Summary of decoration project supervision work

Time flows like water in a hurry. A period of work has ended. Looking back on the past work, I feel fulfilled and gained a lot. Write a summary of your work, learn lessons and guide your future work. . So how is a general work summary written? The following is a summary of the decoration and decoration project supervision work that I have compiled for you. You are welcome to read it. I hope you will like it. Summary of decoration and decoration project supervision work 1

1. Project overview

1.1. Project name:

1.2. Project location: Baoxi Building, Guangrui Road, Wuxi< /p>

1.3. Construction unit: Agricultural Bank of China Wuxi Branch

Design unit: Jiangsu Tianweidao Architectural Design Co., Ltd.

Construction unit: Wuxi Hexin Architectural Decoration Engineering Co., Ltd. Company

Supervision unit: Jiangsu Construction Association Engineering Consulting Co., Ltd.

1.4. Project characteristics: This decoration project covers an area of ??565 square meters and has a total construction period of 60 calendar days. The project volume is large and the construction period is tight. Various construction units frequently cross-work, making construction coordination difficult.

2. Supervision work progress:

This project started on September 10, 20xx. Our company was entrusted by Party A and officially entered the site on September 10, 20xx. Undertake the supervision work during the decoration construction and maintenance stages of this project. Considering the actual characteristics of this project, the company leaders attach great importance to it, scientifically formulate a supervision plan, and rationally allocate personnel to establish a project supervision agency. The division of labor among the supervision department personnel is as follows: The company appointed Chang Hongquan As the representative of the chief supervisory engineer of this project, Wang Rongliang is the civil engineering supervision engineer, and Li Jun is the hydropower supervision engineer.

Under the leadership of the representative of the chief supervisory engineer, all supervisory engineers worked together and closely, strictly managed and controlled the quality, progress, and investment of the project, and strengthened the management of contracts, information, and safety. , carefully organize and coordinate the relationship between all parties in the construction, ensuring the smooth progress of the project construction, thereby ensuring the realization of the supervision planning objectives.

(1) Quality control

Adhere to decoration construction quality standards, strictly inspect, focus on prevention, and strengthen process quality control. In accordance with the decoration quality control supervision procedures, various supervision measures are taken to ensure the realization of the project quality supervision objectives.

1. Since our supervision department entered the site on September 10, it has been more than half a month since each construction unit entered the site for construction. The quality preparation materials and construction organization design in the early stage of construction have not been reported. Our supervision department After entering the site, a meeting was held between each construction unit and the supervisor under the organization of Party A's project department. At the meeting, our supervision department particularly emphasized that each construction unit should submit a supplementary report on the construction organization design and project organization structure, so as to facilitate our supervision department to carry out supervision. Work. After the construction unit submitted preliminary construction data, our supervision department strictly reviewed the construction unit's "Construction Organization Design" and quality assurance measures to ensure the rationality of the construction plan and the operability of the quality assurance measures. We also organized professional supervision engineers to compile the "Details for the Supervision of Decoration Projects", "Details for the Supervision of Hydropower Projects", and "Details for the Implementation of Safety and Civilized Supervision". During the construction process, the supervision department carried out supervision work in strict accordance with the requirements of the design drawings, "Construction Organization Design" and "Supervision Rules" to ensure that the supervision work was carried out effectively.

2. Review the quality assurance system and management system of the construction unit, carefully check the technical qualifications of the construction unit’s main management personnel and the certificates of workers in special types of work, and require the project managers of each construction unit to be required to work every day At the construction site, it provides a strong organizational guarantee for the realization of quality goals.

3. Supervise the construction unit to do a good job in internal technical communication and ensure the comprehensive implementation of quality management.

4. Strictly review the use of engineering materials. Since the entry time of our supervision department is September 10th, we can only check the relevant material quality certification documents for the materials that entered the site in the early stage. For September 10th, Materials entering the site in the future will be subject to a combination of material arrival and on-site verification of Party A’s designated samples and the requirement to report relevant quality assurance information and inspections during on-site construction to prevent engineering materials with unqualified quality from being put into use. Especially for the main materials that are used in large quantities, such as floor tiles, sand, cement, glass, aluminum steel, partitions, power distribution cables and weak current monitoring system materials, our supervision department did not conduct witness sampling and inspection. Strictly inspect and verify the samples specified by Party A, especially the quality assurance information of the materials that the construction unit must provide, the inspection report and the certificate of conformity. Our supervising engineer requested to report relevant information, but our supervising engineer still insisted on reporting the relevant quality assurance information. materials, otherwise the goods cannot be unloaded. It is required to standardize the procedures for material entry and inspection to prevent unqualified materials from entering the construction site.

