Hua Fu Road, Xietaizi, Olympic Sports Center, Shiping Bridge, Yangjiaping, Tanzikou, Huangjueping, sichuan fine arts institute, Power Plant, Second Yangtze River Bridge, WaiHeping North, WaiHeping South, Jianjiacao, Eggplant Creek, Baiju Temple, Funiu Creek, Jin 'ao Mountain and Tiaodeng South.
Chongqing Rail Transit 18 Line, a *** 19 subway station, passes through Yuzhong District, Jiulongpo District, Banan District and dadukou district. It is a subway line under construction in Chongqing, and its identification color is turquoise.
The first phase of Chongqing Rail Transit 18 Line started construction on 20 19125 October, starting from Hua Fu Road Station in Yuzhong District and ending at Tiaodeng South Station in dadukou district. The first phase is 29.068km long, and there are * * stations 19, including 12 underground stations,/kloc-0 semi-underground stations and 6 elevated stations. Six train formations. It is expected to be completed and opened to traffic in 2023.
Equipment and facilities
Chongqing Rail Transit 18 Line has 1 Jin Ao Temple Depot and 1 Hua Fu Road Parking Lot. 2 Baijusi power plants and 2 main substations; The control center relies on the comprehensive control center of Dazhulin, and is not built separately. The expansion plan of Yuzhong District is to add 28 parking capacity inspections in Jin Ao Temple Depot, and 4 inspections every week and month.
The line is double-track, and the vehicles are mountain vehicles. The catenary with DC of 1500V is used for power supply. The design speed of the train is 100 km/h, and 6 vehicles are grouped in the early and near future, and 7 vehicles are grouped in the long term. Initial allocation 18 train/108 vehicle.