The contents of the quota project of subgrade shaping and rolling and sidewalk shaping and rolling include manual digging of average thickness 10cm, low filling and leveling of the bottom surface, making it form the vertical and horizontal slopes required by the design, and rolling compaction. Keywords subgrade rolling inspection, sidewalk shaping rolling engineering,
Both new and old road reconstruction projects need to be calculated.
Fujian quota says so.