5. The supervision engineer conducted inspections and acceptance inspections on the process quality, and promptly discovered problems exposed during the construction, such as: uneven latex paint on the decorated walls, hollow floor tiles, uneven ceilings, There were quality problems such as the water and electricity bridges being out of alignment, and a notice from the supervision engineer was issued promptly, requiring the construction unit to make rectifications.

6. Strict quality "three inspection system" for concealed projects. If the quality standards are not met, on-site supervision and rectification will be carried out. For example, in the wall masonry of urban buildings, the tie steel bars are too short and some have no hooks. When the supervision engineer discovered problems such as the suspension rods of the suspended ceiling project not using special suspension rods as required by the drawings, he immediately requested and urged the construction unit to make rectifications, thereby ensuring the quality of the concealed project.

(2) Progress control

1. After the supervision department enters the site, check whether the construction unit’s preliminary construction preparations are sufficient, confirm whether all equipment conditions are complete, and whether all construction machinery , equipment and personnel are in place.

2. Strictly review the progress plan prepared by the construction unit. Supervision engineers conduct on-site inspections and supervision every day to keep track of the implementation of the progress plan, coordinate and resolve exposed problems in a timely manner, and coordinate and handle various internal and external problems. relationship to ensure the smooth progress of construction.

3. Timely analyze and compare planned schedule deviations, identify problems, and require the construction unit to take necessary adjustment methods and management measures in a timely manner.

4. Through regular project meetings and daily afternoon meetings, we will report the daily construction completion status of each construction unit and the failure to complete according to the construction plan, and solve mutual coordination problems in the construction and outsourcing conditions.

5. The completion date of this project contract is November 10, 20xx. However, due to many engineering changes during the actual construction process, it has added a certain degree of difficulty to the construction process of each construction unit. In view of this Due to the situation, our supervision department requires the construction unit to take measures such as reversing the construction schedule, adding more construction personnel, and working overtime at night to ensure the completion of the node work. 6. In accordance with the requirements of the construction contract, promptly verify the project quantities of completed sub-projects reported by the construction unit, issue payment vouchers for progress payments, and ensure that project funds are received in a timely manner.

7. Organize project progress data at any time, keep project supervision records, and require all construction units to report construction data simultaneously.

(3) Safe and civilized construction supervision

1. After the supervision department entered the site, it first reviewed the safety qualifications and safety assurance system of the construction unit, and strictly inspected the safety position responsibility system and the deployment of safety personnel, supervise construction units to carry out three-level safety education, improve on-site security systems, and provide a strong organizational guarantee for the effective management of safety work.

2. Review the relevant safety technical measures in the construction organization design of the construction unit and review the safe and civilized construction plan, which provides a strong technical guarantee for the effective management of safety work.

3. Supervise the construction unit to equip sufficient safety protection supplies on site, such as safety helmets, fire extinguishers, etc., and conduct daily on-site tracking and inspection of construction electricity consumption to ensure the efficiency of safety supervision work.

4. Frequently inspect the construction site to identify unsafe factors during construction and weak links in safety work, such as crossing electrical wires at the construction site, carpentry chainsaws without protective covers, construction Immediately request the construction unit to make corrections if workers on site smoke, etc. If the construction unit repeatedly fails to correct potential safety hazards, the construction party shall be required to make corrections in writing.

5. On-site construction data management: As of November 1, the construction data reported by each construction unit are basically complete and meet the conditions for completion acceptance. However, the archived data of the final project still needs to be improved, such as the completion of each construction unit No pictures have been submitted.

