The Employer must ensure that the obstacles within the project scope are removed on time and shall not delay the contractor's construction progress.

This agreement is made in triplicate. Matters not covered shall be agreed separately.

Employer: (signature)

Contractor: (signature)

Dredging Project Demonstration Contract 8 Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

I. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Two. Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. Project content: (including the main earthwork construction of the river channel and the auxiliary work of completing the main earthwork, including dam building, dam demolition, flood control embankment and embankment filling with drainage, etc.). ).

Four. Engineering standard: 1. River standard: bottom width _ _ _ _ meters, bottom elevation _ _ _ _ meters, and slope ratio _ _ _ _ _. According to the river construction specification, the maximum error of the center line is about 20 cm, the error of the river bottom elevation is not greater than +3.0 cm-20 cm, and the average value is not higher than the design elevation; The bottom width is 30cm, and the average is not less than the design bottom width; The local slope ratio is 1:n( 1 5%), and the overall slope is not steeper than the design value (1:n). Others shall be implemented according to relevant technical specifications and standards. 2. Other requirements:

5. Civilized construction and engineering safety: Party B shall conscientiously do a good job in civilized construction and safety, and Party B shall be responsible for the economic compensation and safety accidents that do occur due to Party B's responsibility during the construction.

Construction time of intransitive verbs: this project starts from _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Seven. Contract price and payment method: the total earthwork volume of this project is tentatively set at _ _ _ _ _ m3, the comprehensive unit price is _ _ _ _ _ _ yuan /m3, and the total contract price is tentatively set at _ _ _ _ _ _ _ _ _ yuan (in figures). Payment by installment is. The final settlement of the project shall be subject to the quantities approved by the supervisor.

Eight. Responsibilities of both parties:

Party A's responsibilities:

1. Before starting work, Party A shall define the relevant tasks and requirements of the project construction according to relevant documents and specifications.

2. Party A shall organize examination and approval in time after receiving the commencement application or commencement report submitted by Party B..

3. Party A shall provide relevant conditions for Party B to organize the construction according to the contents of the bidding documents or the consensus of both parties.

4. Party A shall pay on time according to the payment method stipulated in this contract.

5. Party A shall timely coordinate the contradictions in the construction process.

Party B's responsibilities:

1. Party B guarantees to complete the project tasks with good quality on schedule according to the contract contents (including the bidding documents and written documents agreed by both parties), and will be fined RMB/day if it fails to do so.

2. Before the start of construction, Party B must go through all the formalities related to the construction according to the regulations, including: paying duplicate deposit RMB before signing the contract; Provide Party A with the construction plan; Commencement report, etc. Otherwise, Party B shall not start work. If Party B fails to go through the above procedures within three days, Party A will disqualify Party B from winning the bid.

3. During the project construction, if Party B terminates the project construction without justifiable reasons, Party A will not settle the cost of the constructed part, and will deduct the performance bond. The consequences arising therefrom shall be borne by Party B. ..

4. Party B shall actively coordinate and handle contradictions.

Nine. Others:

X. Matters not covered in this contract shall be settled by both parties through consultation.

XI。 This contract shall come into effect after being signed by the legal representatives or entrusted agents of both parties and stamped with the official seals of the unit respectively.

12. This contract is made in sextuplicate, including two originals and four copies, with each party holding one original and two copies.

Party A (official seal): _ _ _ _ _ _ _ _ _ _; Party B (official seal): _ _ _ _ _ _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _ _ _ _ _; (or entrusted agent): _ _ _ _ _ _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _ _ _ _ _ _; (or entrusted agent):

;