3. Supervision Conclusion

The project supervision work of the Yehuayuan Branch of the Agricultural Bank of China Wuxi Branch is in progress. We strictly follow the supervision plan and various supervision rules to control the project quality and progress. Supervise on-site construction quality by means of inspections, site inspections, acceptance inspections, etc., use on-site meetings every afternoon, weekly engineering meetings, and issue supervision engineer notices, contact sheets, etc. to discuss and solve actual problems in the project, and use process control, enthusiasm, etc. The service has gained the understanding and support of all parties. No safety accidents occurred in this project, the project quality meets the specification requirements, and the progress is controlled within a reasonable range and time. Summary of decoration project supervision work 2

1. Project overview:

The interior decoration project on the sixth floor of xx branch is located at No. 269, Taipingmenzhi Street, Jianggan District, Hangzhou. The decoration structure type is Frame structure; construction area is 330 square meters; interior design emphasizes the use function of office space while considering economical materials. The overall style is modern and simple, reflecting a high-efficiency office atmosphere. The floor plan includes an office, conference room, dressing room, and storage room. The public parts of the project and the interior walls of the office are all made of latex paint. The conference room is decorated with sound-absorbing panels, and the exterior wall is made of white latex paint; the door is made of Plywood faced wooden doors, the wooden doors used are equipped with stainless steel hinges and door fixers, the cabinets are faced with plywood, and the cabinet doors are equipped with stainless steel hinges. The public areas and offices are made of light steel keel paper-faced gypsum board ceilings with seams. Caulking with putty. The floors of offices, conference rooms, locker rooms, and storage rooms are laminate floors, and 800×800 anti-slip floor tiles are used in public areas and corridors; some windowsills are paved with Chinese black stone. The project started on August 28, 20xx and was completed on October 28, 20xx.

2. Construction units:

Construction unit: xx branch

Design unit: xxx Co., Ltd. Construction unit: xxx Co., Ltd.

< p> Supervision unit: Shanghai Huajin Engineering Consulting Supervision Co., Ltd.

3. Supervision scope of this project

1. The quality, progress, and progress of all interior decoration projects on the sixth floor of xx branch Investment Control.

2. Safety production and civilized construction supervision and management during the construction process.

IV. Basis for supervision

1. Construction Law, Construction Project Quality Management Regulations, Supervision Specifications, Construction Project Construction and Acceptance Specifications, Project Quality Inspection and Assessment Standards, and Architectural Decoration issued by the state Decoration management regulations and acceptance specifications. 2. The construction contract signed between the xx branch and the construction contractor.

3. The entrustment supervision contract signed by xx Branch and Shanghai Huajin Engineering Consulting and Supervision Co., Ltd.

4. Project bidding and supplementary instructions and other documents.

5. Performance of the supervision contract

Entrusted and authorized by the owner's xx branch, our company is responsible for the construction supervision of the entire construction phase of this project.

After receiving the project business, the supervision project department organized dedicated personnel to familiarize themselves with the drawings as soon as possible, assist the owner in making project preparations, and promptly compiled the supervision plan and detailed rules of the project based on the actual conditions on the project site. Regularly prepare supervision work summaries, and clarify the working procedures, methods and requirements of our project supervision department for the project supervision to the construction unit managers on site. This has created favorable conditions for the smooth development of the supervision work. During the entire supervision process, our project supervision department conscientiously performed the quality control, progress control and investment control of the contract, the supervision and management of safe and civilized construction, comprehensively organized and coordinated all aspects of work, and Organize and hold regular supervision meetings in a timely manner based on on-site conditions.

6. Supervision, control and management of the construction process

1. Quality control: During the construction process, inspect the construction site at any time, and promptly notify the construction unit orally or in writing of any problems found. Strictly control the quality of materials entering the site. All materials entering the site must comply with the requirements of the bidding supplementary instructions and design drawings. When the materials enter the site, the certificates and test reports provided by the construction unit will be strictly reviewed. Materials in question will be retested and submitted for inspection. Only after passing the inspection can it be used in the project to ensure the quality of the project and avoid unnecessary rework.

2. Progress control: Before the start of the project, the construction unit is required to prepare the overall project progress plan in a timely manner. During the construction process, the construction unit management personnel, construction machinery and engineering materials are urged to be in place in time. During the project, the construction unit is required to reasonably arrange the investment of manpower and material resources to ensure the smooth implementation of the construction plan.

3. Supervision of safe and civilized construction:

Strictly review the special plan for safe and civilized construction prepared by the construction unit, and require the construction unit to strengthen safety and civilized education for personnel entering the site. On-site decoration materials are classified and stacked and managed by dedicated personnel. In view of the problems existing in the construction of electricity, the construction party is required to make rectifications and implementation in a timely manner.

7. Results of the supervision work

Under the guidance of the xx branch and with the strong cooperation of the construction unit, after less than two months of intense construction, all parties actively cooperated, and the construction unit Consciously construct according to the drawings and specifications. During the construction process, if there are any problems, you can contact the xx branch in time, obey the supervision and management, and promptly rectify and implement problems with the construction quality. Although all parties involved in the construction have done a lot of work, it is inevitable that there will be problems Regarding problems like this and that, we hope that all leaders and experts will provide more valuable opinions so that we can improve in future work.

8. Supervision and acceptance conclusion

The construction party’s self-inspection of all main control projects and general projects of the project has passed, and the supervision and acceptance has passed. The supervision and acceptance conclusion of our supervisory staff on this project is that it is qualified. Summary of the supervision work of the decoration project 3

Hereby, the Supervision Department of the Postal Production Building of Jiangyan District, Taizhou City, stationed at the construction site on November 19, 20XX. With the strong support of the superior leaders, the Jiangyan District Post Office of Taizhou City The supervision work of the production building decoration project was successfully completed. Looking back on the past, our supervision department, under the leadership of superiors and in accordance with the company's requirements, worked hard with colleagues and achieved certain results. The work of the postal production building in Jiangyan District, Taizhou City is now reported as follows:

1. Safety management and control work

Since entering the construction site on November 19, 20XX, this supervision department has always adhered to safety Production, quality first guidelines, strict control: carefully check on-site scaffolding, small machinery, and construction electrical appliances to see if they comply with safety regulations, and adhere to the principle of inspection, recheck, and reuse; carefully check whether special types of work have a certificate for employment , to be true and effective.

Insist on uninterrupted inspections every day in daily work: follow-up inspections of emergencies, leaving no safety dead spots; use the "three no-misses" on the construction site and provide careful guidance; improve the safe construction files .

When potential safety hazards are discovered during the supervision process, we must adhere to the "three no-nonsense" approach. For cases that seriously affect construction safety, organize the construction project department to hold special meetings, implement dedicated personnel to take responsibility, report on the topic and provide responses. Make sure there are no safety hazards overnight.

2. Quality control work

Carefully check the original data of the raw materials entering the site, and conduct witness sampling of the on-site materials to ensure their authenticity; inspect the process We must first check the inspection application materials and then inspect the site to ensure the integrity of the process acceptance procedures; if any non-compliance with the drawings and specification requirements is found during the process acceptance process, we will resolutely notify you of rectification, and re-inspect after rectification, and never allow unqualified processes to be left behind. Next step of the process; conduct uninterrupted inspections of the construction site every day, and dispatch dedicated personnel to stand by areas prone to quality hazards to ensure nothing goes wrong.

For branch acceptance, the supervision department will conduct pre-inspection first. After the acceptance is passed, the construction unit will notify the quality inspection station and the owner for acceptance to ensure that the pass rate reaches above 99%.

3. Civilized construction management and control work

Inspect main roads and safety passages every day, require anti-friction and dust reduction work, and perform weekly fire inspections to ensure that employees have a good rest environment. .

4. Data management work

Since entering the postal production building in Jiangyan District, Taizhou City, this supervision department has started from the beginning to ensure that the data is completely closed, archived in a timely manner, and supervises the construction The unit submits the information first and then accepts it to achieve a virtuous cycle. If the information does not meet the standard requirements, it will be returned and asked to be redone to ensure that the information is complete, authentic and valid. During this period, superior leaders and postal leaders came to the construction site many times to provide guidance, which made great progress in our data work.

5. Internal management work of the Supervision Department

This Supervision Department always adheres to the company as the core, focusing on the interests of the owner, the interests of the construction unit, and the interests of the company. According to the requirements of the drawings and specifications Carry out rigorous work, implement people-oriented management, and strictly implement attendance and monthly reporting systems.

This supervision department always maintains team spirit, cooperates with each other, and divides labor regardless of family. It requires every employee to realize that his or her words and deeds represent the spirit of the company. Looking back on the postal production building project in Jiangyan District, Taizhou City, we realize that only under the leadership of the company and with the help of the owners and construction units, we can achieve today's results. All employees of this supervision department are convinced One is to do our job conscientiously and embody the overall spiritual outlook of our company with team spirit. We will carry forward our strengths and overcome shortcomings with full spirit, take obedience to command as our bounden duty, complete tasks as our mission, and serve our Work hard to reach a new level.